AEEC Systems Architecture Updates and Meeting Schedules
Stay updated on the latest developments in AEEC Systems Architecture and upcoming meeting schedules. Discussions include architecture teams' updates, minimum requirements, and future face-to-face meetings. Get insights into architectural phases, including integration options for various systems in the aviation industry.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
ARINC Airline Electronic Engineering Committee (AEEC) Systems Architecture and Interfaces (SAI) Subcommittee Global Aircraft Tracking Team Telecon September 13, 2017 Rev NEW Charles Adler, Project Engineer Peter H. Grau Boeing Commercial Airplanes, Avionics Principle Engineer, (charles.o.adler@boeing.com) ARINC Industry Activities Cell: 206-578-2533
9/13 Agenda a) Intro/plan/status b) Architecture Teams Updates c) Minimum Requirements Discussions
ADT Architectural Phase Schedule 8/16-18 (Wednesday to mid-Friday)(Seattle) GAT team Phase 2 architecture options kick-off face-to-face, Phase 1 finalization Oct (AEEC Mid term) Phase 1 requirements report out (Jessie Turner) Nov GAT team face-to-face Nov ICAO GADSS member informal discussions GAT face-to-face August 16-18 (requirements finalization and architecture study kick-off DRAFT WP Pre- req, ICAO dis Prep Req prep, ICAO discussions report Ongoing reviews, discussions Final WP Pre-req Arch WP KO SEA/Plan RECAP 10/18 8/23 8/30 9/6 9/13 9/20 9/27 10/4 10/11 Analysis, Prioritization/ Relationships
Upcoming Meeting Schedules 1.) Oct 2018 AEEC Mid-Term (Brussels) short report-out of status and work to AEEC Exec Committee (Jessie Turner) 2.) Nov 7th-9th 2017 (proposed) face-to-face GAT meeting to work architectural studies: proposed: (Airbus hosting option being worked for Hamburg). 3.) Nov 14-16th time frame, non-ARINC meeting with ICAO GADSS Advisory Group (Montreal), discuss our work, issues, gaps, 10054 document. 4.) Feb 2018 time frame face-to-face GAT meeting to finalize architectural study, start characteristic development proposed somewhere in US Florida and Seattle option identified. 5.) April 23-26 2018 AEEC General Session (Dallas Tx), Requirements and Architectural Study report approval. March 15 report submitted to Arinc (30 day review start).
Architectures Teams to date 1. Implementation Architectures A. ELT-DT & COSPAS SARSAT Tom Pack, Todd Gracom, Ahmet Senol, Fadl Khalil B. SATCOM INMARSAT Hannes Griebel, Claude Pichavant, Ahmet Senol?, Chuck Adler/Jessie Turner?, Lars Rosenblad, Kent Jacobs C. SATCOM Iridium Claude Pichavant, Ahmet Senol? Matt Drummond, Bill Bergh, Vijay Rathnam, Chuck Adler/Jessie Turner? Skytrac, Lars Rosenblad, Kent Jacobs, Charles Noble, Michael Hooper D. Space-Based ADS-B Jessie Turner, Christophe Hamel?, Chad Brown, Claude Pichavant E. Dissimilar-complimentary/minimal change approaches Chuck Adler, Hannes Griebel, Christophe Hamel, Matt Drummond, Bill Bergh, Vijay Rathnam F. Detection/trigger architecture Chuck Adler, Jessie Turner, Ahmet Senol?, Luis Alves?, Fadl Khalil G. Deployable beacons. Ahmet Senol 2. Integration Architectures A. Airplane Integration (mechanical/structural, electrical, data) Todd Gracom, Hannes Griebel, Skytrac?, Charles Noble, Chuck Adler, Jessie Turner a) Forward-fit (new production) Claude Pichavant b) Retrofit (existing fleets) B. Air-Ground Data Interface C. AOC/Airline Operator Integration D. ADT Operator Integration E. Operator Implementation
Inputs to Architectural Studies Approach small groups develop draft/strawman, review as larger group, update to consensus versions, launch architecture study. Maintain feedback/consistency between groups. 1. Minimum Requirements Set (Jessie, Luis, Chuck) 1. Note include timing/phasing requirements. 2. White Paper Outline/Content (annotated outline)(Chuck, Luis) 1. Functional Block Diagrams for specific implementation Options per framework 2. Key assumptions and dependencies 3. Compliance with Minimal Requirements 4. Additional features supported 1. Normal tracking 2. Abnormal and potential distress tracking 3. Implications for timely recovery of flight data 3. Trigger source assumptions (Jessie, Ahmet, Luis, Chuck)