Acea Annual Conference - Pavement Preservation Projects Overview
This overview covers topics related to pavement preservation projects, including qualifications, procedures, and reviews. It details project qualifications, scope of work reviews, plan submittals, and challenges encountered along the way.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
ACEA ANNUAL CONFERENCE PERDIDO BEACH RESORT ORANGE BEACH, AL MAY 10, 2017 PAVEMENT PRESERVATION PROJECTS ADAM SANFORD, P.E. DESIGN SECTION ENGINEER COUNTY TRANSPORTATION BUREAU
TOPICS COVERED What qualifies as a Pavement Preservation Project? Guidance on Conducting Scope of Work Reviews Plan Submittals and Supporting Documentation
PAVEMENT PRESERVATION PROJECT QUALIFICATIONS Must have an overlay of 225 lbs/sy or less (2 ) NOTE: Overlay must conform to laydown rates found in GFO 6-10. Planing to provide depth for overlay is acceptable. 50% or less of project limits requires spot leveling No widening of lane widths required
Revert back to 3R Procedures SCENARIO # 1 WILL IT QUALIFY?
iIs this road in super? SORRY! SCENARIO # 2 HOW ABOUT THIS ONE? 150 + 250 = 400 Widening too!
TThis one is crooked too! We ve got a winner!! SCENARIO # 3 WILL IT? 150 lbs/sy
SCOPE OF WORK REVIEWS County will be notified when to Contact Region to schedule this review (after initiation-Resolution). New Form Pavement Pres. Scope of Work Serves as both the Project Engineering Record (PER) and the Materials Report Saves Time! Once completed by County, submit to Region for concurrence and they will submit to our office for approval.
PLAN SUBMITTALS Once scope of work report is approved, send in plans to Region and our office for PS&E Review as usual. County Transportation Bureau will coordinate with Region and County to set up time, date, and location of this review. Intent of this new policy is to go from PS&E Review directly to Office Engineer submittal. Another time saver
BUMPS ALONG THE WAY Found that title and summary of quantities sheets still have to be sent to Construction Bureau for DBE goal setting. First several projects still receive cursory review of plan notes, special provisions, and working days from Construction. In turn, our office has to provide all this information to Construction and eventually we will provide it directly to O.E. after PS&E. Baby steps, my friend!
SUPPORTING DOCUMENTS Same as on a normal resurfacing project, except one more thing. Our office needs a list of applicable special provisions from the county on the next submittal after the PS&E. I want to share with you some things I ve learned regarding special provisions
SPECIAL PROVISIONS 12-0095(2) DBE 12-0769(2) Extra & Force Account 12-0105 Cross Slope 12-0879 Award of Contract 12-0198 - Combination Bids 12-1385 Buy America Products 12-0263(3) Asphalt 12-1597(2) Markings & Legends 12-0354 Testing Materials 12-1625 Execution of Contract 12-0355 Mineral Filler, etc. 12-1657(3) Weight Measurements 12-0399(3) Erosion Control 12-1726 Cargo Preference Act 12-0426(3) Liquidated Damages 12-1799 - Mobilization 12-0521 Def. of Terms 12-0530 Prep. Of Proposals 12-0604 Time Extensions 12-0607 Completion Advertisement 12-0643(2) Const. Fuel
QUESTIONS? Adam Sanford, P.E. Design Section Engineer County Transportation Bureau Phone: (334) 242-6719 Email: sanforda@dot.state.al.us Whatever you do, work at it with all your heart, as working for the Lord, not for men, since you know that you will receive an inheritance from the Lord as a reward. Colossians 3:23-24