Changes to Market Facing Reports in Energy Industry

kp6 changes to market facing reports n.w
1 / 8
Embed
Share

Explore the upcoming changes to market facing reports and interfaces in the energy industry with a focus on NPRR863 implementation. See a list of existing reports that will be adjusted or removed, as well as new reports that will be added to enhance efficiency and compliance.

  • Energy Industry
  • Market Reports
  • NPRR863
  • Report Changes
  • Interface Updates

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. KP6 - Changes to Market Facing Reports Aaron Townsend RTCTF November 19, 2019

  2. Market Facing Reports and Interfaces Several of the existing market facing reports will be changing with the implementation of NPRR863 (i.e., conversion to new AS Types) For RTC related changes, we have focused on the report list existing on MIS under the Reports and Extracts Index tab as well as the UI on ercot.com We have attached a list of reports and have indicated whether we think an existing report will need to be adjusted or removed, and have created line items for new reports that we believe will need to be added. We have found that 261 existing reports are structurally ready for RTC and will not need a change. 2 PUBLIC

  3. Change 45 Reports 2-Day Real Time Gen and Load Data Reports 48-Hour Highest Price AS Offer Selected (DAM) 60-Day Current Operating Plan 60-Day SCED Disclosure Reports - Gen Resource data 60-Day SCED Disclosure Reports - Load Resource data 60-Day SCED Disclosure Reports - QSE Self-Arranged AS 7-Day Event Trigger Posting - AS MCPC Greater than 50xFIP (DAM) AS Obligation and Responsibility (DAM) CLREDP Acceptable Performance Criteria and PRC Variables Complete Current Operating Plan Data Controllable Load Resource Base Point Deviation Charge for Over-Consumption Variables Controllable Load Resource Base Point Deviation Charge for Under-Consumption Variables ERCOT Fundamentals Training Manual ERCOT Market Information List ERCOT Summary Dispute Report Historical Real-Time ORDC and Reliability Deployment Price Adders and Reserves Historical Real-Time ORDC and Reliability Deployment Prices for 15-minute Settlement Interval Market Submission Validation Rules Monthly Generation Resource Energy Deployment Performance Report Monthly Non-Spin CLR Performance Report Monthly Non-Spin Generation Performance Report QSE Ancillary Services Capacity Monitor 3 PUBLIC

  4. Change 45 Reports, continued Real-Time ORDC and Reliability Deployment Price Adders and Reserves by SCED Interval Real-Time ORDC and Reliability Deployment Prices for 15-minute Settlement Interval Responsive Reserve Performance QSE Summary Report for Non CLRs Responsive Reserve Performance Report for Generators and CLRs RTD Indicative ORDC and Reliability Deployment Price Adders and Reserves RTM Price Corrections Short-Term System Adequacy Report System-Wide Offer Cap UI- Ancillary Service Obligations Notification UI- Ancillary Service Offer Awards UI- Ancillary Service Offers UI- Ancillary Service Trades UI- Awarded AS UI- Confirmed and Unconfirmed Ancillary Service Trades UI- Confirmed Trades UI- Current Operating Plan (COP) Submissions/Retrievals UI- Market MCPCs UI- Real-Time LMPs for Latest SCED Run Display UI- RTD Indicative LMPs by Load Zones or Hubs Display UI- Unconfirmed Trades UI- Unconfirmed Ancillary Service Trades Website- System Ancillary Service Capacity Monitor Website- Capacity Available to SCED 4 PUBLIC

  5. Remove 15 Reports 60-Day SASM Disclosure Reports - Gen AS Offer Awards 60-Day SASM Disclosure Reports - Gen AS Offers 60-Day SASM Disclosure Reports - Load AS Offer Awards 60-Day SASM Disclosure Reports - Load AS Offers Hourly RUC Ancillary Service Demand Curves IMM Software Real-Time Co-Optimization Input Files LOLP Distribution by Season and TOD Block Monthly Summary of Ancillary Service Supply Responsibility Failure Monthly Summary of Resource AS Supply Insufficiency at 1430 Resource AS Supply Insufficiency at 1430 SASM Aggregated Ancillary Service Offer Curve SASM MCPC by Ancillary Service Type Total Ancillary Service Procured in SASM UI- Get SASM ID List Weekly RUC Ancillary Service Demand Curves 5 PUBLIC

  6. New 16 Reports 2-Day Ancillary Services Reports (RTM) 48-Hour Highest Price AS Offer Selected (RTM) 60-Day DAM Disclosure Reports AS Offers (not associated with a Resource) 7-Day Event Trigger Posting AS MCPC Greater than 50xFIP (RTM) Aggregated Ancillary Service Offer Curve (RTM) AS Obligation and Responsibility (RTM) Daily RUC Hourly AS Capability DAM Ancillary Service Demand Curves Historical RTM Clearing Prices for Capacity Hourly RUC Hourly AS Capability RTD Indicative RTC MCPC RTM Ancillary Service Demand Curves RUC Ancillary Service Demand Curves SCED Clearing Prices for Capacity Weekly RUC Hourly AS Capability Website- RTM MCPCs display 6 PUBLIC

  7. Proposed Principle Concept and Next Steps Principle concept Existing market-facing reports and user interfaces will be removed or modified and new market-facing reports and user interfaces will be created as necessary to implement RTC and achieve the key principles developed by the RTCTF. The list of reports and user interfaces above will be used to guide the development of Protocol language for RTC. Next step will be for the group to review the ERCOT list Additional reports that can go away? Additional reports that need to be modified? Additional new reports needed? 7 PUBLIC

  8. Questions PUBLIC

Related


More Related Content