Construction Manager at Risk Services for Kaspar Electrification Project

rfp no 2022 260 n.w
1 / 12
Embed
Share

This Request for Proposal (RFP) outlines the scope of work, project background, future GMPs, and schedule for the construction phase of the Kaspar Electrification Charging Infrastructure project. The RFP includes details on fast and slow charging installations, pre-construction services, and the timeline for construction activities.

  • Construction
  • Request for Proposal
  • Electrification
  • Project Management
  • Infrastructure

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. RFP No. 2022-260 Construction Manager at Risk Services Kaspar Electrification Charging Infrastructure Pre-Submittal Meeting 2:00 PM June 24, 2022

  2. Agenda Introductions/Roles Project Background Contract Future GMPs Scope of Work Scope A: Fast Charging Scope B: Slow Charging Schedule RFP Submittal Q&A

  3. Introduction/Roles Mountain Line: Project Manager: Anne Dunno Mountain Line: Procurement: Heather Higgins Design Team: HDR and subconsultants AEI (Electrical) and Dibble Engineering (Civil)

  4. Project Background

  5. Contract Future GMPs Mountain Line is seeking future grant funding for associated electrical resilience (ex: generator). Contract will enable future GMPs for future infrastructure and charging equipment which The contract term will be for five (5) years from the effective date of the contract, with five (5) additional one-year optional extensions.

  6. Scope of Work 1) 2) 3) Pre-Construction Services GMP Submittal Scope A & Scope B Construction Services Scope A: Fast Charging Trenching & Install Conduit/Wiring Install concrete pads, vault(s) Acquire and install electrical switchboard Install pantograph & cabinets (Acquisition by Owner) Coordinate with APS: new transformer/meter Coordinate w/ pantograph vendor for testing/commissioning Scope B: Slow Charging -Outlet upgrades in Shop 2

  7. Scope A: Fast Charging 15% Plans

  8. Scope B: Slow Charging

  9. Schedule Construction Phase Schedule: NTP: ~August 19, 2022 Pre-construction: August-February 2023 95% Design Plans Due August 18, 2022 Anticipate pre-con activities for Owner/DP meetings, 95% plan constructability review, site logistics planning, procurement long lead items, City permit coordination Construction: February-June 2023 - Estimate pantograph delivery by February 2023

  10. RFP Submittal Qualifications Relevant Experience, Project Team & Approach Pricing (Attachment 16) A. Pre-construction. Provide not to exceed pricing for pre-construction services. $________ B. Construction Phase General Conditions Costs. Provide Monthly not to exceed General Conditions Costs. $___________ C. Construction Phase Profit and Overhead Fee. A Fee in excess of 5% of the total cost of the Project may be considered non-competitive. Provide Fee ___________%.

  11. RFP Submittal (continued) Federal Requirements Davis Bacon Wages (Attachment 17) Buy America

  12. Q&A Session Submit questions to Heather Higgins via email by 5:00 PM, Friday July 1 to: Purchasing@naipta.az.gov