Essentials of Project Management: Chapter 7 - Project Procurement
This chapter focuses on the key aspects of project procurement management, including supply chain management, effective client-supplier relationships, and the importance of valuing quality over cost. It delves into various contracts and their implications, as well as the crucial decision-making processes involved in procurement, such as make-or-buy analysis. Additionally, it emphasizes sustainable procurement practices and the overall procurement cycle from planning to contract closure.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Dunwoody Rezoning Process City Council Retreat March 11, 2021
Rezoning Process Pre-application meeting Applicant-initiated meeting Advertisement/letters/signs/website Staff review and recommendation Planning Commission review and recommendation City Council review and decision two reads 4+ months before case reaches City Council
Application Requirements Zoning Ordinance does not specify application materials Rezoning Application Checklist specifies application materials Site Plan showing buildings, driveways, setbacks, etc. Building elevations or renderings Typical submittal: Zoning Plan Conceptual not fully engineered Shows compliance with typical district standards (setbacks, buffers, etc.) Architectural design/engineering after zoning approval
Needs - - Land purchase & financing contingent on zoning approval Architecture & Engineering expensive (5 10% of total) Developer Staff City Council - - Quality product No surprises - - Permitting is non-discretionary No conflicts between zoning and code
Dunwoody-specific Rezoning Challenges Code ranges from very detailed to not detailed Building design regulated in Perimeter Center and Dunwoody Village; not regulated in other parts of the City Lot coverage vs. max. impervious surface vs. floor-area ratio Similar, but differently defined standards create challenges for permitting Different approval paths for similar requests District Zoning approval Relief Timeline Typical City Council ZBA (Variance) Sequential Perimeter Center City Council City Council (SLUP) Concurrent Dunwoody Village City Council ZBA (Special Exception) Sequential PD district City Council N/A N/A
Dunwoody-specific Rezoning Challenges Different regulatory complexity Dunwoody today Perimeter Center Detail required by case review Dunwoody today Traditional districts DeKalb 1970s/1980s Detail required by code
Dunwoody-specific Rezoning Challenges Different regulatory complexity Dunwoody today Perimeter Center Detail required by case review Dunwoody today Traditional districts DeKalb 1970s/1980s Detail required by code
Dunwoody-specific Rezoning Challenges Conflicts between zoning conditions and code Double regulation with room for conflict Example: 1649 Courtleigh Drive Stream buffer variance for a new house: Variance condition: Must obtain tree removal permit , but code allows for tree removal as part of a construction permit Material conflicts Example: 84 Perimeter Center East: Execution requires pervious paver solutions in locations that did not have soil sampling/engineering Timing Roberts Drive: Council wanted detailed engineering on drainage and storm water and detailed elevations before the zoning. Developer wanted to wait until he had zoning before proceeding on the full engineering and architectural.