Electrification Plan for Ayeyarwady Region - Detailed Description
The Republic of the Union of Myanmar Ministry of Electric Power has outlined a comprehensive electrification plan for Ayeyarwady Region, aiming to increase electrified villages from 5.78% to 100%. The plan involves electrifying 719 villages near existing grid lines in the first phase, benefiting over 131,000 households. Detailed substation and power line expansion plans are also provided for effective implementation. Challenges related to the region's geographic features are acknowledged, with a focus on collaboration with local government and development departments to address such issues.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Ayeyarwady Region Office Priorities and Detailed Description of Electrification Plan For Ayeyarwady Region Dated -21.Oct.2015
As Per DE Idea after discussion with Local government The Ayeyarwady Division is Located in the delta Region of lower Myanmar. Although there are many village in the Ayeyarwady Division , the villages which hare been electrifed are only (5.78 %). So we are strongly eager to be (100%) electrified villages in Ayeyarwady Division as quickly as passible. There are ( 11908 ) villages in the Ayeyarwady Division. Among them ( 689 ) Villages have been Electrified from the national grid. I would like to implement (689) Villages have been electrified from the national grid. I would like to Implement (719) villages which are located within 2 miles of existing electricity gird lines for the first phase electrification plan. This plan with be elective for ( 131925 ) households.And than, the remainder of village will be implement continuosly accroding to over National Electrification plan. Our MOEP also consents to this priority electrification project. During implementation of National Electrification plan , We are faced with same difficulties as there are so mony rivers, Streams,lakes and mountain ranges in the Ayeyarwady Division. In some places we can face with a little difficutly . The transportation and construction will be normlly easy it will not take time, So it can be implemented in short time. Our MOEP, DRD and consultants with foreign and local experts have to negotiate, coordinate and cooperate especially with local Government , Rural Development Depertment and other respective organizations to over come some perspective issues and challenges. 2
The additional electrification statement due to newly and upgrading 66/33/11kV substation and related power line for Ayeyarwady Region The effective area (within 2 Miles) Total Househol d (Nos) To Be Constructed Estimated Cost (millon kyats) Sr No Total Populatio n (Nos) Township 66kV Line (mile) 33kV Line (mile) Total Vill(ages (Nos) Installatio n cost Material cost Total cost Substation 66/11kV, 5MVA (NEW) 66/11 kV, 5 MVA(NEW) 1 Pathein 1 - 31 3646 16049 1590.58 177.01 1767.59 Kangyidoun t 3 TharBound33/11 kV, 5 2 0.2 18 2129 7400 1526.49 168.16 1694.65 - 10 14 1667 6846 1005.65 164.63 1170.28 MVA(NEW) 4 Kyonepyaw33/11 kV, 5 - 1 8 1789 5367 640.32 111.61 751.93 MVA(NEW) 33/11 kV, 5 MVA(NEW) Upgrade 33/11kV 5 MVA To 10 MVA Upgrade 33/11kV 2MVA To 5 MVA Upgrade 33/11kV 5MVA To 10 MVA Maubin (YaLae) 5 - 9 39 4191 17880 964.95 157.85 1122.8 6 Maubin* - 703.525 14.7 718.23 7 Dedaye - 4 608 2493 599.73 105.83 705.56 8 Danaphyu - 51 4389 19617 698.63 127.47 826.10 9 Nyaung TonUpgrade 33/11kV 5MVA To 10 MVA - 33 4380 16576 698.63 127.47 826.10 Total 1.2 20 198 22799 92228 8428.505 1154.73 9583.24 REMARK * For Maubin 33/11 kV , 10 MVA Substation , Only Installation & Service Charges are needed 3
