Efficient Implementation of SMED for Operational Excellence
Enhance your operational efficiency through the effective implementation of Single-Minute Exchange of Die (SMED) methodology. Learn key steps for quick changeovers and passenger transitions, as exemplified by Ryanair. Contact Pat Cullinane for expert advice on SMED benefits and integration. Galway Technology Centre offers a conducive environment for enhancing process efficiency. Delve into the details to streamline your operations and boost productivity.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Galway Technology Centre Mervue Business Park Wellpark Road, Galway Telephone: +353-91-870 708 Mobile: +353-87-2837810 Email: info@cordatus.ie Registered in Ireland: 347762 C:\Users\Jenny\Desktop\Cordatus\Cordatus Logo with www Jan09.jpg
SMED at Ryanair 2 C:\Users\Jenny\Desktop\Cordatus\Cordatus Logo with www Jan09.jpg
Ryanair results 2016 from 2015 43% 16% 1% 18% 5% 6% To 2016 Profit Revenue Average fare Passengers Load factor Cost per customer 1.24 billion 6.536 billion 46.67 106 million 93% 3 C:\Users\Jenny\Desktop\Cordatus\Cordatus Logo with www Jan09.jpg
Quick changeover key steps 1. The start: map the process steps 2. Identify external steps i.e. what can be done off-line in advance of machine stopping 3. Eliminate un-necessary Steps 4. Shorten the remaining activities. Aim for < 9 min changever 4 C:\Users\Jenny\Desktop\Cordatus\Cordatus Logo with www Jan09.jpg
Ryanair passenger changeover 1. The start: plane changeover process steps 2. In-flight plane clean out, magazine collection 3. No seat pockets. No seat back adjustment 4. Eliminate queuing for corridors at terminal. Embark/disembark form both ends of plane to tarmac. 5 C:\Users\Jenny\Desktop\Cordatus\Cordatus Logo with www Jan09.jpg
For more information on the benefits of SMED, and how to implement it effectively in your organisation, please contact: Pat Cullinane, B. Eng, Master Black Belt, University of Kentucky (Toyota) Certified Lean Manufacturing Expert pat @cordatus.ie 087-7727063 6 C:\Users\Jenny\Desktop\Cordatus\Cordatus Logo with www Jan09.jpg
Galway Technology Centre Mervue Business Park Wellpark Road, Galway Telephone: +353-91-870 708 Mobile: +353-87-2837810 Email: info@cordatus.ie Registered in Ireland: 347762 C:\Users\Jenny\Desktop\Cordatus\Cordatus Logo with www Jan09.jpg