ERCOT Updates and Reports on Operations and System Enhancements
Stay updated on ERCOT's recent activities, including working group updates, system operation reports, reliability entity reports, UFLS reviews, EMS upgrade projects, and more. Explore the latest developments in the energy industry and upcoming events in Texas. Get insights into crucial aspects like inverter-based resource requirements and major transmission element submissions. Stay informed and engaged with ERCOT's ongoing initiatives and improvements.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Operations Working Group Chair- Rickey Floyd Vice-Chair- Theresa Noyes HITE List Sub-Chair Pushkar Chhajed 09/07/2023
ERCOT Updates and System Operation Report June 27, Peak 80,787 MW June Solar Peak 13,086 MW July 31, Peak 82,939 MW July Solar Peak 13,547 MW
Texas Reliability Entity Report TRE provided an update on upcoming events 8/23 Quarterly Board and MRC meeting 8/29 Talk with Texas RE on Oil & Gas industry cybersecurity 9/13 Annual winter weatherization workshop 9/21 Talk with Texas RE on Electric-Gas coordination See TRE and FERC Websites for more information TRE - https://www.texasre.org/ FERC - https://www.ferc.gov/
UFLS Review ERCOT provided results from the UFLS Survey as required by ERCOT Nodal Operating Guides, Section 2.6.1 (2)
EMS Upgrade Project Update ERCOT provided an update on the EMS Upgrade project Closed loop testing is planned time window is between 9/18 11/16 Temporary transfer of control during loop testing Closed loop testing duration is 2 4 hours
NOGRR245 Inverter-Based Resource (IBR) Ride-Through Requirements ERCOT Expects to file comments in the next few days ERCOT still want to get this to the board in October
OTWG Update Manuel Sanchez from Oncor is the new Chair for OTWG ERCOT Winter Storm Drill will be held on 8/24
Review of Major Transmission Element (MTE) Submission and Timeline T.O.s reviewed their recommendations for removal with OWG There were no additions recommended OWG reach consensus on the changes to the MTE/HITE list