CR Drafting Updates for ISAC and 7-24 GHz Discussions

3gpp tsg ran1 116bis r1 240xxxx changsha china n.w
1 / 5
Embed
Share

Explore the latest developments in CR drafting for ISAC and 7-24 GHz discussions in the 3GPP.TSG.RAN1#116bis meeting. The conclusions highlight new functional inclusions, validation outcomes, and proposals for new sections to enhance the studies. Stay informed about the advancements in this crucial telecommunications domain.

  • CR Drafting
  • ISAC
  • 7-24 GHz
  • 3GPP
  • Telecom

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. 3GPP TSG RAN1#116bis R1-240xxxx Changsha, China, April 15 19, 2024 Agenda Item: 9 Document for: Discussion and Decision On the CR drafting for ISAC and 7-24 GHz Xiaomi, AT&T, Intel, ZTE, Samsung

  2. Background In R1-2402648, a proposal on how to incorporate outcomes of ISAC SI and 7-24GHz SI was given A further joint offline session on ISAC and 7-24GHz was held Based on the outcomes of the joint offline session, the proposals are updated

  3. Conclusion (1) New functional inclusions and changes from ISAC and 7-24 GHz (i.e. near field and spatial non-stationarity) are suggested to be added to separate new (sub) sections. RAN1 may discuss further as needed if any other (sub)-section(s) would be amended, including the addition of separate new (sub) section(s), as part of the work for 7-24 GHz and ISAC. RAN1 will proceed with the two studies with the assumption that RAN1 will agree two separate CRs, one for each SI. Note: if certain function is not necessary, the related sub-section can be revisited later

  4. Conclusion (2) For the outcome of validation, whether to replace legacy parameters or include them as additional/alternative parameter set will be determined later when study has progressed further. 7-24 GHz SI may introduce new (sub)-sections for additional component under section 7. [7.2 for scenario] 7.6.X Modelling of near-field propagation 7.6.Y Modelling of spatial non-stationarity propagation

  5. Conclusion (3) New section 7.9 can be created for ISAC, with following sub-sections: 7.9.1 for scenarios 7.9.2 for additional components, at least the following would be considered object modeling including RCS aspects pathloss and LOS probability fast fading including target channel, [background channel] Method to combine the target channel and background channel spatial consistency [Mobility of Tx/target/Rx] 7.9.3 for LLS 7.9.4 for calibration [7.9.x is introduced, If ISAC impacts the section 8 of map-based model]

Related


More Related Content