I-Move Kentucky Design-Build Project: Enhancing Transportation Infrastructure
This project focuses on improving safety, relieving congestion, and providing cost-effective solutions for priority transportation projects in Kentucky. By utilizing an expedited design-build approach, the project aims to reduce construction impact and streamline project delivery. Key initiatives include expanding highways, widening bridges, and reconstructing interchanges to enhance mobility and address infrastructure needs efficiently.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
I-Move Kentucky Design-Build Project Expedited Approach Provides Cost Savings, Reduces Impact for Priority Projects Transportation Secretary Greg Thomas Interim Joint Committee on Transportation June 3, 2019
Project Objectives Improve safety & relieve congestion on busy freight corridor Provide lower-cost solution to build priority projects Lessen construction impact for local/regional travelers T R A N S P O R TAT I O N . K Y. G O V
I-265 Widening Project Project: Expand I-265 to six lanes Widen bridges Address bridge/ pavement needs SYP cost estimate: $93.2 million T R A N S P O R TAT I O N . K Y. G O V
I-71/I-265 Interchange Project Project: Add collector-distributor lane for I-71 southbound Improve safety and mobility SYP cost estimate: $5.4 million T R A N S P O R TAT I O N . K Y. G O V
I-71 Widening Project Project: Expand I-71 to six lanes from I-265 to KY 329 Reconstruct five bridges Significantly reduce congestion SYP cost estimate: $61 million T R A N S P O R TAT I O N . K Y. G O V
I-64/I-265 Interchange Project Project: Reconstruct major interchange Improve safety and reduce congestion SYP cost estimate: $28 million T R A N S P O R TAT I O N . K Y. G O V
Design-Build Approach Utilizes increased Design-Build authorization (2018 HB 385) Improves coordination during construction Accelerates projects to lower actual costs Encourages innovation and creativity from teams Avoids bridge and pavement maintenance items