East Asia Hydrographic Commission Capacity Building

east asia hydrographic commission eahc capacity n.w
1 / 9
Embed
Share

"Explore the East Asia Hydrographic Commission's capacity building activities and reports from meetings in Surinam and Japan. Learn about training programs, technical visits, and collaborations with various member states. Stay updated on hydrography-related initiatives in the region for optimal development and disaster management."

  • East Asia
  • Hydrographic Commission
  • Capacity Building
  • Training Programs
  • Hydrography

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. East Asia Hydrographic Commission (EAHC) Capacity Building Summary Report Hak Yoel (Peter) YOU Republic of Korea EAHC Capacity Building Coordinator 15th Capacity Building Sub-Committee Meeting, Surinam, June 2017

  2. Contents I Introduction II Capacity Building Activities III Proposed 2017 CB Programmes IV Action Required of CBSC

  3. . Introduction China Brunei Vietnam China Thailand DPRK 10 Member States Thailand DPRK Chair: Malaysia Vice Chair: Japan Vietnam is waiting for the EAHC Membership approval Singapore Indonesia Singapore Indonesia ROK Japan Republic of Korea Japan Malaysia Philippines Malaysia

  4. . Introduction 6thTraining, Research and Development Center Board of Directors (TRDC BOD) Meeting, Japan, Feb. 2017 EAHC CB activities were reviewed and planned for 2018 Singapore serves as Chair, ROK serves as Vice Chair A SWOT analysis was re-conducted

  5. II . Capacity Building Activities EAHC CB Activities since CBSC14 IHO IHO- -funded CB activities funded CB activities s/n T Ti it tle le V Ve enu nue e Da Dat te e Status Status 1st Training for Trainers in Hydrography (TFT HYDRO) ROK (TRDC)24 Oct- 4 Nov Completed 1 2016 20 Dec 2016 5 Apr 2017 3 Jul-28 Jul 2017 Timor-Leste Completed 2 Technical Visit Cambodia Completed 3 Technical Visit ROK Category B Programme (3rd Phase) Hydrographic survey for disaster management and relief 2nd Training for Trainers-Basic Hydrography (TFT HYDRO) ROK (TRDC) Planned 4 Indonesia Aug 2017 Planned 5 ROK (TRDC) Nov 2017 Planned 6

  6. II . Capacity Building Activities Non IHO-funded CB activities s/n T Ti it tle le V Ve enu nue e Da Dat te e Status Status 1stEmergency Disaster Response Workshop 18 Oct 2016 1 Singapore Completed Capacity building programme on Ocean observation and Hydrographic Surveying ROK (TRDC)26 Sep - 14 Oct 2 Completed 2016 IC-ENC International ENC Validation training course 7 Nov - 18 Nov 2016 3 Malaysia Completed JICA Group Training Course for Hydrog raphic Survey (Hydrography for Charting and Disaster Management) 27 Jun - 16 Dec 2016 4 Japan Completed

  7. III . Proposed 2018 Capacity Building Programmes ROK activities Fund Required Fund Required ( )(Euro) ( )(Euro) Priority T Ti it tle le V Ve enu nue e Category B Hydrographic Surveyors Program ( S-5B (Hydro)) 1 ROK (TRDC) 110,100 EAHC activities Fund Required Fund Required ( )(Euro) ( )(Euro) Priority T Ti it tle le V Ve enu nue e Use of GNSS for Tide Correction for S urvey LiDAR and Satellite Derived Bathymetry Workshop Cartographic Production DB System Development Workshop 1 To be confirmed 23,040 2 To be confirmed 23,040 3 To be confirmed 23,040 Review of Basic Carto Workshop Technical Visit for Timor Leste Maritime Safety Information (MSI) Course 4 5 To be confirmed To be confirmed 23,040 7,800 6 To be confirmed 26,180

  8. IV . Action Required of CBSC The CBSC is invited to take note of this report. 8/9

  9. Thank you 9/9

Related


More Related Content