Advanced Sumo Robotics Team and Competition Overview

Download Presenatation
sumo robotics sumo robotics n.w
1 / 13
Embed
Share

Explore the world of Sumo Robotics with a dedicated team competing in challenging matches. Learn about the team members, robot specifications, design and customer requirements, as well as the latest generation Sumobot SandFlea. Sponsorship details and engineering requirements are also highlighted for the project. Get insights into the creativity, technology, and competitive spirit that drive the Sumo Robotics Team towards success.

  • Robotics
  • Sumo
  • Competition
  • Team
  • Technology

Uploaded on | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Sumo Robotics Sumo Robotics Team Members: Saud Alabhoul, Jasim Albenali, Mohammad Albaghli, Abdulaziz Kandari Rashid Alfadhli 9/18/2018 Team 18F06 1

  2. Description: Sumorobot 3kg (R/C) Two Sumorobots challenge in a head-to-head match. With following the rules of sumo matches Class Height Width Length Weigh Mega Sumo - R/C unlimited 20.0 cm 20.0 cm 3,000 g Table 1: Measurements Specification:- R/C Controlled Sumo robot Qualified of following the competition Rules Following (Width/Length/Weigh) limitations Team 18F06 9/18/2018 2

  3. Sponsorship of the project & Client Sponsorship of the project & Client -Our Sponsor of the Sumorobot competition will be Northern Arizona University. -Team 18F06 will prove to accomplish all necessary requirement of the sumo bot competition as undergraduates of ME students. Figure 1: NAU Logo -The client will be the ROBOGAMES Competition. Figure 2: ROBOGAMES Logo 9/18/2018 Team 18F06 3

  4. Newest Generation Newest Generation Sumobot SandFlea SandFlea created by Boston dynamics created by Boston dynamics Sumobot Specifications:- Battery & Propane powerd Weigh: 5kg, Height: 15cm, Joints: 5 Capabilities:- Jumps 10m 25 Bounces per charge Figure 3: Sand Flea 9/18/2018 Team 18F06 4

  5. Other similar low Other similar low- -budget budget sumobot sumobot Low-cost 90$ Bluetooth controlled Sumobot Competition ready Figure 4: Android sumobot 9/18/2018 Team 18F06 5

  6. Design Requirements a. Short charging time with long battery life. Lasts 3 rounds each round is 3 minutes. b. R/C robot that does not have sticky substances c. Artbot prepared and Creative Design. d. No hazardous & dangerous material e. The controller does not exceed 75Mhz. 9/18/2018 Team 18F06 6

  7. Customer Requirements 1. R/C Robot Weight I. Weigh 5 II. Durability 3 III. Portable 4 IV. Simplicity 2.5 V. Pausing Capabilities 3 VII. RC Controlled 5 VIII. Safety 4 Table 2:- Measurements 9/18/2018 Team 18F06 7

  8. Engineering Requirements. Engineering Requirements Maintenance Remote Controlled Autonomous Torque Consistency Cost Minimizing Weight Size Power Source Motor Table 4: ENG Requirements. 9/18/2018 Team 18F06 8

  9. House of Quality Table 4: HoQ. 9/18/2018 Team 18F06 9

  10. Gantt Chart 9/18/2018 Team 18F06 10

  11. Budget No Specific Budget Ranges between 1000~2000 Recycling many parts of previous projects Figure 5: Budget Plan 9/18/2018 Team 18F06 11

  12. Questions? 9/18/2018 Team 18F06 12

  13. References References https://www.instructables.com/id/Android-Controlled-Bluetooth- Sumobot-Ultimate-DIY-/ http://blog.aedimensions.com/sand-flea-the-jumping-robot/ https://www.bostondynamics.com/sandflea http://robogames.net/index.php 9/18/2018 Team 18F06 13

More Related Content