IEEE 802.11 TGba Wake-up Radio Operation Agenda
This presentation provides the IEEE 802.11 TGba Wake-up Radio (WUR) Operation agenda for the July 2018 session chaired by Minyoung Park from Samsung. The content includes meeting protocols, attendance instructions, schedule for the week, and important details for participants. The agenda covers topics related to MAC, PHY, voting status, and collaborative sessions throughout the event in San Diego, CA, USA.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
doc.: IEEE 802.11-18/1042r5 July 2018 July 2018 TGba Agenda Date: 2018-7-7 Authors: Name Minyoung Park Affiliations Address Samsung Phone email mpark.ieee@gmail.com yangyunsong@huawei.com Yunsong Yang Huawei Technologies Submission Slide 1 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 IEEE 802.11 TGba: Wake-up Radio Operation San Diego, CA, USA July 8-13, 2018 Chair: Minyoung Park (Samsung) Vice Chairs: Yunsong Yang (Huawei), Eunsung Park (LGE) Secretary: Leif Wilhelmsson (Ericsson) Technical Editor: Po-Kai Huang (Intel) Submission Slide 2 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Abstract This presentation contains the IEEE 802.11 TGba Wake-up Radio (WUR) Operation agenda for the July 2018 session Submission Slide 3 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Meeting Protocol Please announce your name and affiliation when you first address the group during a meeting slot Submission Slide 4 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Attendance http://newton.meeting.verilan.com 1. Register 2. Indicate attendance Submission Slide 5 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Attendance, Voting & Document Status Make sure your badges are correct If you plan to make a submission be sure it does not contain company logos or advertising Questions on Voting status, Ballot pool, Access to Reflector, Documentation, member s area see Jon Rosdahl jrosdahl@ieee.org Cell Phones Silent or Off Submission Slide 6 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 TGba Schedule for the Week Monday TGba MAC Tuesday Wednesday Thursday TGba PHY TGba AM1 TGba AM2 TGba MAC TGba PHY TGba TGba TGba PM1 TGba/ARC Joint TGba MAC TGba PHY TGba PM2 EVE Nominal Timeblocks: AM0 7am to 8am AM1 8am to 10am AM2 10:30am to 12:30pm PM1 1:30pm to 3:30pm PM2 4pm to 6pm EVE 7:30pm-9:30pm TGba PHY/MAC parallel ad-hoc meetings 0700 to 0800 0800 to 1000 1030 to 1230 1330 to 1530 1600 to 1800 1930 to 2130 Submission Slide 7 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 PHY/MAC Ad-hoc Meetings Monday AM1, Tuesday PM1, Wednesday PM2 MAC ad-hoc meetings Chair: Yunsong Yang Secretary: TBD PHY ad-hoc meetings Monday AM1: Chair: Eunsung Park Secretary: Leif Wilhelmsson Tuesday PM1, Wednesday PM2: Chair: Steve Shellhammer Vice-chair: Eunsung Park Secretary: Leif Wilhelmsson Technical presentations/straw polls Submission Slide 8 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Main Agenda Items for the Week Approve TGba D0.3 Review spec text documents for empty/incomplete subclauses and TBDs in TGba D0.3 to create D1.0 after this meeting highest priority TGba/ARC joint session (Thursday PM2) TGba architecture discussion Review TG timeline Submission Slide 9 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Call for Submissions Call for submissions sent out on July 2: Received 43 submissions (updated on July 7) Group submissions based on priorities Spec text submissions resolving the empty/incomplete subclauses and TBDs in TGba D0.3 (Highest priority) Others Submission Slide 10 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Color code: 1. Presented 2. Deferred 3. Not presented yet 4. Withdrawn PHY Spec Text / TBD resolution Title Presenter Affiliation PHY/MAC Sub category Note DCN 18/1130 18/1131 18/1132 Proposed Spec Text for 32.2.3.1 and 32.2.3.2 Proposed Spec Text for 32.2.4.7 Resolution for TBDs in 32.2.9 Eunsung Park Eunsung Park Eunsung Park LG Electronics PHY LG Electronics PHY LG Electronics PHY Spec text Spec text Spec text Together with 18/1068 18/1156 A comparison of BPSK-Mark Options 18/1068 Proposed Spec Text on the Construction of the BPSK Mark Alphan Sahin 18/1135 the proposed spec text for clause 32.1 introduction 18/1136 the proposed spec text for table 32-1 TX/RX vector 18/1137 the proposed spec text for WUR FDMA transmission 18/1162 spec-text-for-32.2.12 WUR transmit procedure spec-text-for-Time-of-Departure-accuracy-and-text- related-to-CCA 18/1167 Spec Text Revision on WUR Waveform Generation 18/1166 Spec text for WUR receive procedure 18/1194 Spec Text on MC-OOK Symbol Phase Randomization 18/1195 Spec Text on Recommended MC-OOK Symbols 18/1196 Spec Text on Recommended CSD 18/1197 Spec Text on DFS 18/1198 Simulations with Recommended Symbols and CSD 18/1199 Comparison of 2 s MC-OOK Symbols 18/1200 Comparison of Symbol Randomization Techniques 18/1201 Concerns about Sync Detector False Alarms 18/1205 spec-text-for-32.2.7 Alphan Sahin InterDigital InterDigital LG Electronics PHY LG Electronics PHY