2020 Street Department Report and Maintenance Activities Overview

november december 2020 street dept report n.w
1 / 5
Embed
Share

Providing an insight into the November-December 2020 activities of the Street Department, this report showcases initiatives such as the redesign of the Public Works Shop layout, equipment repairs undertaken, street maintenance and repairs, and employee training sessions attended. The report highlights efforts to enhance workflow efficiency, equipment maintenance, and employee skill development within the department.

  • Street Dept Report
  • Maintenance Activities
  • Public Works Shop
  • Equipment Repairs
  • Street Maintenance

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. November-December 2020 Street Dept. Report

  2. Public Works Shop Identify and create initial outline for new shop layout to maximize space and workflow. Each shop bay to be permanently designated for a specific season of the year, (will cut down on constant re-organization and clutter while creating better storage and easy access) with one bay used solely for repairs and maintenance of city equipment and assets. Began office remodel process with purchase and delivery of supplies and items needed. Construction to begin third week of December (12/21/2020). Housekeeping and vehicle maintenance schedule forms have been added and completed daily/weekly for increased accountability and timely repairs. Inventory of perishable items (cold patch asphalt, ice melt, weed killer, joint sealent, salt sand, gravel). IT work on Street Dept. laptop.

  3. Equipment Repairs 2005 Chevy K-2500: Vacuum leak & heater blower fan (Scott s), headlights, backing lights and covers replacement, oil change. 2016 Chevrolet K-2500: Left front tire leak repair. Detachable plow lights repair and re-mount. 2013 Ford F-150: Oil change 2001 International (Blue) Dump Truck: Hydraulic line leak, replace faulty gauges, electrical/lights repair/replacement, oil change (Denning s Transportation). 2005 International (White) Tandem: Plow and taillights replacement, exhaust work, hydraulic hose replacement, oil change (Denning s Transportation). 1991 GMC Sidekick Sander Truck: Electrical/lights repair, plow lights and hydraulic cylinder coupling replacement, dump bed vibrator repair. 2008 Cat 924H Loader: Joystick control and horn adjustment, new hydraulic hoses, new grapple fork tines (Butler Cat). Car trailer: Repair two tire leaks. 2016 Bobcat S-590: New hazard light installation, inspection/tune-up (Butler Cat). 1997 Bobcat 773: Inspection/tune-up (Butler Cat). 2014 Bomag Tandem Roller: Inspection/ oil & filter change. 2002 Elgin Street Sweeper: Replacement of steel gutter brushes, all grease zerks maintenanced, fluids check.

  4. Street Maintenance and Repairs Outline identifying areas of work as well as 2021 crack sealing schedule. (Stockwell) Removal and replacement of Speed Limit sign, post and cleat at intersection of W. 1stAve and Juniper St. that was damaged during Central Basin III construction. Gravel surface maintenance: -Harrison St. between 3rd& 4thAve. -4thAve. between Cleveland St. and Harrison St. -N. Elm between Rummel Ave. and Boynton Ave. Removal of overlaid gravel from 11/10/2020 snow plowing at intersection of 3rdAve. & Harrison St. as well as N. Juniper from ROW to dead end. High traffic areas swept (Main, Elm, 1st, 2nd, 3rd, 4th, 5th)

  5. Training One employee attended Wastewater Collection Webinar by SDARWS December 1-3 (22 hours) for re-certification of water/wastewater collection class 1. Also registered for water/wastewater collection recertification exam. Snow plow/removal training for employees.