Centre of Excellence Progress Report in Lipid Science at Harcourt Butler Technical University

progress report of the centre of excellence teqip n.w
1 / 8
Embed
Share

Explore the progress report of the Centre of Excellence at Harcourt Butler Technical University focusing on Lipid Science. The report covers achievements, publications, expenditure details, and more from April-Sept 2016.

  • Progress Report
  • Lipid Science
  • Harcourt Butler Technical University
  • TEQIP-II
  • Research & Training

Uploaded on | 2 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Progress report of the Centre of Excellence (TEQIP-II) Name of the CoE: Applied Research, Training and Education in Lipid Science Name of the Institution: Harcourt Butler Technical University (formerly Harcourt Butler Technological Institute), Kanpur - 208002 (U.P.) Name of the Centre Coordinator: Prof. V.K. Tyagi Contact details (email and mobile) Vinod_tyagi1960@yahoo.co.in, 0721456064

  2. Half-yearly progress report April-Sept 2016 No. Deliverable planned Actual achievement 1 Organizing 03 Training Programmes Organizing 02 Faculty Development Programmes Organized 03 Training Programmes 2 Organized 01 Faculty Development Programme 3 Organizing Expert Lectures from Industry Professionals Organized Lectures from Industry Professionals 4 Organizing an International Conference To be organized 5 Procurement & payment of Instruments Procured the Instruments except 01. Payment process in progress

  3. Publications during the period (only publications listed in Scopus/Web of Science) Title Author Name of the Journal Date of publication Role of Surfactants in Protection of Corrosion P.k. Kamani Paintindia May, 2016 Adhesion: A key Property of Paints and Coatings Durgesh Kumar Soni & P.K. Kamani Paintindia June 2016 Corrosion of Non metallic materials. (Part - I) Nikhil Arora D.K. Soni & P.K. Kamani Paintindia Aug, 2016 Corrosion of Non metallic materials. (Part - II) Nikhil Arora D.K. Soni & P.K. Kamani Paintindia Sept, 2016 Mathematical modelling of swelling for Analyzing the effect of high and low non-ionic monomer for poly (AM-co-HEA-co-AA) hydrogels; Seema Awasthi, Reena Singhal Reena Singhal Journal of polymer material Vol. 33, No.2, June 2016, 271- 292

  4. PhD scholars attached to the CoE (if any) : Nil Names of PhD scholars enrolled Year of enrolment

  5. Expenditure and fund position (in Rs. Lakh only) Opening balance on 1stApril 2016 (Rs. in lacs) Amount received during April-Sept 2016 (Rs. in lacs) Amount Spent (Rs. in lacs) Balance available (Rs. in lacs) 99.97 Nil 73.27 26.70

  6. Details of Expenditure made during this period: (in Rs lakhs) Item Expenditure (Rs. in lacs) Equipment purchase 62.69 Research expenses (consumables) Nil Research related travel 1.75 Training 3.08 Any other (specify) Assistantship IOC 4.64 1.11 Total (This total should match with Col 3 of Table IV) 73.27

  7. Half yearly Plan for the next half year (October-March 2016) Deliverable Likely cost (in Rs lakh) Organizing Expert lectures 6.00 Organizing National & International Conference Organizing National Workshops 15.00 4.00 Undergoing Industrial Training by Faculty Members 6.00 Attending Workshops, Seminars, FDPs by Faculty Members 10.00 Organizing FDP 4.00 IOC 5.00 Assistantship (for M.Tech students) 3.00 Organizing Training Programmes 4.00 Industrial Visit by Faculty Members & Students 3.00

  8. Revised Action Plan of CoE