Explore the BALMAS Project aimed at enhancing the application of the BWM Convention for effective ballast water management. The project, funded by the IPA Adriatic program, focuses on analyzing ballast water traffic in the Adriatic region, introducing advanced technologies for water treatment, and ensuring compliance with project obligations through thorough reporting and data submission.

  • Ballast Water
  • Management Project
  • BWM Convention
  • Environmental Sustainability
  • Adriatic Region

Uploaded on | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Ballast Water Management 7. Listopada 2014. Maja Markov i Kostelac

  2. Status (30.09.2014.) 41 DR AVA SA 30,25% flote Uvjet za stupanje na snagu: 12 mjeseci nakon ratifikacije 30 dr ava sa 35% svjetske tona e

  3. BALMAS PROJEKT PODACI O PROJEKTU Priprema za u inkovitiju primjenu Konvencije o upravljanju i nadzoru balastnih voda i taloga, 2004. (BWM Convention) Projekt se realizira u okviru IPA Adriatic programa, vrijednosti 7.157.158,11 Voditelj projekta: Institut za vode Slovenije 17 projektnih partnera iz 6 dr ava Regije

  4. BALMAS PROJEKT nastavak Mare Nostrum FB 12, prora un 140.358,77 Predfinanciranje: 30% alociranih sredstava kao tro ak (oko 35.790 ) Svaki tro ak na projektu mora biti podrobno obja njen i dokumentacijski potkrijepljen Ostala sredstva se dobivaju retroaktivno nakon odra enih aktivnosti na projektu

  5. BALMAS PROJEKT nastavak Working Package 4: BW as vector of introduction of HAOP and BWM options, leader: Mare Nostrum (cca. 60 000eur) Aktivnosti WP4: analiza prometa u Jadranu i iskrcaja balastnih voda Reporting zajedni ka mjera Tehnologije obrade balastnih voda Prikupljanje i obrada taloga u lukama

  6. BALMAS PROJEKT nastavak Obveze (svih) projektnih partnera Sudjelovanje u implementaciji projekta Dostava relevantnih podataka u cilju uspje ne implementacije projekta Administrativno vo enje projekta Dostava kvartalnih izvje taja o realizaciji projekta na temelju kojih se odobravaju sredstva projekta

  7. BALMAS PROJEKT nastavak Za potrebe ispunjenja obveza Projekta, Mare Nostrum je do listopada 2014. godine uspje no prikupio i analizirao: BWM tehnologije; na in obrade i status odobrenja (prezentacija: Alfa Laval i Hyde Marine) BWM opcije za brodove Podatke CIMIS sustava

  8. BALMAS PROJEKT nastavak U suradnji sa PP8 (MPPI) napravljena je analiza AIS podataka Izradio upitnike: Upravljanje talozima balastnih tankova u lukama i remontnim brodogradili tima BWM opcije za brodove

  9. BALMAS PROJEKT nastavak Koristi: Razvoj znanja (besplatni seminari za lanice, kori tenje prikupljenih projekata, pilot projekt) Umre avanje, referenca, financijska korist Izazovi: Relativno neiskustvo u EU projektima, pogotovo u dijelu administriranja EU projekata Nedostatni administrativni kapacitet

  10. PODNESCI 9 INF dok o tipskom odobrenju (Type Approval)- G8 NORVE KA: Alfa Laval PureBallast 3.0 (filtracija+UV na usisu i UV na ispustu) Trojan Marinex BWT (filtracija+UV na usisu i UV na ispustu) JAPAN: Miura BWMS ( filtracija+UV na usisu i UV na ispustu) ECOMARINE ballast water management system ( filtracija+UV na usisu i UV na ispustu)

  11. TYPE APPROVAL NJEMA KA: Ecochlor Ballast Water Treatment System, Series 75 (G8 i G9) (ima Basic and Final App.)- filtracija+kloriranje Ocean Protection System OPS-250 (by MAHLE Industriefiltration) (filtracija + UV) BallastMaster ultraV 250" (by GEA Westfalia Separator Group)- filtracija+ UV CleanBallast 500-1 (by RWO GmbH Marine Water Technology, Veolia Water Solutions & Technologies) (G8 i G9) (filtracija+elektroliza+dezinfekcija (TRO)+ neutralizacija

