Bird Survey Grid Cell Site Naming Scheme

ecofracnet plot design n.w
1 / 4
Embed
Share

Explore the EcoFracNet and MicroFracNet plot designs for the Breeding Bird Survey grid cell, with a detailed site naming scheme. Understand the numbering system and layout for required and optional plots, ensuring accurate location identification. Check out the zoom-in feature for a closer look.

  • Bird Survey
  • Plot Design
  • Grid Cell
  • Site Naming
  • Numbering System

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. EcoFracNet plot design Site naming scheme BTO Breeding Bird Survey grid cell 900m 900m 221 222 111 112 121 122 211 212 223 113 123 213 131 132 231 232 133 233 100m 100m 300m 300m 311 312 321 322 313 323 331 332 333 required plots optional plots required plots optional plots Note: numbers go clockwise from 1, starting at the top-left triangle at each level of a triad. Thus the top-left sites all start with a 1 , and the top-left within those with 11 .

  2. MicroFracNet plot design

  3. MicroFracNet plot design Note: numbers go clockwise from 1, starting at the top-left triangle at each level of a triad. Thus the top- left sites all start with a 1 , and the top-left within those with 11 . For a zoom-in of the bottom triangle, see next slide. Numbering is chosen so that location of a plot within the design is harder to mess up.

  4. MicroFracNet plot design zoom in Note: numbers go clockwise from 1, starting at the top-left triangle at each level of a triad. Thus the top-left sites all start with a 1 , and the top-left within those with 11 . For a zoom-in of the bottom triangle, see next slide.

More Related Content