Decision Brief on Declaring Operational Instructions for Satellite Products

spsrb decision brief on declaring a product n.w
1 / 14
Embed
Share

This decision brief template is used by NESDIS personnel to recommend new satellite products for operational declaration. It includes guidelines for presenting to the SPSRB and outlines the process for declaring products operational. The template also addresses scenarios where capabilities may not proceed to full operational status.

  • Decision Brief
  • Operational Instructions
  • Satellite Products
  • NESDIS
  • SPSRB

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB that a new satellite product be declared operational. A decision briefing should be given to the SPSRB 1 to 45 days prior to declaring a product/service operational. Slides are due on the last Friday of the month. The presentation will be at the SPSRB which meets on the 3rd Wednesday of every month. Send briefing to Priyanka.Roy@noaa.gov and cc: David.R.Donahue@noaa.gov and Eileen.Maturi@noaa.gov Occasionally, NOAA will stop a capability at a pre-operational phase. For example, a product from a research satellite may not go all the way to a full 24/7 operational phase. In such cases, this template will also be used to declare a new product is ready to be declared fully pre- operational (i.e., we have reached our end-state for this capability). Every new product that is ready for transition into operations will be briefed to the SPSRB. Routine modifications to an existing product that is handled through the NESDIS OSPO change management process does not have to be briefed to the SPSRB, unless directed by OSPO management or requested by the SPSRB. Updates or enhancements to existing satellite products do not have to be briefed to the SPSRB. The decision to declare these products as operational will be made by OSPO s SPSD Division Chief or his Representative. The template is a guide and may require tailoring. However, adherence to the briefing outline is recommended because it ensures the SPSRB is presented the information needed to make decisions. Guidance is contained in the notes page. You can access the notes page by selecting View and Notes Page from the main menu. Delete this slide before you send your brief to the SPSRB secretaries 1 V12 April 15, 2016

  2. SPSRB Decision Brief on Declaring title Operational Presenter: name and office Month day, year 2 V12 April 15, 2016

  3. Integrated Product Team (IPT) IPT Lead: IPT Backup Lead: NESDIS Team: STAR: OSPO: OSGS: NCEI: Others: User Team Lead: Others: Oversight Panel (OP) lead: Other OPs involved: 3 V12 April 15, 2016

  4. Requirement(s) Requirement(s) SPSRB requirement number, title and summary of requirement Date of Initial Technical Assessment and SPSRB decision Date of Proposal for Product Development and SPSRB decision Others User community Benefit to user NOAA Mission Goal supported: Mission priority: 4 V12 April 15, 2016

  5. Capabilities Assessment Current Operational Capabilities Requested Capabilities Proposed Operational Capabilities Satellite Source (s) Product Name Accuracy Latency Timeliness Coverage Resolution Other attributes 5 V12 April 15, 2016

  6. Proposed Product Deliverable Details Product Type and Number Fiscal Year (FY) Product Delivery/Tracking Name Environmental Observational Parameters Satellites Sensors N # E # R # T # O # Tailoring Options or Comments Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Formats: Coverage areas: Resolutions: Update cycle: Other: N=New E=Enhanced R=Replacement T=Tailored O=Other 6 V12 April 15, 2016

  7. Project Milestones and Key Tasks (New Product Example) Product Delivery/Tracking Name: xxxxxxx MMM YY (mmm yy): Development Phase Begins MMM YY: IPT Lead informed to begin product development MMM YY: Initial Archive Requirements identified MMM YY: Quality Monitoring Concept Defined MMM YY: Long-term Maintenance Concept Defined MMM YY: Preliminary Design Review MMM YY: Development processing system defined MMM YY: Initial Information Technology (IT) Security concept defined MMM YY: Test case processed MMM YY: Critical Design Review MMM YY: Code is prepared for implementation MMM YY: Software Code Review MMM YY: Final Archive requirements identified MMM YY: Operational and backup processing defined MMM YY (mmm yy): Pre-operational Phase Begins MMM YY: Operational and backup processing capabilities in place MMM YY: Final IT Security Concept Defined MMM YY: Pre-operational product output evaluated & tested MMM YY: Code transitions to operations; all documentation is complete MMM YY: Operational and backup capabilities reach ops status MMM YY: Brief SPSRB Oversight Panel(s) on product status MMM YY: Brief SPSRB capability is ready to go operational MMM YY (mmm yy): Operational Phase Begins MMM YY: SPSRB declares product operational SPSRB Secretaries/manager update the SPSRB product metrics web pages OSGS updates Satellite Products database 7 V12 April 15, 2016

