Formation des RECs et des EM sur le processus de soumission de projets PIDA-PAP 2
PIDA is a continent-wide infrastructure program aiming to accelerate regional integration for growth and prosperity in Africa. Learn about its structure, priorities, initiatives, and key instruments in project preparation and implementation.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
FORMATION DES RECS et des EM sur le processus de soumission de projets PIDA-PAP 2 Programme for Infrastructure Development in Africa (PIDA) 4- 6 March 2020 Gaborone, Botswana 22 February 2025
Introduction PIDA is a continent-wide infrastructure program that sets out a vision for building inclusive, economically viable and technically sustainable infrastructure economic development in Africa and its integration into the global economy. to promote socio- PIDA is a continental initiative, which is based on the REC Master Plans, with the participation of the AUC, AUDA- NEPAD, AfDB, UNECA The Heads of State and Government adopted the PIDA at the 18th ordinary session held in Addis Ababa, Ethiopia, on January 29 and 30, 2012. (Assembly / AU / Decl.2 (XVIII)). 22 February 2025 2
Introduction PIDA is structured around priorities in three phases: short term (2012-2020), medium (2021-2030) and long term (2031- 2040) PIDA concerns the development of priority projects in the transport, energy, cross-border water resources and ICT sectors. PIDA is broken down into Priority Action Plans (PAPs). PIDA- PAP 1, whose implementation was planned between 2012 and 2020, included 51 regional programs broken down into more than 400 individual projects in the energy, transport, ICT and Transboundary Water sectors. 22 February 2025 3
PIDA & Agenda 2063 Aspiration 2: An Integrated Continent, Politically United, based on the Ideals of Pan Africanism and the Vision of Africa s Renaissance Goal 10: World Class Infrastructure crisscrosses Africa Key priority of action: Communications and Infrastructure connectivity PIDA's overall strategic objective aims at accelerating the regional integration of the continent and to act as a springboard for growth and prosperity. 22 February 2025 4
INSTRUMENTS NEPAD Infrastructure Project Preparation Facility Provides support for feasibility studies to take projects into bankability PIDA Service Delivery Mechanism (SDM) provides capacity for early stage project preparation Continental Business Network (CBN) 5% Agenda mobilizes private sector resources for African infrastructure development Regulatory and Policy Support (RPS) creates an enabling environment for project implementation PIDA M&E and Information Management tracks project progress and disseminates information to stakeholders Presidential Infrastructure Champion Initiative (PICI) accelerates infrastructure development through political championing PIDA Capacity Building Project Improve capacity of the AUC, AUDA/NEPAD, RECs, and Implementing Agencies Institutional Framework IAIDA Progress in IAIDA Operationalisation (e.g. PIDA Steering Committees twice per year; distribution of labour between AUC, NEPAD, RECs; etc.) 22 February 2025
STATUS OF IMPLEMENTATION 26 % from concept to pre-feasibility or feasibility phases 17 % are currently being structured for tendering 35 % (143 projects) are either under construction or are already operational In brief, PIDA has produced the following development impacts Road: 16,066 KM was built throughout the continent Railway: 4,077 KMs was built In the Energy sector, a total Transmission Line capacity of approximately 3,506 KM was added In the ICT sector, a total of 17 countries are connected with regional fibre optic cables Through constructed and operational PIDA projects, 112,900 jobs were directly and 49,400 indirectly created (Job toolkit) 22 February 2025
SOME EXAMPLES OF PIDA PROJECTS Transport sector Launch of the Single African Air Transport Market under the YD Development of the SMART Corridor guideline Railway Addis Ababa-Djibouti Energy sector Kaleta Dam (240MW) complete, Grand Renaissance (6 000 MW) under construction, Transmission Line capacity of approximately 3,506 km built ICT sector 43 Countries are connected with regional fibre optic cables 38 countries have set Internet Exchange Point Policy and Regulation for Digital Africa (PRIDA) as started Water sector Lesotho HWP Phase II water transfer component - This phase was launched in March 2014 22 February 2025
Virtual PIDA Information Centre (VPIC) http://pida.africa PIDA Projects Dashboard Filter by Sector, Regions Resources documents 22 February 2025 8
Lessons learnt from PIDA PAP 1 PIDA-PAP 1 was the subject of a mid-term review process (MTR) which covered different aspects (organizational, procedure, capacity, funding, implementation, etc.). This review served as a basis for drawing lessons and making recommendations for better planning and implementation of PIDA-PAP 2. The Key lessons learnt are : Need for a more rigorous selection process Need for a short list but with more operational projects Need to take on board dificulties for implementation Based on the lessons learned from PIDA-PAP 1 and in the light of the changes observed in the last ten years in the infrastructure sectors in Africa, a process specific to PIDA-PAP 2 has been developed. 22 February 2025 9