Helsinki Energy Decision 2015

Helsinki Energy Decision 2015
Slide Note
Embed
Share

An overview of the Helsinki energy decision in 2015, including options for power plant renovations, new construction projects, decentralized energy production, and energy-saving campaigns. The assessment process involves an online collaborative model to stimulate public discussion and improve quantitative assessment data.

  • Helsinki energy
  • Decision 2015
  • Power plants
  • Energy assessment
  • Collaborative model

Uploaded on Mar 11, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Helsingin energiapts 2015 Jouni Tuomisto THL, Kuopio

  2. Yleiskuva Miksi THL tekee energia-arviointia? Millainen on Sofia-malli? Alustavia tuloksia Ty njako ja ryhmiin jakautuminen Miten t st eteenp in?

  3. Miksi THL tekee arviointia? Terveys- ja ilmastovaikutukset ansaitsevat tarkempaa arviointia. N m vaikutukset ovat kiinnostavia my s kertaalleen hyl ttyjen vaihtoehtojen osalta. Yleisen tavoitteena edist m r lliseen arviointiin pohjautuvaa yhteiskunnallista keskustelua.

  4. Miksi energiatasemalli? Energian kysynn n ja tuotannon pit vastata toisiaan jatkuvasti. Monien tuotantomuotojen kokonaisuus on vaikea hahmottaa. Nettimallien avulla asiaa voi opiskella. Sofia-malli osallistuu keskusteluun.

  5. Helsinki energy decision 2015 A major decision will be made late 2015. Main options: Business as usual (BAU) Hanasaari and Salmisaari power plants are renovated A new power plant is built in Vuosaari to burn 80 % wood-based fuel. Hanasaari power plant is demolished and replaced with apartments. Decentralised energy production is built as much as is feasible. Massive energy saving campaign to reduce the need of energy. District heating from Loviisa 3 power plant or Neste Oil refinery.

  6. Helsinki energy decision assessment An online collaborative model has been launched to perform this assessment. Work coordinated by THL. Anyone can participate. Aim to stimulate large public discussion to improve the quantitative assessment Improve the richness and reliability of its input data. http://en.opasnet.org/w/Helsinki_energy_decision_2015

  7. Discussion types (based on level of synthesis) Free discussions Focussed discussions (on a specific topic) Structured discussions (obeying discussion rules) Variables (quantified and modelled)

  8. Discussion as source of data

  9. Structured discussion

  10. Resolutions of discussions

More Related Content