Detailed Electrification Plan for Ayeyarwady Region (Within 2 miles from Existing 11 kV Distribution Line) Task by regional To be constructed Name of village To be Electrifi - ed Estima tedcost (Mil Kyates) cost for 11 kV line 11/0.4 Transformer Hous e hold Popu lation 400 V Lines (Mile s) Estima tedCos t (Mil Kyates) N o Town ship No of House Cons t ructi on Cost Const ructio n Cost Trans Port Cost Trans Port Cost mileMateri- al Cost Total KVA NoMateri Total al Cost 214002175 87936194. 4628.6 290.78 793.89 5713.21940 1892270.4 68.88158. 2512.1 4 2894.14876.4 8214.1 2 150.56492.3 1 Pathein 219 0 2 0 4 2 88 2Hinthat a 3Ma U Bin 370233849 14819 7 60381110. 474. 5 11344. 2 2642.3 6 1943 140773364 3772524.7 187. 2 108. 8 361.29403.4 234 708 88.9 8 0 1 74 1 144081441 165.79 456.19 326.111539 1351625.4 1783.3 8 5044.7 6 117.15251.9 135 49.4 6 8 0 8 18 77.6 211.97 1525.8 4200 38462.41 13.53 28.8 513.832039.0 56.32527.2 4 Pyapon 36 6257 6458 21986 51.7 1235.6 8 2 5 5Myaun g Mya 9129 9420 40937 57.71378.4 914.93 7 2636.8 66.852280.8 60 86 236.08 1721.9 8220 65 838.23 24.7 52 3 7 32.31278.6 6 Laputta 35 6675 5822 24749 28.6 683.5 42.9 117.3 843.7 3480 35 400.2 13.9 28.7 442.9 1287 9 948929636 38418 6 917. 5 21912. 69 1371.0 7 3758.4 3 24207. 7 8473 0 8398121.4 259.3 1 563. 7 9061.2 9 24098. 17 784.2 5 27234. 5 Total 719 4 8 4
Electrification Plan for Villages of Ayeyarwady Region (Within 2 miles from Existing 11 kV Distribution Line) To be Constructed 11 kV Distribution Line 917.5 miles 400 V Distribution Line 784.25 miles 11/0.4 kV Distribution Transformer 839 Nos No. of Villages - 719 Nos No. of house hold - 96364 Pathein District No. of Villages - 219 Nos Household - 21750 Estimated Cost - 8214.12 (mil kyats) Myaung Mya District No. of Villages - 60 Nos Household - 9420 Estimated Cost - 2636.8 (mil kyats) Laputta District No. of Villages - 35Nos Household - 5822 Estimated Cost - 1289 (mil kyats) Hinthata District No. of Villages - 234 Nos Household - 38498 Estimated Cost - 4876.47 (mil kyats) Maubin District No. of Villages - 135 Nos Household - 14416 Estimated Cost - 5044.7 (mil kyats) Pyar Pon District No. of Villages - 36 Nos Household - 6458 Estimated Cost - 2039.02 (mil kyats) 5
Detailed Electrification Plan for Pathein District (Within 2 miles from Existing 11 kV Distribution Line) Task by regional Estima To be constructed Name of village To be Electrifi - ed Estima Ted cost (Mil Kyates ) cost for 11 kV line 11/0.4 Transformer Popu latio n No of Hous e Hous e hold 400 V Lines (Mile s) - N oTownship tedCos t (Mil Kyates ) Const ructio n Cost Tran s Port Cost Const ructio n Cost Mater ial Cost Trans Port Cost Mater ial Cost Total mile Total KVA No 1068. 