Brookfield Volunteer Fire Co. Tower 100 Refurbishment Project Details

brookfield volunteer fire co tower 100 refurb n.w
1 / 6
Embed
Share

Learn about the history, financing, and specifications of the Brookfield Volunteer Fire Co. Tower 100 refurbishment. This project involved replacing electrical components, upgrading lighting to LED, and ensuring compliance with safety standards. Explore images and details of the refurbishment process and the fire apparatus at work.

  • Brookfield Fire Co
  • Tower 100
  • Refurbishment
  • Fire Apparatus
  • Project Details

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. BROOKFIELD VOLUNTEER FIRE CO. TOWER 100 REFURB

  2. TOWER 100 HISTORY First Aerial device in town 2001 American LaFrance/LTI 100 Rear Mount Tower Ladder 1500 GPM Pump 300 gallons water Custom designed for our town Purchased for $680,000.00

  3. TOWER 100 AT WORK

  4. TOWER 100 WORKING

  5. PROJECT FINANCING Refurb $325,000 15-20 years $16,000 - $22,000 Replace $1,500,000 20-25 years $60,000 - $75,000 Cost Years of Service Cost per Year Compliance with Safety Standards BVFC Contribution Town Fire Apparatus Reserve $ 67,000 $258,000

  6. REFURBISHMENT SPECIFICATION Replace Electrical Components Remove Ladder, Turntable & Outriggers Replace Scene Lighting with LED Disassemble, Strip Paint & Inspect Replace Emergency Lighting with LED Blast, Prime & Paint Rust Protect Frame Reassemble & Install on Apparatus 3rd Party Complete UL Inspection All Welds Inspected Delivered 11/16/19 Flush & Reseal Hydraulic System Work Completed May 2020 Replace Ladder Heel Pin 6 months Follow-up Visit Replace Aerial Power Take Off (PTO)

Related


More Related Content