Aerospace Engineering Department Overview and Achievements
Explore the rich history and present status of the Aerospace Engineering Department at the graduate school, with a focus on master's and doctoral programs, faculty expertise, student enrollment statistics, and notable research areas.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Introduction of Graduate School September 11th, 2014 Department of Aerospace Engineering
History Open Master s Courses 1993.03 Open Doctoral Courses 1996.03 Selected to the first stage of Brain Korea21(BK21 the first stage of Brain Korea21(BK21) ) 1999.09 Open Integrated master & Doctor Degree Courses 2002.03 Selected to the second stage of Brain Korea21(BK21) the second stage of Brain Korea21(BK21) 2006.03 Selected to the Specialized field of PNU the Specialized field of PNU (Advanced transportation system, machine parts) 2008.03 Selected to the Brain Korea 21 the Brain Korea 21 Plus (2013~2019, for 7 years, \350 million a year) Plus(BK21+) (BK21+) 2013.08 Selected to the CK (2014~2018, for 5 years, \420 million a year) the CK Project(University for Creative Korea Project(University for Creative Korea) ) 2013.08 Department of Aerospace Engineering
Present Status Full Full- -time Student time Student Full Full- -time time Teaching Faculty Teaching Faculty Researcher Researcher Staff Staff Laboratory Laboratory Master Master Doctor Doctor Integrated Integrated 9 9 0 0 4 4 7 7 36 36 19 19 2 2 Cho, Kyeum Rae Flight Guidance Control, Orbit Determination Flight Dynamic Flight Dynamic Lab. Lab. Space/Flight Dynamics & Re-entry Guidance Control, UAV, Vision Processing Lee, Dae Woo Applied Aerodynamics & Applied Aerodynamics & Design Lab. Design Lab. Development of high lift devices, grid formation approach and numerical analysis method Oh, Se jong Development of Flexible Forming Technology, Development of Coaxial-Counter Rotating UAV Structural Analysis and Optimal Design, Numerical Analysis for Hydroforming Process, Development of Forming Process using Electromagnetic Force Kang, Beom Soo CAE Lab. For CAE Lab. For Design & Manufacturing Manufacturing Design & Kim, Jeong Heat Transfer & Turbo Heat Transfer & Turbo Machinery Lab. Machinery Lab. Analysis for Flow Characteristic of Turbo machinery, Development of Aircr aft Heat Exchanger Kim, Kui soon Aircraft Structural Design Aircraft Structural Design Lab. Lab. Kim, Wie Dae Fatigue, Damage, FEM, Smart Structural Design & Analysis Aircraft Propulsion & Aircraft Propulsion & Combustion Lab. Combustion Lab. Weakly Weakly- -Ionized Airflow Lab. Airflow Lab. Supersonic Propulsion for High Speed Vehicle, LASER Propulsion System,Detonation Phenomenon, High Integrated Parallel Computing Choi, Jeong Yeol Ionized Weakly-ionized plasmas, MHD; Magneto hydrodynamics, Hypersonic flight vehicles, Computational fluid dynamics methods Bernard Parent Department of Aerospace Engineering
The Number of Students Admission Admission Alumni Alumni Year Year Integrated Integrated Master & Master & Doctor Doctor Integrated Integrated Master & Master & Doctor Doctor Under Under graduate graduate Under Under graduate graduate Master Master Doctor Doctor Sum Sum Master Master Doctor Doctor Sum Sum 2010 2010 53 53 14 14 7 7 0 0 74 74 34 34 18 18 1 1 0 0 53 53 2011 2011 53 53 4 4 2 2 0 0 59 59 41 41 7 7 2 2 2 2 52 52 2012 2012 54 54 12 12 8 8 1 1 75 75 55 55 15 15 2 2 0 0 72 72 2013 2013 55 55 18 18 3 3 2 2 75 75 40 40 5 5 1 1 1 1 47 47 2014 2014 54 54 19 19 5 5 0 0 78 78 38 38 9 9 0 0 0 0 47 47 Average Average 54 54 13 13 5 5 1 1 72 72 - - - - - - - - Total Total - - - - - - - - - - 782 782 175 175 16 16 4 4 977 977 Department of Aerospace Engineering
Graduate Curriculum Master s Course : 24 credit hours for 2 years 6 hours of Basic Courses 12 hours of Major Courses ( including general elective subject) 6 hours of Thesis Research Doctoral Course : 36 credit hours for 2 years 6 hours of Basic Courses 21 hours of Major Courses ( including general elective subject) 9 hours of Thesis Research Integrated Master & Doctoral Course : 60 credit hours for 4 years 15 hours of Basic Courses 33 hours of Major Courses ( including general elective subject) 12 hours of Thesis Research The students can register for 9 credit hours in a semester. Department of Aerospace Engineering
Scholarship Types Types Details Details All tuition fees (including entrance fee) For Type A : 1,500,000 KRW For Type B : 750,000 KRW Teaching Assistant BK21 project Scholarship Master s Course : 600,000 KRW (monthly) Doctoral Course : 1,000,000 KRW (monthly) Outstanding Students All tuition fees ( 436,000 KRW) Others Department of Aerospace Engineering
BK21Plus+ Project Status 2013. 03.~2020. 02. ( For 7 Years) Annual Total Expenses : 350 million won Support for students - Scholarship( over 60% : 210 million won ) : 600,000 /m for Master and 1,000,000 /m for Doctoral - Joining expenses at the International Conference - Publishing expenses of journal or patents Department of Aerospace Engineering
2015 Admissions Schedule Application Application (Web) (Web) 2014.09.15( 2014.09.15( ~09.18( ~09.18( ) ) 2014.12.15( 2014.12.15( ~12.18( ~12.18( ) ) 2015.05.11( 2015.05.11( ~05.13( ~05.13( ) ) ) 18:00 ) 18:00 ) ) ) ) Oral test Oral test 2014.10.10( 2014.10.10( ) ) 2015.01.7( 2015.01.7( ) ) 2015.06.05( 2015.06.05( ) ) Announcement Announcement of of result result 2014.10.21( 2014.10.21( ) ) 2015.02.10( 2015.02.10( ) ) 2015.06.23( 2015.06.23( ) ) Printing bills Printing bills 2015.02.12( 2015.02.12( ) 10:00~ ) 10:00~ 2015.02.12( 2015.02.12( ) 10:00~ ) 10:00~ 2015.8 2015.8 2015.02.12( 2015.02.12( ~02.16( ~02.16( ) ) 2015.02.12( 2015.02.12( ~02.16( ~02.16( ) ) Paying tuition Paying tuition 2015.8 2015.8 ) ) ) ) Except for Except for Masters & Remarks Remarks Intergrated Intergrated Masters & Doctor Doctor http://go.pusan.ac.kr http://go.pusan.ac.kr Department of Aerospace Engineering