  12. TYPE APPROVAL - nastavak- NJEMA KA Cathelco Ballast Water Management System A2 (by Cathelco Ltd.)- filtracija + UV (usis) i UV (ispust)

  13. BASIC and FINAL APPROVAL SINGAPORE (BASIC) Basic Approval of the ElysisGuard (KALF Engineering Pte. Ltd )(G9). Filtracija+ eleltrokem.+ neutralizacija KOREA (FINAL): MARINOMATE (by KT Marine Co.)- plankill pipe + elektroliza+ neutralizacija (G9) KURITA (Kurita Water Industries Ltd ) biocide- natrijev hipoklorid (G9) BlueZone BWM (by SUNBO Industries Co. )- ozon+ neutralizacija (G9) SVI FINALNI ODOBRENI OD GESAP WG

  14. KEMIKALIJE- NUSPRODUKT Doc 67/INF 17- LISTU KEMIKALIJA naj e e prona enih u tretiranim balastnim vodama

  15. SMJERNICE ZA STRIPPING (iskrcaj ostataka balasta) kori tenjem eductora 67/2/8, 67/2/10 Marshal Islands & indus.- izmjena nacrta Smjernica -pitanje reprezentativnosti uzorka - BW koja je tretirana i zadovoljava standard mo e koristenjem lokalne vode i kroz eductor ispustiti u okoli - Japan &etc.- protive se uzorkovanju u toj fazi EU- podr ati Marshall Islands KOMENAR?

  16. PSC SMJERNICE 67/2/7 i 67/2/13 PSC u 4 stupnja: 1. Inicijalni pregled 2. Detaljni pregled 3. Indikativno uzorkovanje 4. Detaljno uzorkovanje

  17. Inicijalni pregled Dokumentacija (BWC, BWMP, BWRB) Da li je sve uneseno u BWRB Vizualni pregled broda i opreme Da li je brod poduzeo korake da udovolji D-2 sukladno rez. A.1088(28) ? Zadu eni asnik i obu ena posada Izuze a- dokaz razloga

  18. Detaljni pregled Clear Ground PSC mo e obustaviti iskrcaj balasta Da li je sustav postavljen i radi u skladu sa planom Rukovanje ure ajima, sigurnosne upute Aktivne supstance skladi tenje i rukovanje More detailed inspection may result in sampling

  19. Uzorkovanje Indikativno i Detaljno Da li se na temelju indikativnog uzorkovanja mo e sankcionirati brod? Da li se za indikativni uzorak treba odrediti treshold ? Komentar? Undue dely of ship

  20. POSLJEDICE ZABRANA ISKRCAJA BALASTA (TEMELJEM UZORKOVANJA) Sankcije za neudovoljavanje standardima Konvencije: -upozorenje, zadr avanje, izgon

  21. ALTERNATIVNE MJERE Zadr avanje balasta na brodu Popravak BWMS Izmjena BW ako je mogu a i u skladu sa smjernicama Iskrcaj balasta u drugi brod ili prihvatni ure aj Dopustiti djelomi nu obradu

  22. IZUZEA 676/2/12 Danska i Interferry Primjena pravila A-3 i A-4 Risk assestment Short Sea Shipping Aktualno i za jadranski promet Komentar? Podr ati?

  23. PRIJEDLOZI INDUSTRIJE 67/2/6 Nepouzdanost Smjernica G8 (Guidelines for approval of BWMS); Ameri ke Smjenice za Type approval Kriteriji za uzorkovanje i analizu prilikom PSC i posljedice Ne penalizirati brodare koji su u dobroj vjeri instalirali odobrenu opremu Prijedlog rezolucije

  24. KANADSKI PRIJEDLOG Izmjena G8 Umjesto grandfather close uputa PSC da se manja odstupanja ne sankcioniraju (3 godine- faza uvo enja) Definirati manja odstupanja EU- da novi G8, ali bez posljedica za proizvo a e sustava odobrenih po postoje em G8 Povezati dijelove kanadske rezolucije sa PSC smjernicama? KOMENTAR?

  25. Pitanja? Komenari?