2 693.4 4 413.1 1 4000 36456.36 498.271566.4 1 Pathein 31 3646 3646 16049 36 865.47 54.3 148.4 13 29 38 1711.17 9 6 1950 18211.80 232.51925.94 2 Kan Gyi Dout 18 2051 2129 7400 24 561.84 35.25 96.35 6.3 14 16 695.78 9 7 101 0 175.58589.84 1667 1687 6846 14 334.71 21 57.4 15 158.23 5.4 12 21 699.46 3 Thapaung 14 8 4 Nga Pu Taw 5 436 436 1719 9.5 227.05 14.3 38.95 280.3 500 5 56.765 1.9 4 62.67 342.92 3.1 139.16 817.3 7 3530 52575.58 636.731454.1 5 Ye Kyi 91 4462 4462 19205 28 662.25 41.55 113.6 20 42 4.7 210.978 4 1 6Ngathaing Chaung 8 1592 1676 8076 10.5 251 15.75 43.05 309.8 1100 10 100.3 3.04 6.4 109.7 419.6 8.25 370.33 1048 1091 4133 7.4 177.42 11.13 30.43218.9 6.4 132.30351.28 950 8 123.10 2.8 9.5 426.45 7 Athoke 8 7 3 236.0 6 76.26312.32 498 540 2318 8 191.26 12 32.8 680 5 70.508 1.8 4 5 224.45 8 Kyaunggon 5 2 45.1 324.5135 1789 1789 5367 11 262.9 16.5 8 113.48 3.04 6.4 122.92 447.42 14.4 644.16 9 Kyone Pyaw 8 0 6 113.6 817.2 2400 17218.596.46 10A Htaung 17 2335 2418 9211 27.7 662.03 41.6 13.6 254.04 1058.8 17 764.46
Electrification Plan for Villages of Pathein District (Within 2 miles from Existing 11 kV Distribution Line) To be Constructed 11 kV Distribution Line 194.2 miles 400 V Distribution Line 150.5miles 11/0.4 kV Distribution Transformer 189 Nos No. of village - 219 Nos No. of house hold 21750 Ahtoung Nga Thaing Chaung No. of Villages - 8Nos Household - 1676 Estimated Cost - 419.6 (mil kyats) Yekyi District No. of Villages - 91 Nos Household - 4462 Estimated Cost - 1454.11 (mil kyats)0 No. of Villages - 17 Nos Household - 2418 Estimated Cost - 1058.8 (mil kyats) No. of Villages - 8 Nos Household - 1789 Estimated Cost - 447.42 (mil kyats) Township No. of Villages - 18 Nos Household - 2129 Estimated Cost - 925.947 (mil kyats) Household - 540 Estimated Cost - 312.322 (mil kyats) Thar Bound Township No. of Villages - 14 Nos Household - 1687 Estimated Cost - 589.8 (mil kyats) Nga Yote Kount Township No. of Villages - 8 Nos Household - 828 Estimated Cost - 351.1 (mil kyats) No. of Villages - 6 Nos Household - 1048 Estimated Cost - 394.308 (mil kyats) Kyone Pyaw Township Kan Gye Dount Kyaung Kone Township No. of Villages - 5 Nos Pathein District No. of Villages - 31 Nos Household - 3646 Estimated Cost - 1566.46 (mil kyats) Hing Kyi Kyun District Nga Pu Taw District No. of Villages - 5 Nos Household - 463 Estimated Cost - 342.92 (mil kyats) 7
Detailed Electrification Plan for Hinthata District (Within 2 miles from Existing 11 kV Distribution Line) Task by regional To be constructed Estim a ted cost (Mil Kyates ) Name of village To be Electrifie d Estim a Ted Cost (Mil Kyates ) cost for 11 kV line 11/0.4 Transformer Hous e hold 400 V Lines (Mile s) Popu lation N o Town ship No of House Const ruc tion Cost Const ructio n Cost Mate rial Cost Trans Port Cost Trans Port Cost Total KVA NoMateri Total mile al Cost 12327 12327 48479 1663968. 249 680.8 48981023 1211315.9 1458. 8 69.983 1064758.2 1 Hinthata 121 45.98 96.8 4 0 9 3 2Kyan Khin 198789.56 14.1481.09 17 1058 1058 3901 19 454.1 28.5 77.9 646 1200 17 178 6.46 13.6 1 2 3Myaung Aung 4821570.3 54.21849.3 34 3452 4351 15880 37 884.3 55.5 151.7 1088 4760 34 442 12.92 27.2 4 0 18644 18769 71298 2315509. 346 945.2 68011589 508.8 3 1556.1 1701556.0 4 Ingupu 41 184 460.45 15.58 32.8 9 0 8 105.0 5 5 Zalun 9 683 1104 4929 6.5 169 6.5 26 201.5 650 9 1 3.42 7.2 306.55 4.5 201.96 6LayMyat Nar 15 358.5 22.5 61.5 442.5 910 12127.27 141.4 4 583.94 12.4556.74 4.56 12 859 889 3710 9.6 7 8 37023 3849814819 474. 5 11344 .2 1943 140773364 3772524.7 2894. 1 4876.4 74 361.29403.4 Total 234 708 88.9 187.2 7 0 17 1 8
