Analysis of Construction Costs by Complexity and Programs

Analysis of Construction Costs by Complexity and Programs
Slide Note
Embed
Share

This data presents the distribution of construction costs across various projects categorized by complexity levels and programs. It delves into the share of costs, highlighting not complex and moderate projects, sites, and programs. The information is detailed and structured for easy interpretation and analysis.

  • Construction Costs
  • Complexity Analysis
  • Program Distribution

Uploaded on Sep 26, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. EDIA by SC Programs 60% 50% EDIA as a % of Construction Cost 40% 30% 20% 10% 0% ASCR BER BES FES HEP NP SSI Other ES&H Engineering Management 9/26/2024

  2. EDIA by SC Sites 50% 45% EDIA as a % of Construction Cost 40% 35% 30% 25% 20% 15% 10% 5% 0% ANL BNL Fermilab JLAB LBNL MSU ORNL PNNL PPPL SLAC ES&H Engineering Management 9/26/2024

  3. EDIA by Complexity 0.7% 0.7% 28.7% 20.8% 1.2% 9.6% 17.2% 16.7% 9.1% Complex Moderate Not Complex Projects with TPC of $100M or greater Mostly building constructions or renovations Mostly MIE projects 9/26/2024

  4. EDIA by Complexity by Programs 70% 60% EDIA as a % of Construction Cost 50% 40% 30% 20% 10% 0% Not Complex Not Complex Not Complex Not Complex Not Complex Not Complex Complex Complex Complex Complex Complex Complex Complex Complex Moderate Moderate Moderate Moderate Moderate Moderate Moderate -10% ANL BNL Fermilab JLAB LBNL MSU ORNL PNNL PPPL SLAC Complex Projects with TPC of $100M or greater Moderate Consists of mostly MIE projects Not Complex Mostly building constructions or renovations 9/26/2024

  5. EDIA by Complexity by Sites 70% 60% 50% EDIA as a % of Construction Cost 40% 30% 20% 10% 0% Not Complex Not Complex Not Complex Not Complex Not Complex Not Complex Complex Complex Complex Complex Complex Complex Complex Complex Moderate Moderate Moderate Moderate Moderate Moderate Moderate -10% ANL BNL Fermilab JLAB LBNL MSU ORNL PNNL PPPL SLAC Complex Projects with TPC of $100M or greater Moderate Consists of mostly MIE projects Not Complex Mostly building constructions or renovations 9/26/2024

More Related Content