ERCOT Meter Working Group Meeting Highlights

meter working group n.w
1 / 10
Embed
Share

Explore key discussions from the ERCOT Meter Working Group meeting on topics such as antitrust admonition, point of interconnection, line loss compensation, and more. Stay informed on the latest industry developments.

  • ERCOT
  • Meter Working Group
  • Meeting Highlights
  • Energy Regulation
  • Industry Updates

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Meter Working Group August 21, 2019

  2. Anti-Trust Admonition and Disclaimer Antitrust Admonition To avoid raising concerns about antitrust liability, participants in ERCOT activities should refrain from proposing any action or measure that would exceed ERCOT s authority under federal or state law. For additional information, stakeholders should consult the Statement of Position on Antitrust Issues for Members of ERCOT Committees, Subcommittees, and Working Groups, which is posted on the ERCOT website. http://www.ercot.com/about/governance/index.html Disclaimer All presentations and materials submitted by Market Participants or any other Entity to ERCOT staff for this meeting are received and posted with the acknowledgement that the information will be considered public in accordance with the ERCOT Websites Content Management Operating Procedure. 2 PUBLIC 8/21/19 MWG

  3. Attendance Roll-call and Introductions Brief introduction of those participating at the ERCOT Austin office and via WebEx 3 PUBLIC 8/21/19 MWG

  4. Discussion on Point of Interconnection Action Item from 3/13/19 MWG Meeting: All TDSPs and ERCOT to work within their respective organizations to define POI and how line loss compensation should be applied for various scenarios to be reviewed and discussed at the next MWG meeting. 4 PUBLIC 8/21/19 MWG

  5. Discussion on Line Loss Compensation Action Item from 5/8/19 MWG WebEx: TDSPs to formulate a technical approach to when loss compensation is needed to help frame protocol language. 5 PUBLIC 8/21/19 MWG

  6. Discussion on 400 yard rule of 10.3.2.3(6) Current Language: 10.3.2.3 Generation Netting for ERCOT-Polled Settlement Meters (6) For purposes of this Section, a common switchyard is defined as an electric substation Facility where the POI for Load and Generation Resources are located at the same Facility but where the interconnection points are physically not greater than 400 yards apart. The physical connections of the Load to its POI and the Generation Resource to its POI cannot be Facilities that have been placed in a TSP s or DSP s rate base. ERCOT Measurement Practices: Measure from the center phase of the furthest most interconnection points. 6 PUBLIC 8/21/19 MWG

  7. Discussion on Instrument Transformer Nameplate Requirements Discussion on possible modifications to the SMOG related to instrument transformer nameplate requirements. Nameplate photo requirement of 6.5.4(1)(i) Nameplate data requirement of 7.5.2(1) Insulating oil (if present) requirement of 7.5.6(1) 7 PUBLIC 8/21/19 MWG

  8. Agenda Items 7 and 8 see other Key Documents Agenda item 7: Report of EPS activities Agenda item 8: Updates to Site Audit Checklist numbering scheme and question order 8 PUBLIC 8/21/19 MWG

  9. New or Other Business Items Request for any new or other business items 9 PUBLIC 8/21/19 MWG

  10. Meeting Summary and Closing Remarks Thank you for your attendance Notes from this meeting will be posted to this meeting on the ERCOT website http://www.ercot.com/calendar/2019/8/21/186832-MWG 10 PUBLIC 8/21/19 MWG