IEEE 802.11-18/2108r1 AANI SC Agenda Summary 2019

january 2019 n.w
1 / 17
Embed
Share

Explore the agenda, reminders, and rules for the IEEE 802.11-18/2108r1 AANI SC meeting in January 2019. Discover key topics, guidelines for IEEE-SA meetings, and the importance of compliance with antitrust laws. Get insights into technical discussions and future session planning.

  • IEEE
  • Agenda
  • Guidelines
  • AANI SC
  • Antitrust

Uploaded on | 4 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. January 2019 doc.: IEEE 802.11-18/2108r1 AANI SC Agenda Date: 2019-01-17 Authors: Name Affiliations Address 2 Huntington Quadrangle 4th floor, South Wing Melville, NY 11747 Phone email Joseph LEVY InterDigital, Inc. +1.631.622.4139 jslevy@ieee.org Agenda Slide 1 Joseph Levy (InterDigital)

  2. January 2019 doc.: IEEE 802.11-18/2108r1 Abstract Agenda for: 802.11 AANI SC (Advanced Access Network Interface Standing Committee) January 2019 Hilton St Louis at the Ballpark, St. Louis, Missouri, USA Chair: Joseph Levy (InterDigital) Vice Chair: Open Secretary: Open Agenda Slide 2 Joseph Levy (InterDigital)

  3. January 2019 doc.: IEEE 802.11-18/2108r1 Reminders and Rules Call for Secretary Reminders to attendees: Please record your attendance Please mute any noise making devices No recordings AANI SC Operating Rules: Anyone present can vote, present, and make motions Participation in the AANI SC at this meeting counts towards 802.11 voting rights All technical motions must pass by a 75% majority Agenda Slide 3 Joseph Levy (InterDigital)

  4. January 2019 doc.: IEEE 802.11-18/2108r1 Agenda Thursday AM1 1. Call for Secretary 2. Administrative: Reminders, Rules, Guidelines, Resources, Participation, Approval of Minutes 3. Background/Status 1. Liaison Statement history 2. Status: WLAN integration in 3GPP NextGen System 3. Status: 802.11ax performance relative to the IMT-2020 EMBB requirements 4. Report on response to Liaison Statement 11-18/1340r9 4. Nendica Update Roger Marks (TBC) 5. Discussion / Contributions 1. 802.11 technical performance relative to IMT-2020 requirements 11-19/0193r0 2. ???? 6. Future Sessions Planning Agenda Slide 4 Joseph Levy (InterDigital)

  5. Guidelines for IEEE-SA Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don t discuss the interpretation, validity, or essentiality of patents/patent claims. Don t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don t discuss the status or substance of ongoing or threatened litigation. Don t be silent if inappropriate topics are discussed do formally object. --------------------------------------------------------------- If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at patcom@ieee.org or visit http://standards.ieee.org/about/sasb/patcom/index.html See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy for more details. This slide set is available at https://development.standards.ieee.org/myproject/Public/mytools/mob/preparslides.ppt Joseph Levy (InterDigital)

  6. January 2019 doc.: IEEE 802.11-18/2108r1 Resources URLs Link to IEEE Disclosure of Affiliation http://standards.ieee.org/faqs/affiliationFAQ.html Links to IEEE Antitrust Guidelines http://standards.ieee.org/resources/antitrust-guidelines.pdf Link to IEEE Code of Ethics http://www.ieee.org/web/membership/ethics/code_ethics.html Link to IEEE Patent Policy http://standards.ieee.org/board/pat/pat-slideset.ppt Agenda Slide 6 Joseph Levy (InterDigital)

  7. January 2019 doc.: IEEE 802.11-18/2108r1 Participation in IEEE 802 Meetings Participation in any IEEE 802 meeting (Sponsor, Sponsor subgroup, Working Group, Working Group subgroup, etc.) is on an individual basis Participants in the IEEE standards development individual process shall act based on their qualifications and experience. (https://standards.ieee.org/develop/policies/bylaws/sb_bylaws.pdf section 5.2.1) IEEE 802 Working Group membership is by individual; Working Group members shall participate in the consensus process in a manner consistent with their professional expert opinion as individuals, and not as organizational representatives . (subclause 4.2.1 Establishment , of the IEEE 802 LMSC Working Group Policies and Procedures) Participants have an obligation to act and vote as an individual and not under the direction of any other individual or group. A Participant s obligation to act and vote as an individual applies in all cases, regardless of any external commitments, agreements, contracts, or orders. Participants shall not direct the actions or votes of any other member of an IEEE 802 Working Group or retaliate against any other member for their actions or votes within IEEE 802 Working Group meetings, see https://standards.ieee.org/develop/policies/bylaws/sb_bylaws.pdf section 5.2.1.3 and the IEEE 802 LMSC Working Group Policies and Procedures, subclause 3.4.1 Chair , list item x. By participating in IEEE 802 meetings, you accept these requirements. If you do not agree to these policies then you shall not participate. (Latest revision of IEEE 802 LMSC Working Group Policies and Procedures: http://www.ieee802.org/devdocs.shtml) Agenda Slide 7 Joseph Levy (InterDigital)

