Hydrophobicity and Unit Hydrographs in Watershed Management
Learn about the impact of dry soil on infiltration during floods and explore the concept of synthetic unit hydrographs for watershed analysis. Discover how hydrophobicity affects soil properties and the computation of standard unit hydrographs using Snyder's method.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Heard on the news about California Floods Infiltration was less because the soil was dry. Why? Green-Ampt method says that drier soil has higher But Hydrophobicity (especially after fires) http://geography.swansea.ac.uk/hydrophobicity/ soil_hydrophobicity.htm K( ) 0 for dry soil due to residual water being disconnected ? = ? 1 +? ? ?
Synthetic Unit Hydrographs A unit hydrograph is intended to quantify the unchanging characteristics of the watershed The synthetic unit hydrograph approach quantifies the unit hydrograph from watershed attributes Table 8.4.1 gives the steps to compute Snyder s Synthetic Unit Hydrograph 1/3 2/3
Example 8.4.1 A watershed has a drainage area of 5.42 mi2; the length of the main stream is 4.45 mi, and the main channel length from the watershed outlet to the point opposite the center of gravity of the watershed is 2.0 mi. Using Ct = 2.0 and Cp = 0.625, determine the standard synthetic unit hydrograph for this basin. What is the standard duration? Use Snyder s method to determine the 30- min unit hydrograph parameter. 1/3 2/3
Result (4.05,570) (5.97,427.5) (7.47,285) (3.09,427.5) (2.37,285) (14.1,0) (0,0)
Example 8.4.1 Snyder's Synthetic Unit Hydrograph - Result A watershed has a drainage area of 5.42 mi2; the length of the main stream is 4.45 mi, and the main channel length from the watershed outlet to the point opposite the center of gravity of the watershed is 2.0 mi. Using Ct = 2.0 and Cp = 0.625, determine the standard synthetic unit hydrograph for this basin. What is the standard duration? Use Snyder s method to determine the 30- min unit hydrograph parameter. Follow the procedure of table 8.4.1 L = main channel length = 4.45 mi Lc = length to point opposite centroid = 2.0 mi A = watershed area = 5.42 mi2 ??= ?1??? ?? ??= ??/5.5 = 0.7 ? ???= ??+ 0.25 ?? ?? = 3.85 + 0.25 0.5 0.7 = ?.? ?? 0.3 ? = 1 2 4.45 20.3= 3.85 ? ?2??? ??? ???= = 640 0.625 5.42/3.8 = ??? ??? Widths ?75= ?75 440 570/5.421.08= 2.88 ? 770 570/5.421.08= 5.04 ? ??? 1.5 ?50 ?75= 25815.42 2.88 = 14.1 ? 1.08= (4.05,570) ???/? ?50 ?50= 1.08= ???/? (3.09,427.5) (5.97,427.5) ? ??= 2581 570 1.5 5.04 W75 (2.37,285) (7.41,285) W50 1/3 2/3 (14.1,0)
S Curves From Mays, 2011, Ground and Surface Water Hydrology