Detailed Electrification Plan for Ma U Bin District (Within 2 miles from Existing 11 kV Distribution Line) Task by regional Estima tedCos To be constructed Estima tedcos t (Mil Kyates) Name of village To be Electrifie d Hous e hold Popu latio n cost for 11 kV line 11/0.4 Transformer No of Hous e N o Town ship 400 V Lines (Mile s) Const ruc tion Cost Tran s Port Cost Const ructio n Cost t Mate rial Cost Trans Port Cost Mate rial Cost mil e Total (Mil Kyates ) Total KVA No 1788 0 1144 71.78 196.21411. 4330 39462.73 507.5 9 1 Ma U Bin 39 4191 4191 48 14 31 1919.54 24 1095.29 9 5 1657 6 461.4 2 28.95 79.13569.5 5030 33443.33 481.2 8 2 Nyaung Ton 33 4380 4380 19 12 26 1050.79 41 1858.4 0 2 1961 7 3 Danu Phyu 51 4389 4389 31.8 760.8 47.73 130.5 938.9 4280 51 559.3 17.9 40.8 617.9 1557 39.1 1755.16 276.1 4 17.33 47.36340.8 176.6 2 4 Pan Ta Naw 12 1448 1456 6308 12 1750 12 160.12 5.5 11 517.437 13 579.068 1 14408 144166038 110. 8 2642. 36 165.7 9 453.193261. 1539 0 13 5 1625.4 8 1783. 38 5044.76 117.15251.91 Total 135 49.4 108.8 1 1 8 10
Electrification Plan for Villages of Ma U Bin District (Within 2 miles from Existing 11 kV Distribution Line) To be Constructed 11 kV Distribution Line 110.8 miles 400 V Distribution Line 117.1miles 11/0.4 kV Distribution Transformer 135 Nos No.of village -135 Nos No.of house hold - 14416 Dya Nu Phyu Township No. of Villages - 51 Nos Household - 4389 Estimated Cost - 1557 (mil kyats) Pan Ta Naw Township No. of Villages - 12 Nos Household - 1456 Estimated Cost - 517.43 (mil kyats) Nyaung Ton Township No. of Villages - 33 Nos Household - 4380 Estimated Cost - 1050.79 (mil kyats) Me U Bin District No. of Villages - 39 Nos Household - 4191 Estimated Cost - 1919.54 (mil kyats) 11
Detailed Electrification Plan for Pyapon District (Within 2 miles from Existing 11 kV Distribution Line) Task by regional 400 V Lines (Mile s) To be constructed Estima ted cost (Mil Kyate) Name of village To be Electrifie d Hous e hold No of Hous e Popu lation cost for 11 kV line 11/0.4 Transformer Tran Estima tedCos t (Mil Kyates) N o Town ship Const ruc tion Cost Const ructio n Cost Mate rial Cost Trans Port Cost Mate rial Cost mil e s Total Total KVA No Port Cost 38.09 4 170.57 8 920 979 3448 3 71.7 4.5 12.3 88.5 400 3 1.14 2.4 51.5 3.8 1 Pyapon 3 140 9.5 227.05 14.25 38.95280.2 2 Kyaiklatt 7 1190 1249 3102 700 8 80.406 2.51 5.6 87.731 367.981 8 359.11 5 2493 4.2100.3 57.51 7 62.23 7 312.36 1 269.33 4 525 608 6.3 17.22 123.9 700 4 1.52 3.2 186.14 6 3 Dedaye 4 8 836.5 52.5 143.5 1033 2400 23286.40 4 Bokalay 22 3622 3622 12943 35 8.36 17.6 1344.9 38.5 1728.23 1 6458 21986 51.71235.6 77.55 211.971525. 4200 38462.41 513.82 9 Total 36 6257 13.53 28.8 2039.02 56.3 2527.25 3 7 8 12
Electrification Plan for Villages of Pyapon District (Within 2 miles from Existing 11 kV Distribution Line) To be Constructed 11 kV Distribution Line 51.7 miles 400 V Distribution Line 56.3 miles 11/0.4 kV Distribution Transformer 41 Nos No. ot village 36 Nos No.of house hold - 6458 Kyiaklatt Township No. of Villages - 7 Nos Household - 1249 Estimated Cost - 384.12 (mil kyats) Dadaye Bogalay District No. of Villages - 23 Nos Household - 3622 Estimated Cost - 1344.9 (mil kyats) No. of Villages - 4 Nos Household - 608 Estimated Cost - 86.14 (mil kyats) Pyapon Township No. of Villages - 3 Nos Household - 979 Estimated Cost - 140 (mil kyats) 13
