kisti kisti gsdc tier gsdc tier 1 1 site report n.w
1 / 9
Embed
Share

Discover key insights from the KISTI-GSDC operations meeting in Taiwan, including updates on job pledges, storage pledges, site availability, and more. Get an overview of the discussions and achievements in this report.

  • KISTI
  • GSDC
  • Operations
  • Meeting
  • Taiwan

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. KISTI KISTI- -GSDC Tier GSDC Tier- -1 1 SITE REPORT SITE REPORT @ Acamedia Sinica, Taipei, Taiwan 13 14 March 2016 Byungyun KONG on the behalf of KISTI-GSDC 2016-03-13 LHCOPN-LHCONE Meeting @Taiwan 1

  2. Tier Tier- -1 Operations 1 Operations 2016-03-13 LHCOPN-LHCONE Meeting @Taiwan 2

  3. Jobs Pledges 2014 25,000 (28,800) 2015 28,000 (28,800) 2016 31,000 (31,000) Participated in Hi Reco Run with 6GB memory (Doubled) CORE(HS06) (Installed) Maximum 2,688 Maximum 2,688 concurrent jobs concurrent jobs Hi Reco Run Hi Reco Run Maximum 1,344 concurrent jobs Maximum 1,344 concurrent jobs > 5GB memory available per job for Hi > 5GB memory available per job for Hi Reco Reco Run Run 2016-03-13 LHCOPN-LHCONE Meeting @Taiwan 3

  4. Storage Pledges 2014 1,500 (1,000) 1,000 (1,000) 2015 1,500 (1,500) 1,000 (1,000) 2016 1,500 (1,500) 1,500 (1,500) Tape used almost Tape used almost 1,500TB 500TB 500TB will be installed will be installed 99% 99% availability during 6 months availability during 6 months 1,500TB Tape(TB) (Installed) Disk(TB) (Installed) 1.465 PB Used (Tape) 1.465 PB Used (Tape) 852.7 TB Used (Disk) 852.7 TB Used (Disk) Run2 Data Taking Run2 Data Taking 2016-03-13 LHCOPN-LHCONE Meeting @Taiwan 4

  5. Site Availability-Reliability 100% 100% Reliability for the last 6 month (target : 97%) On track for a stable and reliable site Participating in weekly WLCG operations meetings : reporting operation-related issues 24/7 monitoring & maintenance contract 2 people responsible for on-call < Monthly Availability < Monthly Availability- -Reliability (%) > Reliability (%) > Aug Aug Sep Sep Oct Oct Nov Nov Dec Dec Jan Jan Average(6M) Average(6M) Reliability 100 100 100 100 100 100 100 Availability 100 100 100 100 94 100 99 The stable operating for a high reliability and availability site 2016-03-13 LHCOPN-LHCONE Meeting @Taiwan 5

  6. Asia Tier Center Forum Asia Tier Center Forum 2016-03-13 LHCOPN-LHCONE Meeting @Taiwan 6

  7. 1stAsia Tier Center Forum 22 24, September, 2015 at KISTI, South Korea Agreed to implement LHCONE VRF in their networks https://indico.cern.ch/event/395656 2016-03-13 LHCOPN-LHCONE Meeting @Taiwan 7

  8. 2ndAsia Tier Center Forum Where? Where? SUT, Thailand When? When? Fall, 2016 be fixed at steering meeting in April Mailing Mailing- -list list asia-tier-center-forum (CERN e-groups) Website Website atcforum.org Thanks to Prof. Chinorat Kobdaj 2016-03-13 LHCOPN-LHCONE Meeting @Taiwan 8

  9. 2016-03-13 LHCOPN-LHCONE Meeting @Taiwan 9