Digital Capacity Management (DCM) Test Cases for TTR IT Implementation Pilot

Digital Capacity Management (DCM) Test Cases for TTR IT Implementation Pilot
Slide Note
Embed
Share

This project comprises a series of test cases aimed at validating the Digital Capacity Management (DCM) system for the TTR IT Implementation Pilot scheduled for September 2022. It involves creating, updating, and simulating processes within specified deadlines and parameters.

  • Capacity Management
  • Test Cases
  • IT Implementation
  • Pilot Support
  • Digital Solutions

Uploaded on Mar 03, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Digital Capacity Management (DCM) Test cases for the TTR IT Implementation Pilot supported by September, 2022 1

  2. Test case categories Create object Update object Change the status of the object Feasilibity Study Simulate process according to TTR deadline Path Modification Path Alteration 2

  3. Test case list (candidates) Create capacity model for a line manually Import capacity models for a line Create capacity model for the borderline Coordinate capacity models for the border crossing Create capacity model variants for the line Reference the CNA in the CM Reference more CNAs in the CM Searching for the CM per various parameters 3

  4. Test case list (candidates) Create catalogue path for freight train without offset on the route Create catalogue path for freight train with offset on the route Create catalogue path for passenger train without offset on the route Create catalogue path for passenger train with offset on the route Update train parameter (Train weight, train length, planned speed, container profile) of an existing catalogue path Update timetable of an existing catalogue path Shorten route of an existing catalogue path Extend the route of an existing catalogue path Update the calendar of an existing catalogue path Update the train type of an existing catalogue path Publish an existing catalogue path 4

  5. Test case list (candidates) Withdraw a published catalogue path Create path for freight train without offset on the route Create path for freight train with offset on the route Create path for passenger train without offset on the route Create path for passenger train with offset on the route Update train parameter (Train weight, train length, planned speed, container profile) of an existing path Update timetable of an existing path Shorten route of an existing path Extend route of an existing path Update calendar of an existing path Update train type of an existing path 5

  6. Test case list (candidates) Publish (=booked) an existing path Withdraw a published path Search for capacity products according different parameters Feasibility study with 1RA - 1IM Feasibility study with 2RA - 2IM Feasibility study with 1RA - 2IM Feasibility study with 2RA - 1IM 6

  7. Test case list (candidates) Path modification with 1RA - 1IM Path modification with 2RA - 2IM Path modification with 1RA - 2IM Path modification with 2RA - 1IM Path alteration with 1RA - 1IM Path alteration with 2RA - 2IM Path alteration with 1RA - 2IM Path alteration with 2RA - 1IM 7

  8. Feasibility Study test case (details) Create dossier (RA) Update dossier (RA): update existing sub-path, create new sub-path Start Feasibility Study (RA) Submit Feasibility Study Request (RA) Update dossier (IM): update existing sub-path, create new sub-path Release Feasibility Elaboration Conference (IM) Update dossier (RA, IM) Return to Feasibility Study Elaboration (IM) Submit Feasibility Study Result (IM) Acknowledge Feasibility Study Result (RA) 8

  9. Feasibility Study process (PCS EC) 9

Related


More Related Content