April 2025 Operations Summary and Notable Failures

c ad activity april 2025 n.w
1 / 7
Embed
Share

Explore the detailed operations update for April 2025, covering machine failures, scheduled maintenance, setup activities, and more. Notable system failures are highlighted, including ongoing issues at RHIC and AGS. Continuation of NSRL activities and upcoming beam operations are also outlined.

  • Operations
  • Machine Failures
  • System Issues
  • NSRL Activities
  • Beam Operations

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. C-AD ACTIVITY April 2025 168 Machine Failures Unscheduled Shutdown 144 Scheduled Shutdown 120 Scheduled Maintenance 96 Machine Setup 168 168 168 72 Experimenter Setup Beam Studies 48 Machine Development 24 Physics 0 FY25-week 27: FY25-week 28: FY25-week 29: FY25-week 30: Data courtesy C. Naylor

  2. INTEGRATED FAILURES (GREATER THAN ONE HOUR) BY SYSTEM -- April 2025 100.0% 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% Data courtesy C. Naylor

  3. Operations for BLIP 4/15-22/2025: No BLIP this past week Short 200 and117 MeV exposures took place last week; longer 200 MeV exposure began Monday and is ongoing. 46 hr production 3.12 hr setup 0.55 hr failures Availability: 98.9%

  4. NSRL activity past week: 4/15-22/2025 (as of 0800) NSRL running continues, with various users running NSRL Hours Experimental Setup Failure Machine Development Machine Setup Operator Training Scheduled Maintenance Scheduled Shutdown Science Tandem Au and Linac protons in use, for single ion modes. Failure, 2.67, 2% Science, 16.44, 10% Machine Setup, 17.03, 10% Running 25-A schedule since 3 February. Schedule posted, updates to 28 June for beams & users. 25-C schedule also in planning stages for July- September. Operator Training, 12.53, 7% Scheduled Maintenance, 3.20, 2% Scheduled Shutdown, 116.13, 69% Availability: 94.5%

  5. Notes from Operations Notable failures (>1 hr) RHIC Blue main dipole system failure, ongoing AGS extraction bump failures, ongoing AGS L20 septum failure, ongoing AGS horiz tune meter kicker PS failure, PSI replaced Booster A6 RF fault, PS replaced at PLC Booster B3 RF failure, HLRF power-cycled to respond to functions AGS B3 cold snake corrector quad failure, local/remote & regulation issues Filtered to present running state. Other notes Various Tandem foil changes, Linac trips/resets Not zero... Over 41 hours injector pp setup, other studies (when injector systems are available)

  6. Reminder from Operations MCR beam operations continue Operator/OC shifts continue for NSRL users, 2 shifts/5 days this week and next. NSRL ions from Tandem, Linac protons as required (pending resumption of AGS Au) GCR pending EBIS restart. BLIP production throughout this week, ending 2 May. RHIC beam setup suspended pending warmup/repair AtR beam pending extraction PS failures. AGS Polarized proton setup, other studies continue 2 shifts/5 days pending AGS failures Note: MCR will not be occupied continuously. No OC on duty overnight. Operator remains overnight for BLIP (and OPPIS) Contact CAS in off hours (x2024) for urgent issues when MCR is not staffed. Teams phone setup: awaiting ITD. Contact ITD help desk x5522, Maintenance Coordinator Changes? Time to update is now. Expect calls at all hours. http://directory.pbn.bnl.gov/ CHECK AND EDIT YOUR OWN CONTACT INFO https://www.cadops.bnl.gov/Operations/personnel/call_in_lists/ CHECK YOUR CALLIN LIST: expect contact off-hours Alarm response instructions: Groups prompted for updates

  7. Availability: RHIC Run-25 100.00% Goal, 80.00% 90.00% 80.00% 70.00% 60.00% 50.00% 40.00% Average, 7.9% 30.00% 20.00% 10.00% 0.00% Availability Average Goal

Related