Electricity Supply Reliability Project Additional Financing

electricity supply reliability project additional n.w
1 / 7
Embed
Share

This project aims to enhance the reliability and capacity of power transmission networks by reconstructing substations in Armenia. The project involves the reconstruction of Vanadzor-1, Charentsavan-3, and Zovuni substations to improve power system operation efficiency and reduce operating costs. Key activities include repairing power transformers, overhauling control buildings, and installing SCADA systems. The completion of works is scheduled between 2021 and 2023.

  • Electricity Supply
  • Power Transmission
  • Substations Reconstruction
  • Infrastructure Development
  • Energy Efficiency

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Electricity Supply Reliability Project - Additional financing LoanProject Reconstruction of Vanadzor-1 , Charentsavan-3 Zovuni substations

  2. Project main data Financing Organization International Bank of Reconstruction and Development (IBRD) Consulting organization decon international GmbH and JV Consulectra Unternehmensberatung GmbH, Aram Karapetyan IE Contractors Kaskad Energo LLC, Xian Electric Engineering Co. Ltd, Efacec Engenharia e Sistemas S.A., China National Electric Engineering Co Ltd http://www.hven.am/

  3. Project Objective Increase the reliability and capacity of power transmission network, as well as power system operation efficiency, reduce substation operating costs In order to achieve the goals set by the Electricity Supply Reliability Project Additional Financing Project, reconstruct "Charentsavan-3 , "Vanadzor-1" and Zovuni substations. As a result of substation reconstruction, it is expected to minimize the number of emergency outages due to equipment failure, reduce operating costs In order to improve facilities maintenance purchase specialized machinery and vehicles http://www.hven.am/

  4. Reconstruction110/10/6 kV Vanadzor-1" substation Was built in 1933, located 37 km from Yerevan. Occupies an area of 3,6 hectares Contract price 4,083,875,43 USD dollar Scheduled works Reconstruction of 110kV OSY Repairment of two power transformers Replacement of 6 kV CSG Overhaul of the Control building and replacement of equipment Installation of SCADA system http://www.hven.am/

  5. Reconstruction of 110/10kV Charentsavan-3" substation Was built in 1985 located 37km from Yerevan Occupies an area of 4,4 hectares Contract price: 2,521,639 29 USDdollars, 2,946,265 35 euro, 658,639,773,45 AMD Scheduled works Replacementof110kVand6kVOSY Replacementoftwo110kVpowertransformers Replacementof110/10kVautotransformers Replacementof10kVCSGequipment ConstructionofnewControlbuildingandreplacementof equipment InstallationofSCADA system Completion of works is foreseen in 2023. http://www.hven.am/

  6. Reconstruction of 220/110/10 kV Zovuni" substation Was built in 1975, Located in Yerevan Occupies an area of about 3,2 hectares Contract price: 7,946,093,08 USD dollars Scheduled works Partial replacement of 220, 110, 6 kV OSY Reconstruction of 220/110/10 kV autotransformers Repairment of two power transformers Replacement of 6 kV CSG equipment Overhaul of Control building and replacement of equipment Installation of SCADA system Completion of works is foreseen in 2024. http://www.hven.am/

  7. Expected Outcome In the result of Project implementation Reliabilityandcapacityofpowertransmissionnetworkwillbeincreased Operationaleffectiveness of Energysystemwillbeincreased Operationalcostsofsubstationswillbereduced Emergency outages due to equipment failure will be reduced http://www.hven.am/