  8. January 2019 doc.: IEEE 802.11-18/2108r1 Approval of Minutes Minutes from the November F2F Meeting in Bangkok, Thailand: 11-18/2051r0 Comments? Objections to approving the minutes? Approved by unanimous consent. Agenda Slide 8 Joseph Levy (InterDigital)

  9. AANI SC Background 1/3 January 2019 doc.: IEEE 802.11-18/2108r1 At the July 802 Plenary 802.11 passed a motion forming the AANI SC [11-16/1057r1] Liaison Statements Sent: 802.11 sent an LS (11-16/1101r10) to 3GPP RAN and SA (9/16) 802.11 sent an LS (11-16-/510r2) to 3GPP RAN2 (1/17) 802.11 sent an LS (11-16/1573r3) to 3GPP RAN (1/17) 802.11 sent an LS (11-17-0378r2) to 3GPP RAN2 (5/17) 802.11 sent an LS (11-16/1574r3) to 3GPP SA (5/17) 802.11 sent an LS (11-17/1744r3) to NGMN (11/17) 802.11 sent an LS (11-17/1750r3) to IEEE 5G (11/17) 802.11 sent an LS (11-18/1340r9) to 3GPP SA (11/18) Liaison Statements Received: 3GPP RAN2 WG sent an LS (11-17/0315r0) (3/17) 3GPP RAN TSG sent an LS (11-17/0444r0) (3/17) 3GPP SA TSG sent an LS (11-17/0903r0) (6/17) NGMN sent an LS (11-17/1569r0) (10/17) Agenda Slide 9 Joseph Levy (InterDigital)

  10. January 2019 doc.: IEEE 802.11-18/2108r1 AANI SC Background 2/3 Incoming LS from 3GPP TSG SA 6/17 (11-17/0903r0): Reply LS to IEEE 802.11 Requesting Status and Information on WLAN integration in 3GPP NextGen System Sent by 3GPP TSG SA in reply to our LS (11-16/1574r3) to 3GPP TSG SA (5/17): IEEE 802.11 Working Group Liaison Statement Requesting status and technical information on WLAN integration in 3GPP NextGen System. Contribution regarding the ongoing 3GPP TSG SA work: 11-17/1064r0 Overview of 3GPP SA Next Generation System Documents Related to Non-3GPP Access to the 5G Core Network 11-18/0481r0 3GPP TSG SA Status Update 11-18/1243r0 3GPP Update/Status (Release 15 June 2018) Additional contributions encouraged Agenda Slide 10 Joseph Levy (InterDigital)

  11. January 2019 doc.: IEEE 802.11-18/2108r1 AANI SC Background 3/3 Contributions on 802.11ax performance relative to IMT-2020 EMBB requirements: 11-18/0256r0 802.11ax for IMT-2020 11-18/0517r2 802.11ax for IMT-2020 eMBB Indoor Hotspot and Dense Urban 11-18/0915r3 Benchmarking of 802.11ax against eMBB Indoor Hotspot requirements using IMT-2020 simulation methodology 11-18/1240r4 802.11ax for IMT-2020 eMBB Indoor Hotspot 11-18/1573r7 Summary of 802.11ax Self Evaluation for IMT-2020 EMBB Indoor Hotspot and Dense Urban Test Environments 11-18/1340r9 Proposed LS to 3GPP/WFA/WBA/WifiForward on the studies done regarding benchmarking of 802.11ax capabilities LS sent by the 802.11 WG Chair, based on: 11-18/1340r9 Agenda Slide 11 Joseph Levy (InterDigital)