Detailed Electrification Plan for Myaung Mya District (Within 2 miles from Existing 11 kV Distribution Line) Task by regional Estima tedCos To be constructed Estima tedcos t (Mil Kyates) Name of village To be Electrifie d Hous e hold Popu latio n cost for 11 kV line 11/0.4 Transformer No of Hous e 400 V Lines (Mile s) N o Town ship Const ructio n Cost Tran s Port Cost Const ructio n Cost t Mate rial Cost Trans Port Cost Mate rial Cost mil e Total (Mil Kyates ) Total KVA No 1270 4 23.4559.8 34.6 95.65 690.1 2610 21258.9 283.7 1 149.5 4 176.8 4 304.8 5 1 Myaung Mya 21 3020 3152 7.98 16.8 973.81 25.4 866.64 5 3 1690 1728 7102 5.75137.4 8.63 23.58 169.6 900 10137.7 3.8 8 319.17 9 307.08 2 Wakema 6 3 4 1841 19621001 7.1169.6 10.7 29.11 209.5 1670 12162.6 4.56 9.6 386.29 12.5 426.5 3 Kyonmange 11 5 9 8 1111 6 21.4511.4 32.1 87.74 652.7 3040 22278.8 4 Ei Me 22 2578 2578 8.36 17.6 957.55 20 680.65 6 9 4093 7 57.71378. 86 236.081721. 8220 65838.2 914.9 37 Total 60 9129 9420 24.7 52 2636.8 66.85 2280.87 43 9 37 14
Electrification Plan for Villages of Myaung Mya District (Within 2 miles from Existing 11 kV Distribution Line) To be Constructed 11 kV Distribution Line 57.7 miles 400 V Distribution Line 66.85 miles 11/0.4 kV Distribution Transformer 65 Nos No.of village 36 Nos No.of house hold - 9420 Myaung Mya Township No. of Villages - 21 Nos Household - 3152 Estimated Cost - 973.81 (mil kyats) Ei Me Town ship No. of Villages - 22 Nos Household - 2578 Estimated Cost - 957.55 (mil kyats) Wakema Township No. of Villages - 6 Nos Household - 1728 Estimated Cost - 319.17 (mil kyats) Kyone ma nge Township No. of Villages - 11 Nos Household - 1962 Estimated Cost - 386.29 (mil kyats) 15
Detailed Electrification Plan for Laputta District (Within 2 miles from Existing 11 kV Distribution Line) Task by regional Estima tedCos To be constructed Name of village To be Electrif- ied Estima tedcos t (Mil Kyates) Hous e hold Popu latio n No of Hous e cost for 11 kV line Mate - rial Cost 11/0.4 Transformer Tran N o 400 V Lines (Mile s) Township Const ructio n Cost Const ructio n Cost Trans Port Cost Mate rial Cost t mil e s Total KVA No Total (Mil Kyates) Port Cost 4667 37581520 14.1 337 21.15 57.81 416 2070 18 216.2 7.46 15.1 238.8 654.7 16.4 736.18 1 Laputta 18 7 542.50 8 2MawLamying gung 2008 2064 9542 14.5 346.6 21.75 59.45 427.8 1410 17 184 6.46 13.6 204.1 631.9 15.9 17 6675 58222474 1278.6 9 28.6 683.5 42.9 117.3 843.7 3480 35 400.2 13.9 28.7 442.9 1287 32.3 Total 35 9 16
Electrification Plan for Villages of Laputta District (Within 2 miles from Existing 11 kV Distribution Line) To be Constructed 11 kV Distribution Line 28.6 miles 400 V Distribution Line 32.3miles 11/0.4 kV Distribution Transformer 35 Nos No.of village 35 Nos N0.of hhould hold- 5822 Laputta Township No. of Villages - 18 Nos Household - 3758 Estimated Cost - 654.7 (mil kyats) Mawlamyaing KyunTownship No. of Villages - 17 Nos Household - 2064 Estimated Cost - 631.9 (mil kyats) 17
The Statement of Fiscal Yearly Budget and Electrified Connection for Ayeyarwady Region Ayeyarwaddy Region Capital Budget for DRD (mil kyats) Electrified Connection Ayeyarwaddy Region Capital Budget for ESE(mil kyats) ON Grid Off Grid Fiscal Year Total Cost for 11 kV Line & 11/0.4 kV Tr; No Total Cost for 400 V line Consume r (Nos) Villag e (Nos) Village (Nos) Consumer (Nos) Total Off Grid 1 2014-2015 Estimate (BE+RE) 607.634 257.03 864.67 6043.36 63 6500 196 32702 2 2015-2016 Estimate (BE+RE) 413.134 197.877 611.02 3054.15 125 13100 212 15425 32016-2017 Budget Estimate (BE) 1939 519 2458 - 725 96364 - - 3933.6 9 Total 2959.77 973.91 9097.51 913 115964 408 48127 18
