First Year German STEM Course Overview
In this German course, Professor Amanda Jorgenson provides a syllabus focusing on technology, personalized assessment, and learning tools. The agenda covers language basics, homework, and online resources. Students are encouraged to create blogs, explore open-access materials, and practice pronunciation. The course emphasizes individual outcomes and shifts from traditional assessment methods to project-based evaluation. The syllabus outlines a tech-forward approach without textbooks or quizzes. Students are guided to set learning goals, assess their progress, and utilize diverse online resources for language development.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Curb and Gutter Under Construction Completed http://www.ellsworthinc.com/concretework.html http://www.sscsitework.com/Photo-Gallery.html
Curb and Gutter Formwork http://overmanconcrete.com/concrete-services.html
Curb and Gutter Machine http://overmanconcrete.com/concrete-services.html
Gutter Flow 5 3? 1 2 ? =?? 8 3?? ??? T Sx d 1 Q = flow in gutter (cfs) Cf = coefficient (0.56 for US units, 0.376 for SI units So = longitudinal slope T = spread (ft) Sx = transverse slope Ref: SCMD p. 372
City of Austin Drainage Criteria for Minimum Clear Width City of Austin, Drainage Criteria Manual, Section 3
Flow into a Curb Inlet LT 0.6 1 0.3 ??= ???0.42?? ??? LT = required length to intercept all flow (ft) Q = flow in gutter (cfs) Cf = coefficient (0.60 for US units, 0.817 for SI units) So = longitudinal slope T = spread (ft) Sx = transverse slope 1.8 ? ? = 1 1 ?? E = efficiency (proportion of flow captured L = actual length (ft) (for L < LT) Ref: SCMD p. 393
Storm Drain Manhole http://www.kanapipeline.com/images/manhole-cone.html http://www.lbiw.com/article/resources/agencystandardplandrawings/agencystandardplandrawings.html?region=CITY%20OF%20PASO%20ROBLES/E- 7.1%20-%20STORM%20DRAIN%20MANHOLE.pdf