  12. January 2019 doc.: IEEE 802.11-18/2108r1 Report on Liaison Statement to 3GPP SA At the November 802.11 meeting in Bangkok, Thailand 11-18/1340r9 was approved and sent by the Chair to 3GPP SA (note: a correction updating references followed). The LS was received by 3GPP SA: TD SP-180936 LS from IEEE 802.11: IEEE 802.11 study results benchmarking 802.11ax capabilities to meet Indoor Hotspot test environment defined by IMT-2020. (IEEE 802.11) Abstract: The IEEE 802.11 WG would like to kindly inform you of the results of the studies documented in [1], [3], [4], and [5] regarding benchmarking of IEEE P802.11ax [1] capabilities in the Indoor Hotspot environment defined by IMT-2020 ([6], [7]). The IEEE 802.11WG believes these studies conclusively show that: P802.11ax [1] meets the salient IMT-2020 requirements for the Indoor Hotspot environment, including mobility. The IEEE 802.11 WG invites you to consider these results in the context of ongoing work regarding WLAN interworking with 3GPP systems, and looks forward to a continued, productive exchange of information. Discussion and conclusion: This LS was noted. TD SP 181212 LS from IEEE P802.11: IEEE 802.11 study results benchmarking 802.11ax capabilities to meet Indoor Hotspot test environment defined by IMT-2020. (IEEE P802.11) Abstract: This document presents the self-evaluation of 802.11ax vis- -vis the IMT-2020 minimum requirements for the Indoor Hotspot test environment of the eMBB usage scenario [2]. The self-evaluation follows the methodology specified in [2]. This document is a summary of the results presented to IEEE 802.11 in [3], [4] and [5] with some additional observations. R6 includes minor modifications of editorial nature suggested during the AANI SC session, Monday, November 12, PM2. R7 corrects the dates of references 4, 5 and 5 6 and clarifies reference Discussion and conclusion: This LS was noted. Agenda Slide 12 Joseph Levy (InterDigital)

  13. January 2019 doc.: IEEE 802.11-18/2108r1 Nendica Status IEEE 802 Nendica will meet this week in Bangkok: Tuesday 15 January, EVE 19:30-21:30 (TBC) Status: Roger Marks is Nendica chair All NENDICA documents available at: https://mentor.ieee.org/802.1/documents 1-18/0084r0 Minutes of Nendica meeting of 2018-11-29 Work in process: 1. 1-18/0002r5 Draft Report Wired Wireless Flexible Factory IoT 1-18/0025r6 Pre-Draft: Wired/Wireless Use Cases and Communication Requirements for Flexible Factories IoT Bridged Network Work completed: 1. Lossless Network for Data Centers Published 2018-08-17 1-18/0042r0 Nendica status report (provided by Roger Marks, Nendica Chair) Agenda Slide 13 Joseph Levy (InterDigital)

  14. January 2019 doc.: IEEE 802.11-18/2108r1 Discussion / Contributions TBD Agenda Slide 14 Joseph Levy (InterDigital)

  15. January 2019 doc.: IEEE 802.11-18/2108r1 Topics for Contribution 1. Technical and discussion contributions on 802.11 technical performance relative to IMT-2020 requirements. 1. Benchmarking of 802.11 performance. 2. Analysis and simulation results of 802.11 performance relative to the IMT-2020 requirements. 3. Discussion and planning contributions related to progressing this work. Technical and discussion contributions on interworking/integration of 802.11 with the 3GPP Next Generation System: 1. Reviews or tutorials on current 3GPP SA solutions related to 3GPP 2G/3G/4G core network and 802.11 2. Reviews, tutorials, or commentary on the completed 3GPP SA studies for 5G 3. Reviews, Tutorials, or commentary on 3GPP SA WGs ongoing activities related to 5G for 3GPP 4. Technical and discussion contributions on interworking/integration with 3GPP RAN NR. Lower priority as 3GPP RAN TSG is not currently working on interworking specifications. In support of 802.1 NENDICA 1. proposals of industries to address 2. contributions defining areas of 802.11 interest or discussion 2. 3. Agenda Slide 15 Joseph Levy (InterDigital)

  16. January 2019 doc.: IEEE 802.11-18/2108r1 Future Sessions Planning Teleconference: As required with 10 days notification 10-16 March 2019 F2F, Hyatt Regency Vancouver and Fairmont Hotel Vancouver, Vancouver, Canada : The AANI SC is contribution driven, contributions are requested: 1. Technical and discussion contributions on 802.11 technical performance relative to IMT-2020 requirements. 2. Technical and discussion contributions on interworking/integration of 802.11 with the 3GPP Next Generation System: 3. In support of 802.1 Nendica Note: IMT-2020 proposals are due June 2019 Meeting time requested: 1 sessions Monday PM2 (TBC) Agenda Slide 16 Joseph Levy (InterDigital)

  17. January 2019 doc.: IEEE 802.11-18/2108r1 References Agenda Slide 17 Joseph Levy (InterDigital)

More Related Content