Main Materials List Transported to Pathein District Office Sr No Description Quantities Transported Site 11/0.4 kV Distribution Transformer 1 182 Nos Pathein sub-ststion 1,2 2. 10 meter Concrete Pole 8504 Nos Pathein sub-ststion 1,2 ACSR 95mm2 3. 712.5 Ton Pathein sub-ststion 1,2 4. 11kV Disc Insulators 6660 Set Pathein sub-ststion 1,2 4. 11kV Pin Insulators 24420 Set Pathein sub-ststion 1,2 Surge arresters, Disconnectors, Fuses 5. 212 Set Pathein sub-ststion 1,2 6. Other Material 1 Lot Pathein sub-ststion 1,2 19
Main Materials List Transported to Hinthada District Office Sr No Description Quantities Transported Site 11/0.4 kV Distribution Transformer Hinthada sub-station & Myaung Aung Gas Tarbine Hinthada sub-station & Myaung Aung Gas Tarbine Hinthada sub-station & Myaung Aung Gas Tarbine Hinthada sub-station & Myaung Aung Gas Tarbine Hinthada sub-station & Myaung Aung Gas Tarbine Hinthada sub-station & Myaung Aung Gas Tarbine Hinthada sub-station & Myaung Aung Gas Tarbine 1 377 Nos 2. 10 meter Concrete Pole 21654 Nos ACSR 95mm2 3. 1187.5 Ton 4. 11kV Disc Insulators 17100 Set 4. 11kV Pin Insulators 62700 Set Surge arresters, Disconnectors, Fuses 5. 407 Set 6. Other Material 1 Lot 20
Main Materials List Transported to Ma U Bin District Office Sr No Description Quantities Transported Site 11/0.4 kV Distribution Transformer 1 135 Nos Ma U Bin District ,PMO Office 2. 10 meter Concrete Pole 5154 Nos Ma U Bin District ,PMO Office ACSR 95mm2 3. 275 Ton Ma U Bin District ,PMO Office 4. 11kV Disc Insulators 3960 Set Ma U Bin District ,PMO Office 4. 11kV Pin Insulators 14652 Set Ma U Bin District ,PMO Office Surge arresters, Disconnectors, Fuses 5. 165 Set Ma U Bin District ,PMO Office 6. Other Material 1 Lot Ma U Bin District ,PMO Office 21
Main Materials List Transported to Pyapon District Office Sr No Description Quantities Transported Site 11/0.4 kV Distribution Transformer Pyapon sub-station & Kyaiklatt sub- station Pyapon sub-station & Kyaiklatt sub- station Pyapon sub-station & Kyaiklatt sub- station Pyapon sub-station & Kyaiklatt sub- station Pyapon sub-station & Kyaiklatt sub- station Pyapon sub-station & Kyaiklatt sub- station Pyapon sub-station & Kyaiklatt sub- station 1 41 Nos 2. 10 meter Concrete Pole 2370 Nos ACSR 95mm2 3. 130 Ton 4. 11kV Disc Insulators 1872 Set 4. 11kV Pin Insulators 6864 Set Surge arresters, Disconnectors, Fuses 5. 71 Set 6. Other Material 1 Lot 22
Main Materials List Transported to Myaung Mya Office Sr No Description Quantities Transported Site 11/0.4 kV Distribution Transformer 1 65 Nos Myaung Mya sub-station 2. 10 meter Concrete Pole 2682 Nos Myaung Mya sub-station ACSR 95mm2 3. 145 Ton Myaung Mya sub-station 4. 11kV Disc Insulators 2088 Set Myaung Mya sub-station 4. 11kV Pin Insulators 7656 Set Myaung Mya sub-station Surge arresters, Disconnectors, Fuses 5. 85 Set Myaung Mya sub-station 6. Other Material 1 Lot Myaung Mya sub-station 23
Main Materials List Transported to Laputta District Office Sr No Description Quantities Transported Site 11/0.4 kV Distribution Transformer 1 35 Nos Laputta sub-station 2. 10 meter Concrete Pole 1346 Nos Laputta sub-station ACSR 95mm2 3. 72.5 Nos Laputta sub-station 4. 11kV Disc Insulators 1044 Set Laputta sub-station 4. 11kV Pin Insulators 3828 Set Laputta sub-station Surge arresters, Disconnectors, Fuses 5. 45 Set Laputta sub-station 6. Other Material 1 Lot Laputta sub-station 24