Deciphering SIRDSIRD - Unlocking Cryptic Messages

Deciphering SIRDSIRD - Unlocking Cryptic Messages
Slide Note
Embed
Share

Unravel the mystery of the cryptic message "SIRDSIRD" with our comprehensive guide. Dive into the world of secret codes and ciphers as you learn the techniques and methods used in decoding such enigmatic texts. Explore the history behind encryption and decryption, and enhance your problem-solving skills in deciphering hidden messages. Whether you're a puzzle enthusiast or a code-breaking novice, this fascinating journey into cryptography will challenge and engage you at every turn.

  • Cryptography
  • Decoding
  • Secret Codes
  • Ciphers
  • Encryption

Uploaded on Feb 23, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. SIRD SIRD

  2. 26 Projects- II Batch have to be completed by March 2017. On-going Projects ( Total 83) . Bring in to Part of District Irrigation Plan(DIP) Livelihood/Production System Performance below the desired Level.

  3. NRM Activities: Thrust to the water harvesting Structures- GOI Needs Monthly Progress Report of Irrigation Structures Created Convergence with MGNREGA A Module developed in Alappuzha District to be shared. Performance of WDT (Watershed Development Team) is to be evaluated and to reduce the Strength Report to Submit.

  4. From 2016-17 the Other Components of DIP Agriculture, Soil Conservation, Irrigation, etc . to be used as gap filling to the existing on-going Programmes (Based on DPR) MIS to be tallied with the utilization certificate already submitted to GOI. Funds Transfer in PFMS to be done Properly.

  5. Uploading Photos in Shrishti potral is meagre.\ Submite ATR ( Action Taken Report) of Preparatory Phase evaluation Report. Parking Funds in the Districts to be viewed Seriously. June 5th World Environment Day Campaign as IEC in Watershed Areas.

  6. Project Name Project Cost Expenditure up to 31/03/2016 Expenditure on 04/2016 Total Expdt Balance % of Expenditure against PC PATHANAMTHITTA Ranni Pulikkeezhu Mallappally Koippuram 593.62 420.46 607.82 426.04 2047.94 814.08 580.56 660 466.8 2521.44 219.5 159.38 45.02 39.96 463.86 0.96 0.72 7.16 0.8 9.64 220.46 160.1 52.18 40.76 473.5 27.08 27.58 7.91 8.73 18.78

  7. Project Name Project Cost Expenditure up to 31/03/2016 Expenditure on 04/2016 Total Expdt Balance % of Expenditure against PC KOLLAM Ithikkara Pathanapuram Vettikkavala Chittumala Anchal 605.28 599.27 219.5 418.6 446.46 2289.11 737.55 740.88 274.35 467.76 458.25 2678.79 131.38 138.58 54.37 46.73 11.49 382.55 0.89 3.03 0.48 2.43 0.3 7.13 132.27 141.61 54.85 49.16 11.79 389.68 17.93 19.11 19.99 10.51 2.57 14.55

  8. Project Name Project Cost Expenditure up to 31/03/2016 Expenditure on 04/2016 Total Expdt Balance % of Expenditure against PC THIRUVANANTHAPURAM Vamanapuram Chirayinkkezhu Pathencode Kilimanoor Vamanapuram 909.73 734.12 876.7 612.76 413.76 3547.07 1123.8 816.4 913.9 651.2 429.9 3935.2 202.57 81.48 36.75 37.86 15.41 374.07 11.5 0.8 0.45 0.58 0.73 14.06 214.07 82.28 37.2 38.44 16.14 388.13 19.05 10.08 4.07 5.90 3.75 9.86

  9. District: Pathanamthitta Project District: Pathanamthitta Project Target ( Target (lakhs lakhs) ) Achievement (Financial) as on 31/03/2016 Achievement (Financial) as on 31/03/2016 23.2 22.18 Pulikeezhu 26.4 15.68 Mallappally 17.87 16.08 Koippuram

  10. District: Kollam Project District: Kollam Project Target ( Target (lakhs lakhs) ) Achievement (Financial) As on 31/03/2016 Achievement (Financial) As on 31/03/2016 29.6 13.27 18.71 18.32 26.56 5.77 15.72 2.61 Pathanapuram Vettikkavala Chittumala Anchal

