Engineering Department of ICT: Proposal Template and Guidelines
"Explore the comprehensive proposal template for student projects in the School of Engineering's Department of ICT. Covering all key aspects from introduction to methodology, this guide ensures a structured approach to project development in the field."
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
SCHOOL OF ENGINEERING DEPARTMENT OF ICT TOPIC TITLE PROPOSAL TEMPLATE STUDENT NAME: STUDENT ID: SUPERVISOR:
1.0 INTRODUCTION 1.1 Overview
1.4 General Objective 1.4.1 Specific Objectives 1. 2. 3. 1.4.2 Research Questions 1. 2. 3.
2.0 LITERATURE REVIEW 2.1 Overview (A short Note) 2.2 Research Gaps
3.0 METHODOLOGY Project design and approach (e.g., system development, data analysis) Tools and technologies to be used Data collection methods (if applicable)
3.0 MATERIALS AND METHODS Contd Proposed System/Implementation Plan System architecture, frameworks, or algorithms Workflow diagrams, models, or use cases
4.0 Expected Results & Contributions How the project will solve the identified problem ? Potential benefits and impact
6.0 PROJECT TIMELINE Gantt chart