Cornell University Fire Protection Systems Acceptance Requirements
This document outlines the fire protection systems acceptance requirements for projects at Cornell University to ensure compliance with applicable codes and standards. It covers topics such as plan reviews, fire protection system shutdowns and impairments, and requirements for different levels of impairments, providing essential guidance for maintaining fire safety on campus.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
2018 Manual for Planning and Execution of State Permanent Improvements Part II
2018 OSE MANUAL REVISIONS The 2018 OSE Manual will be promulgated from November 1, 2017 until January 1, 2018 when the 2018 Manual will become effective. It will posted on the OSE website and advertised in SCBO and the State Register.
General Modifications Cleaned up the entire manual to eliminate anything that was not considered to be necessary or legally required. Corrected web links and abbreviations. Tried to provide consistent terminology.
Chapter Revisions Chapter 1 1.7.5 Project Numbering B. OSE uses Project Phases (up to two alphanumeric characters) to identify smaller elements of a large project when an Agency plans to award separate design and/or construction smaller elements. (Note: If a PIP that exceeds the Agency construction certification is split into smaller projects, each smaller project must be submitted to OSE for review and approval.) contracts for those
Chapter Revisions Chapter 2 Name Change: Small and Minority Business Assistance Office (SMBAO) has become the Division of Small and Minority Business Contracting and Certification (SMBCC) Department of Administration. within the
Chapter Revisions Chapter 3 Combined Chapters 3, 3.1, 3.2 & 3.3 into one named: Chapter 3 Project Planning
Chapter Revisions Chapter 4 4.3 SMALL PROFESSIONAL SERVICES CONTRACTS (FEES OF $25,000 OR LESS) 4.3.7 The Agency must use a letter proposal with the South Carolina Small Professional Services Contract Terms and Conditions (SE-240) or the Professional Services Incidental Services Contract (SE-235) to serve as the contract. agreement, the Agency must submit a copy to OSE for information purposes using the Transmittal of Small Professional Service Contract (SE-230). After executing the Professional 4.4 LARGE PROFESSIONAL SERVICES CONTRACTS 4.4.7 Negotiating Professional Services Contracts The Agency should become familiar with the standard professional services contracts, SCOSE versions of the AIA Document B101, B133, B132 and the Professional Services Incidental Services Contract (SE-235). During the review of the standard contract, the Agency should ask and answer any number of questions.
Chapter Revisions Chapter 5 Combined Chapters 5, 5.1 & 5.2 into one named: Chapter 5, Design/Construction Document & Construction Standards Moved Code Tables and Permits to Appendix H. Deleted the following section: 5.8 PROHIBITED BUILDING MATERIALS A. Fire Retardant Treated Wood: Due to the significant expense the State has incurred removing and replacing failed fire retardant treated wood in structural applications, the Agency may not use fire retardant treated wood, regardless of treatment process, in State buildings. However, with OSE approval, the Agency may use fire retardant treated wood in low humidity locations for non-structural purposes.
Chapter Revisions Chapter 6 Moved DISCUSSION ITEMS from the back of this chapter to Appendix B. PRE-BID CONFERENCE
Chapter Revisions Chapter 7 Moved PRE-CONSTRUCTION CONFERENCE DISCUSSION ITEMS from the back of this chapter to Appendix B.
Chapter Revisions Chapter 9 Eliminated the Cost Guide and Multiplier method of awarding construction IDCs.
Chapter Revisions Chapter 11 Combined Chapters 11.1 & 11.2 into one named: Chapter 11 Construction Management at Risk (CM-R)
Chapter Revisions Chapter 12 Combined Chapters 12.1 & 11.2 into one named: Chapter 12 Design-Build, Design-Build-Operate- Maintain & Design-Build-Finance- Operate-Maintain
Chapter Revisions Chapter 13 Combined Chapters 13.1 & 13.2 into one named: Chapter 13 Agency Certification for Construction Procurement and Code Review
Appendix Revisions Appendix A Professional Services Modified SE-210, Invitation for Professional Services to work with the new SCBO. Added the SE-213, Selection Committee Report for Interview Selection. The SE-214, Confidentiality and Conflict of Interest Policy, is now on one page. SE-215, Committee Member requirement to use whole numbers only. SE-220 Eliminated separate column for Stage I services break-out. A/E Evaluation added
Appendix Revisions Appendix B Design-Bid-Build Modified SE-310, Invitation for Design-Bid- Build Construction Services to work with the new SCBO and clarify use with name change. Modified SE-330 & SE-332 to add a column on page BF-2 to list License Classification. Added Pre-Bid and Discussion Items. Pre-Construction
Appendix Revisions Appendix C Construction Management at Risk Modified SE-410, Invitation for CM-R Services to work with the new SCBO. Added the SE-412, Selection Committee Report for RFQ CM-R. Added the SE-413, Notification of Prequalification CM-R. The SE-414, Confidentiality and Conflict of Interest Policy, is now on one page.
Appendix Revisions Appendix D Indefinite Delivery Contracts Modified SE-610, Invitation Services Indefinite Delivery Contract, to work with the new SCBO. Added the SE-613, Selection Committee Report for Interview Selection - IDC. The SE-614, Confidentiality and Conflict of Interest Policy IDC, is now on one page. for Professional
Appendix Revisions Appendix E Design-Build Created 700 series of forms to be used on all Design-Build project.
Appendix Revisions Appendix F OSE Permits, Agreements and Optional Forms Deleted the SE-311, Invitation for Minor Construction Quotes.
Appendix Revisions Appendix G Inspection and Material Testing Deleted SE-970, Inspection Material Testing Report
Appendix Revisions Appendix H Glossary Glossary has been deleted and replaced with: OSE CODE TABLES AND CERTIFICATIONS
Appendix Revisions Appendix I OSE Guides and Handbooks Deleted the following: Certificate of Independent Price Determination Cost Estimating Guild Uniformat II Guide to Bid Payment and Performance Bonds RFP Discussions RFP Handbook 2011 The following remain: Prequalification Handbook Website Verification for Surety Companies
No red-lined copies of the Manual will be available due to combining chapters, but this presentation will be published on the OSE website. Please review the entire 2018 Manual on the OSE website and make comments as directed. Any suggestions before November 1, 2017 can be sent directly to Margaret Jordan (mjordan@mmo.sc.gov).