Capping Local RA Requirements at System RA Requirements

Capping Local RA Requirements at System RA Requirements
Slide Note
Embed
Share

ISO proposes to cap the local resource adequacy requirement at the system level, addressing concerns for load serving entities with differing capacity needs. The proposal aims to prevent over-committed capacity and ensure reliability by implementing replacement rules for outages. The local requirement is limited to the system requirement on a monthly and annual basis, promoting grid stability and efficiency.

  • ISO proposal
  • Resource adequacy
  • Load serving entities
  • Capacity requirement
  • Grid stability

Uploaded on Feb 21, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Capping Local RA Requirements at System RA Requirements February 9, 2015 Karl Meeusen California ISO

  2. ISO proposes to cap the local RA requirement at the system requirement Addresses replacement requirement concerns for LSE s with a local capacity requirement greater than a system capacity requirement Local resource on planned outages are also automatically considered system resources and maybe subject to replacement requirement for the outage The additional capacity offers limited additional local reliability benefits Consistent with proposal made by ISO in the Reliability Services stakeholder initiative Page 2

  3. Benefits of the ISO proposal Prevents other load serving entities from taking outages and leaning on the over-committed capacity Due to ISO replacement rule, the LSE may be required to replace an outage resulting in the LSE s total capacity in aggregate to be beyond the load serving entity s peak demand and reserve margin requirement Page 3

  4. Local requirement capped at the system requirement in monthly and annual showings 2500 2000 1500 RA MW 1000 500 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Local RA requirement System RA requirement Page 4