Energy Storage Resource Base Point Deviation Charges Overview

ktc 7 base point deviation charges for energy n.w
1 / 8
Embed
Share

Explore the concept of base point deviation charges for energy storage resources, including examples of over and under performance scenarios with settlement intervals and calculations for deviation amounts. Learn about creating new settlement models and optimizing response to grid requests.

  • Energy
  • Storage
  • Resource
  • Deviation
  • Charges

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. KTC-7: Base Point Deviation Charges for Energy Storage Resources- Single Model Examples Magie Shanks ERCOT BESTF Meeting 11/15/2019

  2. Overview Create a new Base Point Deviation (BPD) Settlement for the Single Model Energy Storage Resource (ESR). Over performance Providing a greater response than ERCOT has requested Over Generation or Under Consumption Under performance- Providing a lesser response than ERCOT has requested Under Generation or Over Consumption Deviation tolerance set to 3MW or 3% 2 PUBLIC

  3. Over & Under Performance Analysis Scenarios 80.00 60.00 OVER 40.00 20.00 MW UNDER 0.00 0 1 2 3 4 OVER -20.00 UNDER -40.00 -60.00 Settlement Intervals AABP Gen/Cons 3 PUBLIC

  4. Example Over Performance Energy Storage Resource (Over Generation) Energy Storage Resource (Under Consumption) AABP (BP + RegUp) = (30+6) 36MW AABP (BP - RegDn) = (-12 - 2) -14MW TGC (Telemetered Gen or Cons) 60MW TGC (Telemetered Gen or Cons) -4MW Tolerance: Max(MW, %): Tolerance: Max(MW, %): MW Limit (AABP + 3MW) 39MW MW Limit (AABP + 3MW) -11MW % Limit (AABP + Abs(AABP * .03)) 37.08MW % Limit (AABP + Abs(AABP * .03)) -13.8MW 21MW or 5.25MWh 7MW or 1.75MWh Deviation (TGC - Tolerance) Deviation (TGC - Tolerance) RTSPP $20/MWh RTSPP $20/MWh BPDAMT (RTSPP * Deviation) $105 BPDAMT (RTSPP * Deviation) $35 AABP = Adjusted Aggregated Base Point RTSPP = Real-Time Settlement Point Price BPDAMT = Base Point Deviation Amount 4 PUBLIC

  5. Example Under Performance Energy Storage Resource (Under Generation) Energy Storage Resource (Over Consumption) AABP (BP + RegUp) = (15+3) 18MW AABP (BP - RegDn) = (-19 - 1) -20MW TGC (Telemetered Gen or Cons) 6MW TGC (Telemetered Gen or Cons) -36MW Tolerance: Min(MW, %): Tolerance: Min(MW, %): MW Limit (AABP - 3MW) 15MW MW Limit (AABP - 3MW) -23MW % Limit (AABP - Abs(AABP * .03)) 17.46MW % Limit (AABP - Abs(AABP * .03)) -20.6MW 9MW or 2.25MWh 13MW or 3.25MWh Deviation (Tolerance-TGC) Deviation (Tolerance-TGC) RTSPP $20/MWh RTSPP $20/MWh BPDAMT (RTSPP * Deviation) $45 BPDAMT (RTSPP * Deviation) $65 AABP = Adjusted Aggregated Base Point RTSPP = Real-Time Settlement Point Price BPDAMT = Base Point Deviation Amount 5 PUBLIC

  6. Questions? 6 PUBLIC

  7. Appendix BPD Settlement ESR BPD will mimic Generation Resource BPD Over Performance: BPDAMT = Max (PR1, RTSPP) * OPESR Where: OPESR = Max [0, (TGC * Max (AABP + Abs(AABP * 3%), AABP + 3MW))] AABP = Adjusted Aggregated Base Point RTSPP = Real-Time Settlement Point Price BPDAMT = Base Point Deviation Amount OPESR = Over Performance for ESR PR1 = $20/MWh; parameter defined in Protocols TGC = Telemetered Gen or Cons 7 PUBLIC

  8. Appendix BPD Settlement (cont.) Under Performance: BPDAMT = (-1) * Min (PR2, RTSPP) * UPESR Where: UPESR = Max [0, ( * Max (AABP - Abs(AABP * 3%), AABP - 3MW)- TGC)] AABP = Adjusted Aggregated Base Point RTSPP = Real-Time Settlement Point Price BPDAMT = Base Point Deviation Amount UPESR = Under Performance for ESR PR2 = -$20/MWh; parameter defined in Protocols TGC = Telemetered Gen or Cons 8 PUBLIC