Costa Mesa Freeway SR-55 Improvement Project Overview

costa mesa freeway sr 55 improvement project n.w
1 / 14
Embed
Share

Discover the Costa Mesa Freeway (SR-55) improvement project, featuring proposed build alternatives, key project goals, and project phases timeline. Partnership with OCTA and Caltrans aims to increase freeway capacity, reduce congestion, and enhance mobility between interchanges for better operational efficiency.

  • Costa Mesa
  • Freeway
  • Improvement Project
  • Transportation
  • California

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Costa Mesa Freeway (SR-55) Improvement Project I-405 to I-5

  2. I-5 to I-405 Segment Area End project Begin project

  3. SR-55 between I-5 and I-405 Overview Borders Santa Ana, Irvine & Tustin Partnership with OCTA & Caltrans Funded by Renewed Measure M Existing conditions 4 general purpose lanes 1 high-occupancy vehicle lane 295,000 average daily vehicles

  4. Key Project Goals Increase freeway capacity Reduce congestion Increase mobility Deliver operational improvements between interchanges

  5. Proposed Build Alternatives Alternative 1 Add auxiliary lane between each interchange Alternative 2 Add fifth general purpose lane in both directions Alternative 3 Combines alternatives 1 and 2 Alternative 3 Modified Add one general purpose lane, one carpool lane and auxiliary lanes in each direction Alternative 4 Add carpool lane, auxiliary lanes in each direction

  6. Baseline Schematics

  7. Alternative 1 Schematics

  8. Alternative 2 Schematics

  9. Alternative 3 Schematics

  10. Alternative 3 Mod. Schematics

  11. Alternative 4 Schematics

  12. Project Phases & Timeline Preliminary Engineering and Environmental Technical Studies Early 2017 Draft Environmental Document (Recirculation for comments on Alternative 3 Modified) Environmental Clearance and Approval Mid-2017 Late 2017 Final Design Early 2018 to late 2020 Construction Mid-2021 to mid-2024

  13. Next Steps Re-circulate draft ED and PR for public comments on Alt 3 Modified Spring 2017 Select Preferred Alternative Mid-2017 Finalize Environmental Document September 2017 Begin Design Phase December 2017

  14. Contact Information Chris Boucly OCTA Public Outreach Jessica Lopez OCTA Public Outreach 714-560-5326 cboucly@octa.net 714-560-5766 jlopez@octa.net www.octa.net/SR55