HTS Conductor Development and Budget Planning

hts conductor development n.w
1 / 4
Embed
Share

"Explore the strategic importance of HTS conductors, potential synergies for development, and budget allocations for research. Join forces now to meet future demands in HTS technology innovation within the EU-DEMO program. Valentina Corato's insights shed light on current challenges and opportunities in the field."

  • HTS technology
  • Conductor development
  • Budget planning
  • Innovation
  • Research

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. HTS conductor development Valentina Corato - ENEA

  2. Premises The HTS/LTS hybrid CS has a strategic importance in the FP9 R&D work-plan. However presently none of the proposed options for HTS conductors has operated at degradation under mechanical and thermal cycles full performances without It s worth joining all forces to achieve the goal, because we have 3-4 years maximum to demonstrate that the HTS concept can work before the down-selection. NOW or NEVER (at least within EU-DEMO programme, assuming that the requested budget will be given) Valentina Corato | HTS conductor development| VC| 23/03/2021 | Page 2

  3. Possible routes/synergies Verify the possibility to integrate the CroCo strands in the SPC design or in an alternative common design for the CS HTS cable. This would allow to exploit the equipment realized at KIT for manufacturing long strands. ENEA could also contribute on the manufacture of the conductor through its industrial contacts. ENEA could develop an alternative design of the hybrid CS coil based on its conductor, which has a completely different layout. Valentina Corato | HTS conductor development| VC| 23/03/2021 | Page 3

  4. Potential budget Assuming that the requested budget will be approved . KIT (Total budget 21-25: Equip. 210k + Facility use 400k ) Equipment for HTS samples:210 k Use of KIT facilities for conductor development: 200 k (other 200k for HV tests on samples to study insulation) ENEA (Total budget 21-25: Equip. 515k + Facility use 85k ) Equipment for HTS samples:215 k Use of ENEA facilities for conductor development: 85 k (other 300k for manufacturing samples to study insulation) SPC (only budget for HTS 21-25): Equipment for HTS samples: 2 015 k This industrial activity starts in 2022. If no suitable conductors will be available, it could be partially converted into short- length conductor development 1 CS sample (100 k ) + 50 m HTS conductor (1 915 k ) Sultan tests for HTS conductors: 280k (4 tests) + 2500 k in 2026 for manufacture and test of HTS insert Valentina Corato | HTS conductor development| VC| 23/03/2021 | Page 4

More Related Content