Efficient Planning for Electric School Bus Implementation

Slide Note
Embed
Share

Prepare for the transition to electric school buses by focusing on team collaboration, strategic planning, and effective communication. Understand route details, battery capacity, and charging infrastructure requirements. Collaborate with utilities, optimize charging schedules, and ensure seamless integration of new buses. #MVUSDGoBeyond


Uploaded on Mar 22, 2024 | 2 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. 2023 CASTO School Transportation Business Management Forum Jim Burleson ExecuitiveDirector of Transportation October 12, 2023 1 1

  2. 2 2 2 2

  3. MVUSD Leadership Transportation Team Jim Burleson Executive Director of Transportation James Sanford Transportation Manager Tammy Fawcett Transportation Supervisor Israel Amezcua Lead Mechanic #MVUSDGoBeyond 3 3

  4. SECRETARY& ACCOUNT CLERK 2 DISPATCHERS 5 SCHOOL BUS DRIVERS 117 ( 9 VACANCIES ) SCHOOL BUS DRIVER TRAINEES 22 VAN DRIVERS 3 SCHOOL BUS MONITORS 22 ( 1 VACANCY ) SCHOOL BUS DRIVER TRAINERS 2 BEHIND THE WHEEL TRAINERS 3 MECHANICS 7 SCHOOL BUSES PER MECHANIC 30 TEAM MEMBERS PER MANAGER 54 4 4

  5. 42 (46) Electric Powered School Buses 28 (40) - Renewable CNG Powered School Buses 13 Gasoline Powered School Buses 30 Propane Powered School Buses 5 5

  6. 6 6

  7. 7 7

  8. #MVUSDGoBeyond 8 8

  9. PREPARING FOR YOUR ELECTRIC SCHOOL BUSES SHORT AND LONG TERM PLANNING YOUR TEAM YOUR PARTNERS OUTSIDE BUSINESS SERVICES DEPARTMENTS TRANSPORTATION YARD STUDENTS AND COMMUNITY NEW BUSES AND DRIVERS READY TO TRANSPORT STUDENTS PATIENCE, COMMUNICATION, COLLABORATION, PATIENCE #MVUSDGoBeyond 9 9

  10. LEARN, ORGANIZE, THEN EXECUTE WITH CONFIDENCE KNOW YOUR INDIVIDUAL ROUTE MILEAGES, TIMES, RIDERSHIP, TERRAIN, DRIVERS KNOW YOUR EV BUS BATTERY CAPACITY, RANGE, STUDENT CAPACITY, CHARGING PORT LOCATIONS, ESTIMATED kW s PER MILE, LOCAL WEATHER CONDITIONS FAMILIARIZE YOURSELF WITH YOUR CHARGING SOFTWARE PRIOR TO BUSES ARRIVING, DON T BE AFRAID TO MAKE SPECIAL REQUESTS TO FIT YOUR DEPARTMENTS NEEDS, COMPLETE DATA ENTRY COLLABORATE WITH YOUR LOCAL UTILITY, TALK FREQUENTLY, BUILD EXCITEMNET AROUND YOUR PROJECT, KNOW UTILITY TIERS, RATE STRUCTURES BY TIME OF DAY, KNOW YOUR LOAD LIMIT, MAKE SURE YOUR CHARGING INFRASTRUCTURE IS DESIGNED TO MEET ALL OF YOUR UTILITY NEEDS. BUILD AN EFFICIENT AND COST EFFECTIVE CHARGING SCHEDULE FIT SCHEDULED CHARGING IN YOUR OFF-PEAK HOURS LOOK TO MAXIMIZE SUPER OFF-PEAK HOURS IN THE FALL AND WINTER BE PREPARED TO MONITOR YOUR FIRST FEW MONTHS CLOSELY TO ENSURE BUSES ARE READY TO GO EACH MORNING! THIS IS CRUCIAL FOR THE SUCCESS OF YOUR PROJECT, BE ENGAGED. 10 10

  11. LESS THAN EXCITED. THERE WILL BE THOSE RELUCTANT TO EMBRACE NEW TECHNOLOGY, POLITICAL VIEWS, YARD TALK ADDITIONAL TRAINING HOURS PROFICIENCIES, PRE-TRIPS, DRIVER COMFORT NEW TECHNOLGY SOFTWARE LEARNING CURVES, MECHANICAL FALIURES, CHARGING STATION WOES, INCREASED REPAIR TIMELINES, LENGTHY EQUIPMENT DIAGNOSTICS, UNEXPCTED COSTS BUS MECHANICAL CHALLENGES LOOSE HARDWARE (CHASSIS BOLTS), RUBBING HOSES, ROOF LEAKS, EMERGENCY HATCH LEAKS, POWER STERING HOSE LEAKS, AIR CONDITIONER ISSUES, DOOR SWITCH & CHILD CHECK, DVOM MODULES DUE TO CHARGING HANDLES, TIRES. CHARGER COMPLICATIONS CONNECTIVITY, COMMUNICATION, BUS COMPATIBILITY, WEATHER RESISTANCE, SOFTWARE UPDATES, CABLE MANAGEMENT, 11 11

  12. OPERATING COSTS (fuel only) AFTER 327,517 ELECTRIC SCHOOL BUS MILES COMPLETED 12 12

  13. OPERATING COSTS (fuel & Maintenance) AFTER 327,517 ELECTRIC SCHOOL BUS MILES COMPLETED 13 13

  14. Looking Back What Would You Do Differently? Initial plans would include a micro grid. Select larger bus battery option battery Installed one super charger Started with SCE installing a larger transformer, 1500kva 14 14

  15. MORENO VALLEY AIR QUALITY CAL ENVIROSCREEN IS A TOOL USED TO HELP IDENTIFY COMMUNITIES DISPROPORTIONATELY BURDENED BY MULTIPLE SOURCES OF POLLUTION. THE MORENO VALLEY AREA IS IN THE 98th PERCENTILE OF THE ENVIROSCREEN. THE REPORT SHARES A HIGH PERCENTAGE OF ASTHMA, LOW BIRTH WEIGHT AND CARDIOVASCULAR DISEASE ALL A FACTOR OF THE DANGEROUS AIR QUALITY. IT IS CRITICAL THAT ADDRESS THE POOR AIR QUALITY OF OUR COMMUNITY #MVUSDGoBeyond 15 15

  16. ZERO EMISSIONS DEPLOYING 42 ELECTRIC SCHOOL BUSES, WILL REDUCE CO2 EMISSIONS BY 549 METRIC TONS ANNUALLY. THAT IS THE EQUIVALENT TO REMOVING 260,863 PASSENGER CARS FROM THE STREETS OF MORENO VALLEY! RENEWABLE ENERGY SOLAR PANELS INSTALLED AT OUR PERRIS OPERATIONS CENTER PRODUCE NEARLY A MEGAWATT OF POWER. OUR NEW CNG STATION FUELS 28 OF OUR SCHOOL BUSES WITH RENEWABLE CNG DERIVED FROM CAPTURED LANDFILL GASES. ENERGY REIMAGINED! #MVUSDGoBeyond 16 16

  17. #MVUSDGoBeyond 17 17

  18. Thank You and Let us GO BEYOND! 18 18

Related


More Related Content