  11. District: Thiruvananthapuram Project District: Thiruvananthapuram Project Target ( Target (lakhs lakhs) ) Achievement ( Financial) As on 31/03/2016 Achievement ( Financial) As on 31/03/2016 32.6 22.34 Chirayinkkezhu 36.55 14.74 Pothencode 26.04 13.97 Kilimanoor 17.19 7.23 Vamanapuram-II

  12. District: Pathanamthitta Project District: Pathanamthitta Project Financial Target as per AAP (Rs. In lakhs 447.7 319.00 363.00 256.3 Total Financial Target as per AAP (Rs. In lakhs) ) Expenditure incurred up to 31/03/2016 Expenditure incurred up to 31/03/2016 Expenditure on 04/2016 Expenditure on 04/2016 Ranni Pulikeezhu Mallappally Koippuram 108.71 52.36 0.00 0.72 161.79 0.13 0.03 0 0 0.16

  13. District: Kollam Project District: Kollam Project Financial Target as per AAP ( Rs. In 405.6 407.4 150.8 257.2 252.0 Financial Target as per AAP ( Rs. In lakhs Expenditure incurred up to 31/03/2016 40.19 32.62 13.18 12.62 Expenditure incurred up to 31/03/2016 Expenditure on 04/16 Expenditure on 04/16 lakhs) ) Ithikkara Pathanapuram Vettikkavala Chittumala Anchal 0.45 2.69 0 1.84 0 4.98 0 Total 98.61

  14. District: Thiruvananthapuram Project as per AAP (Rs. In 617.6 District: Thiruvananthapuram Project as per AAP (Rs. In lakhs Financial Target Financial Target Expenditure incurred up to 31/03/2016 82.54 Expenditure incurred up to 31/03/2016 Expenditure on 04/16 Expenditure on 04/16 lakhs) ) 9.69 Vamanapuram 448.8 15.73 0 Chirayinkkezhu 502.645 0 0 Pothencode 358.16 0 0 Kilimanoor 236.4 0 0 Vamanapuram-II Total 98.27 9.69

  15. Name of District Name of District Balance in 14/05/2016 Balance in A/c s on 14/05/2016 A/c s on Expenditure entered on 16 Expenditure entered on 16- -17 17 0 Pathanamthitta 5,515,236.09 Kollam 10,792,832.01 156,794.00 Thiruvananthapuram 1,717,859.31 190,879.00

  16. S No. Level Bank Balance Expenditure 1 2 3 4 KOIPURAM (Block) MALLAPPALLY (Block) PULIKEEZHU (Block) RANNI (Block) Total: 407,879.84 1,205,296.00 697,329.00 2,482,578.00 4,793,082.84 0.00 0.00 0.00 0.00 0.00

  17. S No. Level Bank Balance Expenditure 1 2 ANCHAL (Block) CHITTUMALA (Block) 50,028.00 397,845.50 0.00 156,794.00 3 4 ITHIKKARA (Block) PATHANAPURAM (Block) 2,672,057.00 1,039,195.00 0.00 0.00 5 VETTIKKAVALA (Block) 625,990.00 0.00 Total: 4,785,115.50 156,794.00

  18. S No. Level Bank Balance Expenditure 1 CHIRAYINKEEZHU (Block) KAZHAKUTTAM (Block) 121,875.50 0.00 2 328,914.50 44,262.00 3 4 KILIMANOOR (Block) VAMANAPURAM (Block) Total: 192,501.00 510,348.48 0.00 146,617.00 1,153,639.48 190,879.00

  19. MIS 2011-12 UC 2011-12 MIS 2012-13 UC 2012-13 MIS 2013-14 UC 2013-14 MIS 2014-15 UC 2014-15 District Name 0.1884 0.18013 5.5854 4.54895 91.3688 84.61571 162.1219 189.6672 Pathanamthitta 0.1311 0.1311 12.7516 12.7516 53.1432 52.24804 136.7814 137.6766 Kollam 11.23 0 8.52879 21.6337 113.133 117.1227 157.7425 159.2982 Trivandrum Pathanamthitta Updation to be done for the Financial year 2014-15 Trivandrum Updation to be done for the Financial Years 2013-14 & 2014-15

  20. Userid and password has been issued for Pathanamthitta Kollam Trivandrum Microwatershed wise data Base/DPR/Action plan has to be uploaded by Pathanamthitta Kollam Trivandrum

  21. No of Photos Sl No District Uploaded 1 Pathanamthitta 35 2 Kollam 44 3 60 Trivandrum

Related


More Related Content