Advanced Control System for Vertical Cryostat Projects

vertical cryostat kick off metting n.w
1 / 13
Embed
Share

"Explore the hardware and software components of a cutting-edge control system designed for vertical cryostat projects. Follow the project steps, team organization, and application definition for efficient implementation and management."

  • Control System
  • Cryostat
  • Hardware
  • Software
  • Project

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Vertical Cryostat Kick-off metting Control System Presentation

  2. Schedule Control system definition Project organization presentation The benefit of our passed experience

  3. Control System Hardware definition One Siemens PLC architecture 1 CPU S7-315-2PN/DP 5 extension rack for I/O interface cards Cernox, Edwards, MKS, AMI modules Integrated into a single cabinet: 3600 Total length 1200 glass doors 1 socle of 200 height Including adapted power departures

  4. Control System Hardware definition 1 computer (Dell Optiplex) with 1 screen 1 Siemens WinCC software licence embedded All connection between the cabinet and the Cryostat Ethernet connection are not included

  5. Control System Application definition 1 PLC program including all the sequence definition Communication with the specific equipement 1 Scada application allowing the control of all the sequence The alarms and default display The archive of data to display trends Existing template used Standard Information available for Epics

  6. Project organization Team organization IsiiTech 1 Administrative responsible 1 Project manager 1 PLC programmer 1 Scada programmer Electrical partner 1 Electrical installation manager in charge of conception of the cabinet and the cabling 1 Electrical schema designer 1 Electrician team

  7. Project Steps Process studies P&ID validation All the sequence definition Input / Output definition list Hardware Studies To define PLC architecture To define the cabinet plan Taking in charge the connectors definition To optimize the cabling into the cabinet

  8. Project Steps Studies validation PLC Hardware architecture realization Cabinet construction PLC Programming Scada programming Programs test In our office Without the equipment (sequence, manual mode, )

  9. Project Steps Cabinet reception at electrician workshop Cabinet delivery at CD workshop Cabinet Cryostat connection Definitive connection into the cabinet Spare length at the bottom of the cabinet Cryostat sequence tests at CD workshop Up to 4 weeks to test and adjust the program

  10. Project Steps Disconnection On the equipment side (Connectors) Cabinet installation on site (done by CD) Cable installation and Connection Electrical test & unit test: 1 week Sequence test: 4 noncontiguous weeks on site 1 operating manual redaction

  11. The benefits of our experience Connectors optimization Specific equipement knowledge Equipment operation

  12. Warning Multiple Insert: to study ?

  13. Thank you !