Enhanced Mass Transit Planning in Volusia TPO Area
This discussion covers transit options review, planning efforts, and project development in the Volusia TPO Metropolitan Planning Area. Key figures involved include Robert Babbitt, Susan Sadighi, and Lois Bollenback. Past works like the 2035 Long Range Transportation Plan and Transit Corridor Feasibility Analysis Study are highlighted, along with current efforts such as the Intermodal Transit Station Study. The focus is on enhancing mass transit for sustainable infrastructure and economic development.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
A Discussion of Enhanced Mass Transit in the Volusia TPO Metropolitan Planning Area
Overview of Session To review transit options, previous and existing work efforts and discuss planning and project development. Robert Babbitt is the President/CEO of McDonald Transit Associates. Mr. Babbitt has 33 years of experience as the General Manager of two transit systems with specialization in land use/transit planning, financial planning and analyses, procurement, capital acquisitions, budget developmentand labor-managementrelations. Susan Sadighi Manager for FDOT District 5. Her responsibilities include planning, public transportation and project development. She has a degree in Civil Engineering and has 29 years of transportation industry experience. 22 of those years have been with the FDOT. is the Intermodal Systems Development Lois Bollenback serves as the Executive Director for the Volusia TPO. Ms. Bollenback has worked in various transportation operations and planning environments for almost 30 years. The past 14 years have been spent serving Volusia County.
Previous Work 2035 Long Range Transportation Plan Major planning requirement of the TPO. Purpose is to identify transportation projects to be pursued over a 20-year time horizon. Plan included a cent sales tax for development of mass transit. Plan included: a passenger rail station in Daytona Beach, Phase 2 of SunRail, a SunRail spur to DeLand and Bus Rapid Transit between DeLand and Daytona.
Previous Work Transit Corridor Feasibility Analysis Study Joint effort between FDOT and the Volusia TPO. Purpose was to: assess the feasibility of transit corridors and to further evaluate the most feasible corridors. Study identified cross-county service on I-4 and US 92 and a local circulator in the Daytona Beach area for further study.
Previous Work ISB Coalition Corridor Study Click here to view a more indepth version of the ISB Corridor map. The coalition is a public-private partnership seeking to develop sustainable infrastructure and promote economic development along the ISB (US 92) corridor. ISB Coalition Logo The corridor study was a joint effort between FDOT, ISB Coalition, the City of Daytona Beach and Volusia County. Purpose was to: address transportation needs and the quality of ISB as a gateway to the community.
Current Activity Intermodal Transit Station Study (ITSS) FDOT led study Purpose is to: support the development of an integrated, multimodal transportation system by evaluating transit station needs and locations Study is underway
Other Related Activity Flagler Line (Jacksonville to Miami) SunRail extension to the Daytona Beach International Airport Transit Oriented Development Studies and Guides