GHSP Supplier Training for Cumulative Order Maintenance

ghsp supplier training cumulative order n.w
1 / 10
Embed
Share

Explore GHSP Supplier Training for maintaining Cumulative Orders in automotive Tier 1 suppliers. Learn about order reconciliation, responsibilities, and resolving discrepancies. GHSP ensures accurate tracking and verification of cumulative order quantities through the training provided.

  • GHSP
  • Supplier Training
  • Cumulative Orders
  • Automotive Suppliers
  • Order Maintenance

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. GHSP Supplier Training Cumulative Order Maintenance GHSP Confidential

  2. GHSP Supplier CUM Training The generation, verification, tracking, and reconciliation of CUM (Cumulative) order quantities is the standard for Automotive Tier 1 suppliers, including GHSP. This training will cover: Reading the GHSP Supplier Release The basics of Cum Order Maintenance GHSP requires suppliers to reconcile CUMs upon receipt of each release, and to identify discrepancies and initiate resolution when necessary. GHSP Confidential

  3. GHSP Supplier CUM Training The sample provided on the right is typical of a release suppliers will see in the SV portal The following slides will provide a tutorial on how to read this product release and outline a GHSP suppliers responsibilities in supporting the cumulative based scheduling system. GHSP Confidential

  4. GHSP Supplier CUM Training Prior row any requirements showing due in this row are considered past due. The supplier needs to contact GHSP immediately to resolve past due requirement issues. In this example there are no current past due quantities. GHSP Confidential

  5. GHSP Supplier CUM Training Reviewing the example one might easily assume the next qty due is 200pcs on 11/18/2014. Under normal circumstances, this is correct, however, there are many instances where this may not be the case. This is where the cumulative portion of the release comes into play. Utilizing the cum information allows for verification of actual requirements GHSP Confidential

  6. GHSP Supplier CUM Training The Net Req Qty of 200pcs is the result of the following equation. Cum Req Qty minus Cum Received The Cum Received number is integral in this equation from a supplier perspective. This number is a running (cumulative) total of product received in GHSP s ERP system. GHSP Confidential

  7. GHSP Supplier CUM Training GHSP requires suppliers to keep a cumulative total of product shipped either electronically or manually and reconcile this number for each release issued. This is considered the suppliers cum shipped. If a suppliers cum shipped matches the GHSP cum received the Net Req Qty is valid. If there is a discrepancy the supplier needs to contact their GHSP materials contact to resolve the issue immediately. GHSP Confidential

  8. GHSP Supplier CUM Training Common errors that will effect GHSP s Cum Received total Issuance of a Problem Tracking Report (PTR) due to a receiving variance (qty is over/under the packing slip quantity issued by supplier) A Supplier Material Return has been processed by the quality department CUM resets (may be done annually and suppliers will be notified of the reset prior to the action being taken) Prior receiving error corrections GHSP Confidential

  9. GHSP Supplier CUM Training To assist you in tracking your Cum Shipped the GHSP Material Release will provide you with: Receipt Date the last date that the material was received in GHSP s ERP system Receipt Qty number of parts received on the Receipt Date Packing Slip / Shipper the unique ID assigned to the shipment GHSP Confidential

  10. GHSP Supplier CUM Training Following the Cum Reconciliation process for each product release will help to ensure that you re providing GHSP with the right amount of product at the right time GHSP Confidential

Related


More Related Content