Align Base Point Deviation Settlement with GREDP/CLREDP Changes

kp 7 align base point deviation settlement with n.w
1 / 5
Embed
Share

"Learn about the changes in Base Point Deviation settlement aligning with GREDP/CLREDP changes discussed at the Magie Shanks ERCOT RTCTF Meeting on 12/03/2019. The overview includes adjustments to Generation Resource Energy Deployment Performance (GREDP) and Controllable Load Resource Energy Deployment Performance (CLREDP) calculations, focusing on the Average Set Point (ASP) component. Explore the proposed concept and settlement input details for a clear understanding."

  • Base Point Deviation
  • GREDP
  • CLREDP
  • ERCOT
  • Settlement

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. KP-7: Align Base-Point Deviation Settlement with GREDP/CLREDP Changes Magie Shanks ERCOT RTCTF Meeting 12/03/2019

  2. Overview Changes to Base Point Deviation (BPD) charge calculations that align with changes to GREDP/CLREDP. KP-7: Generation Resource Energy Deployment Performance (GREDP) and Controllable Load Resource Energy Deployment Performance (CLREDP) calculations will updated to account changes made to deployments instructions from ERCOT. The ABP and ARI components of the GREDP and CLREDP calculations will be replaced with an Average Set Point (ASP) component, where ASP is equal to the time-weighted average of the Updated Desired Set Point (UDSP), which is sum of a linearly ramped Base Point (Base Ramp) and Regulation Service instruction that the Resource should have produced during a five-minute clock interval. 2 PUBLIC

  3. BPD Settlement Input Current Aggregate Adjusted Base Point (AABP): AABP = AVGBP + AVGREG Proposed Aggregate Adjusted Base Point (AABP): AABP = ASP AVGBP = Average Base Point AVGREG = Average Regulation Instruction ASP = Average Set Point 3 PUBLIC

  4. Proposed Principle Concept The Aggregate Adjusted Base Point (AABP) calculation used in the Base Point Deviation (BPD) Settlement will replace the sum of the Average Base Point (AVGBP) and the Average Regulation Instruction (AVGREG) with the Average Set Point (ASP) component. 4 PUBLIC

  5. Questions? 5 PUBLIC