2023 EMS Lessons Learned and Control Room Configuration Insights

2023 EMS Lessons Learned and Control Room Configuration Insights
Slide Note
Embed
Share

Dive into key takeaways from the EMS Lessons Learned session, including an analysis of abnormal ACE deviations and control room configurations at the same and different sites. Explore the implications of these insights for reliability, resilience, and security in the power system industry.

  • EMS Lessons Learned
  • Control Room Configuration
  • Power System
  • Reliability
  • Resilience

Uploaded on Mar 12, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. NERC EMSWG Update Wei Qiu, NERC EA ERCOT TWG Conference Call August 24, 2023 RELIABILITY | RESILIENCE | SECURITY

  2. 2023 Monitoring and Situational Awareness Technical Conference Location: WECC, Salt Lake City, UT Date and Time: Tuesday, October 3, 2023, 9am 5pm MT Wednesday, October 4, 2023, 9 am 12pm MT Presentations EMS upgrade PJM and SPP FERC 881/FAC-11 Manitoba Hydro Cloud Integration and Migration MISO Digital Twins in the control room NREL 2 EMS Lessons Learned Vendor Panel - ABB, GE, OSI, and Siemens 2 RELIABILITY | RESILIENCE | SECURITY

  3. EMS Lessons Learned In-process Abnormal ACE due to a Model Translation Error After a scheduled quarterly model update, the entity experienced an abnormal Area Control Error (ACE) deviation from expected ranges. It was identified that the Automatic Generation Control (AGC) application sent invalid set point instructions to the generation fleet due to a model translation error. 3 RELIABILITY | RESILIENCE | SECURITY

  4. Control Room Configuration Same Site Operators and Host servers are at the same site 4 RELIABILITY | RESILIENCE | SECURITY

  5. Control Room Configuration Different Sites Operators and Host servers are at the different sites 5 RELIABILITY | RESILIENCE | SECURITY

  6. Control Room Configuration Different Sites Operators and Host servers are at the different sites 6 RELIABILITY | RESILIENCE | SECURITY

  7. Brainstorm How many utilities are configuring the system like this (the operators and the running EMS servers were in different sites)? Why? Is this a new normal after Covid? Any redundancy design of communications between control centers or between the control center and data center? 7 RELIABILITY | RESILIENCE | SECURITY

  8. Questions and Answers Contact Information: wei.qiu@nerc.net 8 RELIABILITY | RESILIENCE | SECURITY