Detailed Design for Flood Mitigation Project in Kampung Batu 10, Selangor

rekabentuk terperinci bagi projek tebatan banjir n.w
1 / 7
Embed
Share

"Discover the detailed design project for flood mitigation in Kampung Batu 10, Hulu Langat, Selangor, initiated by the State Government of Selangor through Jabatan Pengairan dan Saliran Selangor. Learn about the objectives, background information, and the urgent necessity for upgrading the drainage system to combat frequent floods in the area."

  • Selangor
  • Kampung Batu 10
  • Flood Mitigation
  • Detailed Design
  • Selangor Government

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. REKABENTUK TERPERINCI BAGI PROJEK TEBATAN BANJIR DI KAMPUNG BATU 10, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN JABATAN PENGAIRAN DAN SALIRAN SELANGOR

  2. INTRODUCTION The State Government of Selangor (the Government) through its implementing agency, Jabatan Pengairan dan Saliran Selangor (JPS), requires engineering consultancy services to prepare a study and detailed design for preparation of tender for REKABENTUK TERPERINCI BAGI PROJEK TEBATAN BANJIR DI KAMPUNG BATU 10, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN The detailed design of the flood mitigation works up to and including the preparation of the final tender documents shall be completed within TEN (10) months from the date of commencement of Services.

  3. BACKGROUND The Langat River Basin is located in three districts, namely Hulu Langat, Sepang and Kuala Langat Districts. The length of this river is 149.3 km from upstream to the river mouth. The main focus of this project is in the upstream area where the river has a high and rapid flow rate.

  4. BACKGROUND There are other rivers that enter Sungai Langat such as Sungai Lui, Sungai Gahal in upstream and Sungai Sering, Sungai Raya, and Sungai Cheras in downstream. In Kampung Batu 10 itself, there are also several main drain that enter Sungai Langat, which are drain at Jalan Puyuh and Jalan Pipit. The rapid development in the upstream caused floods in several areas in Sungai Langat, Hulu Langat District such as Jalan Persekutuan Dusun Nanding, Kg. Sungai Gahal, Kg. Sungai Serai, Kg. Batu 10 and so on. The development and construction of highways (Elevated Klang Valley Expressway EKVE) and Logi Rawatan Air Langat Phase 2 in the upstream has also increased the flow of surface water and caused the risk of flooding with the frequency of floods in Kg Batu 10 approximately 5 times in a year.

  5. OBJECTIVE The objective of this consultancy service is to prepare detailed design and tender table documents for the purpose of implementing storm water management and flood mitigation project in flood prone areas along Sungai Langat at Kampung Batu 10, Daerah Hulu Langat.

  6. PROJECT OBJECTIVE a) Based on the rapid development, exploration of the area and increasing population density, the drainage system in the area/ Basin of Sungai Langat at Kampung Batu 10 needs to be upgraded to further reduce the problem of frequent floods. The implementation of flood mitigation will reduce the risk of loss of residents, traders, entrepreneurs, farmers, ranchers and public property. b) Study of pond needs at Jalan Puyuh Kg Batu 10. c) Study of river improvement works, slope stabilization/protection requirements and upgrading of bund d) Upgrading/ build outlets structure/ crossing along Sungai Langat e) Study of spillway/ flapgate needs/ requirements f) Study of pump system/ pump house/ gate requirements

  7. SEKIAN, TERIMA KASIH BAHAGIAN PENGURUSAN BANJIR JPS SELANGOR