EIM-S Informational Meeting

EIM-S Informational Meeting
Slide Note
Embed
Share

In this informational meeting on EIM-S, the Bonneville Power Administration discussed topics such as schedule meter data submission, neutrality, and uplift charge codes. Issues related to meter data submission and the consequences were also addressed.

  • Meeting
  • Power Administration
  • Schedule
  • Data Submission
  • Neutrality

Uploaded on Feb 20, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. EIM-S Informational Meeting 10.21.2022

  2. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Agenda Opening Remarks EIM-S Schedule Meter Data Submission AllocUIEQty and PD Future meetings will address Understanding Neutrality / Uplift Charge Codes Closing remarks 2

  3. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Opening Remarks

  4. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N EIM-S Schedule

  5. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N EIM-S Schedule BPA and PCI plan to publish EIM Detailed Data Files (DDFs) and EIM Services Bills for August in the coming days More schedule information planned for next customer informational meeting

  6. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Meter Data Submission What happens if BPA does not submit meter data?

  7. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Meter Data Submission Meter data is submitted at T+7B and T+52B BPA did not submit meter data on 6/2/2022 for T+7B Generating Resource CAISO substituted Expected Energy for meter data for Participating Resources and Non-Participating Resources Expected Energy is Base Schedule plus any Manual Dispatch VERs: Expected Energy is Base Schedule plus any adjustments due to forecast changes Result: There should be no charge/credit for Charge Code 64750 Uninstructed Imbalance Energy June RECALC will reflect actual meter data

  8. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Meter Data Submission BPA did not submit meter data on 6/2/2022 for T+7B Load BPA submits a single meter data value for Balancing Authority (BA) load CAISO substituted the ELAP schedule (EIM Load Aggregate Point)/base schedule for BA load For sub-allocations, load schedule is used in the place of meter data Result: There should be no charge/credit for Charge Code 64750 Uninstructed Imbalance Energy June RECALC will reflect actual meter data

  9. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N AllocUIEQty and PD Allocated Uninstructed Imbalance Energy Quantity and Persistent Deviation

  10. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N AllocUIEQty and PD Allocated Uninstructed Imbalance Energy Quantity Charge Code 64750 Uninstructed Imbalance Energy Generation (5 min column P) Load (hourly column E) Charge Code 20 Persistent Deviation Generation (hourly column D) Load (hourly column D) For load, column E fromXXXX_CustNam_LoadUIE64750 has the same values as column D from the Load PD file

  11. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N AllocUIEQty and PD Persistent Deviation compares After the Fact Schedule to the Imbalance Quantity Imbalance Quantity is Meter minus Schedule After the Fact Schedule is the hourly integrated final schedule value sourced from tags and/or CDE values* (takes into account Imports/Exports) Final schedule value is the final value, this may or may not equal the T-57 snapshot value *CDE values are for generation are used for load calculations for behind the meter situations

  12. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Questions? or Proposals for future agenda items?

  13. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Contacts for EIM Topic / Question Area Email and Phone Email (cc) EIM Services Bill (EESC) EESCSettlements@bpa.gov or 503-230-EIM1 Customer Billing gridmod@bpa.gov and Power or Transmission Account Executive Metering mdm@bpa.gov Customer Portal customerportal@bpa.gov Planned outages: bpaoutage@bpa.gov Unplanned: Contact BPA s Generation Dispatcher BPA Outage Office N/A After-hours Outage Contact BPA s Generation Dispatcher 13

  14. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Closing Remarks

Related


More Related Content