  8. Data Flow Diagram GINI Ingest/Remap System NSOF SATEPS/NSOF Send mail GOES Ingest and NOAA Port Interface (GINI) Polar SDI AWIPS Composite Microwave Ingest System Raw GOES Satellite Data ADDE Pull SDI3_3/SDI3_4 SDI4_3/SDI4_4 NPORT3/NPORT4/ NPORT6 GP05/GP13 SATEPSDIST 4/SATEPSDITb4 AWIPS VSFTP Push AWIPS SFTP Pull AWIPS SFTP Push AWIPS SFTP Push AWIPS VSFTP Push NWS Test NCF AWIPS VSFTP Push McLean, VA Five DPI Products AWIPS SFTP Push Product Server NWS Fairmont, WV (For NOAAPORT Feed) ANCF SATEPSDIST 1 GP67/GP68 Fairmont, WV NWB Backup SBN BNCF Silver Spring, MD AWIPS SFTP Push AWIPS SFTP Push AWIPS VSFTP Push Send mail GOES Ingest and NOAAPort Interface (GINI) Low Cloud Base Blended TPW SDI Ingest System Raw GOES Satellite Data ADDE Pull GP75/GP78 SATEPSDIST4/SATEPSDISTb4 SDI5_1/SDI5_2 NPORT5 Data Flow Diagram Legend VSFTP Port 21 SATEPS Security at ESPC/NSOF Production Zone SSH Port 22 ADDE Port 112 Development Zone Distribution Zone (DMZ) External User Zone Private NSOF Network Staging Zone Send mail/SMTP Port 25 http Port 80 OSDPD/ESPC-GINI-ESDA31-0001-V1.2 Baseline Date: January 12, 2011 Arrow indicates direction of connection WWB Zone 8 V12 April 15, 2016

  9. Guidance Insert a few slides that clearly show the following Quality of the product Technical performance Strengths and weaknesses Peer reviews conducted Recommend appropriate Oversight Panel review performance prior to SPSRB briefing For new NPP products include a short quality assessment from the STAR cal/val lead. If you do not know the STAR person, contact Laurie Rokke User readiness and acceptance of product Has user received test products and validated their usefulness for your operations? Are you ready to begin integration activities in the next 45 days? If not, when? Has user received training on how to use the product? Delete this guidance slide when submitting your briefing 9 V12 April 15, 2016

  10. Plan of Operations Product Retirement Plan Define if we will pursue the retirement of a product as a result of implementing a new or enhanced product under this project Archive Plan Define need for archive, archive location and duration of archive Define deliverables to archive (e.g., software, documentation, etc.) Long Term Maintenance Plan Define STAR science maintenance plan and funding source Define OSPO maintenance plan and funding source Quality Monitoring Plan Define Quality Control (QC) tools to be used Define who will use the QC tools Describe how the QC tools will be used (e.g., what thresholds trigger action) Documentation/Metadata Plan Describe who will do documentation and metadata and what will be done 10 V12 April 15, 2016

  11. PATRON Application Name Short Name Status Support Level User Impact Notification Tier Approval Level Escalation Tier Application Type Description * Satellites Instrument * Channels System CIP * Items in green are needed to update SPEEDS 11 V12 April 15, 2016

  12. PATRON Product Name Short Name Application Short Name Status Support Level Format Primary Use Description Output Filenames * Projected date to go operational * Horizontal resolution * Vertical resolution * Frequency * Coverage * Accuracy * Product Oversight Panel * Users * Web page * Archive * Items in green are needed to update SPEEDS 12 V12 April 15, 2016

  13. SPSRB User Request Status Has the SPSRB user request been fully satisfied? 13 V12 April 15, 2016

  14. SPSRB Decision General comments User input STAR senior representative input OSPO senior representative input OSGS senior representative input Consensus decision reached? Yes: summarize decision No: summarize direction 14 V12 April 15, 2016