LG Electronics PHY Intel PHY PHY BPSK-Mark Spec text Spec text Spec text Spec text Spec text Dongguk Lim Dongguk Lim Dongguk Lim Shahrnaz Azizi PHY 18/1163 Shahrnaz Azizi Junghoon Suh Vinod Kristem Steve S. Steve S. Steve S. Steve S. Steve S. Steve S. Steve S. Steve S. Vinod Kristem Intel Huawei Intel Qualcomm Qualcomm Qualcomm Qualcomm Qualcomm Qualcomm Qualcomm Qualcomm Intel PHY PHY PHY PHY PHY PHY PHY PHY PHY PHY PHY PHY Spec text Spec text Spec text Spec text Spec text Spec text Spec text Supporting Doc. Supporting Doc. Supporting Doc. Supporting Doc. Spec text 18/1196 18/1195 18/1194 18/1197? Eq. for P69L20 Submission Slide 11 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 PHY - Others Title Presenter Affiliation PHY/MACSub category DCN 18/1129 Discussion on WUR FDMA padding issues 18/1164 Recommendations on OOK waveform and CSD setting 18/1165 WUR PSD Studies 18/1204 EVM Formulation for OOK Waveform 18/1179 Spectral Line suppression for MC-OOK 18/1218 Example OFDM symbols for the spec. 18/1069 Coexistence Assurance Rui Cao Vinod Kristem Vinod Kristem Rui Yang Miguel Lopez Miguel Lopez Yongho Seok Marvell Intel Intel InterDigital PHY Ericsson Ericsson MediaTek PHY PHY PHY FDMA OOK waveform, CSD WUR PSD EVM for OOK PHY PHY PHY Submission Slide 12 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 MAC Spec Text / TBD Resolution Title Presenter Affiliation PHY/MA C MAC MAC MAC Sub category Note DCN 18/1074 18/1105 18/1157 Proposed Text for Mandatory and Optional DescriptionPo-Kai Huang Intel Proposed Text for WUR MAC Revision Proposed Spec Text on BSS Update Counter Indication Xiaofei Wang InterDigital Spec text Spec text Spec text in PHY/MAC joint Po-Kai Huang Intel Rojan Chitrakar Rojan Chitrakar Rojan Chitrakar Rojan Chitrakar Suhwook Kim LG Electronics MAC Guoqing Li Apple 18/1082r1 Spec text update for WUR Discovery Panasonic MAC Spec text together with 18/1169 18/1168r0 Enabling WUR Protection Panasonic MAC WUR protection 18/1169r0 Spec Text for Enabling WUR Protection Panasonic MAC Spec text 18/1170 18/1121 18/1209 Spec Text Update for WUR FDMA Channel Access Spec text clarification for FDMA spec test for some TBD in sec 31.10 Panasonic MAC Spec text Spec text Spec text MAC Submission Slide 13 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 MAC - Others Title Presenter Affiliation PHY/MACSub category DCN 18/1158 Group Delay for Multicast Wake Up Frames Wake up procedure after receiving Broadcast/Multicast Wake Up Packets 18/1122 Duty Cycle signaling Xiaofei Wang InterDigital MAC Multicast WUR 18/1159 Xiaofei Wang Suhwook Kim InterDigital LG Electronics MAC MAC Multicast WUR Duty cycle Group addressed frame FDMA Discovery period Group ID FDMA Scheduled PS 18/1172 Clarification of WUR frame related to group addressed frame 18/1119 Channel Access for WUR FDMA 18/1120 WUR Discovery Period Announcement 18/1085 Flexible Group ID Allocation 18/1206 Issues on channel usage in WUR FDMA transmission 18/1207 11ba with Conventional Scheduled PS 18/0895 Addressing in VL Wake-up frame (SP) 18/1241 Remaining Issues on Individually-addressed BU Delivery Jeongki Kim Taewon Song Taewon Song Kaiying Lv Hanseul Hong Jinsoo Ahn Woojin Ahn Woojin Ahn LG Electronics MAC LG Electronics MAC LG Electronics MAC ZTE Yonsei Univ. Yonsei Univ. WILUS WILUS MAC MAC MAC MAC MAC Submission Slide 14 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Agenda Monday: AM1 (2 hours) PHY and MAC ad-hoc meetings (parallel) Monday: PM1 (2 hours) Call meeting to order, TGba introduction Call for submissions Review agenda and approval IEEE 802 and 802.11 IPR Policy and procedure Participation in IEEE 802 Meetings Summary from May 2018 meeting Motion: May 2018 meeting (doc: IEEE 802.11-18/999r0, 18/1006r0) and teleconference minutes (doc: IEEE 802.11-18/1011r1) approval Motion: TGba D0.3 approval Presentations, Recess Monday: PM2 (2 hours) Call meeting to order IEEE 802 and 802.11 IPR Policy and procedure Presentations, Recess Tuesday: AM1 (2 hours) Call meeting to order IEEE 802 and 802.11 IPR Policy and procedure Presentations, Recess Tuesday: PM1 (2 hours) PHY and MAC ad-hoc meetings (parallel) Wednesday: PM1 (2 hours) Call meeting to order IEEE 802 and 802.11 IPR Policy and procedure Presentations, Recess Wednesday : PM2 (2 hours) PHY and MAC ad-hoc meetings (parallel) Thursday: AM2 (2 hours) Call meeting to order IEEE 802 and 802.11 IPR Policy and procedure Motions Presentations, Recess Thursday: PM1 (2 hours) Call meeting to order IEEE 802 and 802.11 IPR Policy and procedure TGba draft status check ready for D1.0? TG timeline discussion Goal for September 2018 F2F meeting Teleconference call schedule Presentations, Recess Thursday: PM2 (2 hours) Call meeting to order IEEE 802 and 802.11 IPR Policy and procedure TGba/ARC joint session Presentations Adjourn Submission Slide 15 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: Show slides #1 through #4 of this presentation Advise the WG attendees that: IEEE s patent policy is described in Clause 6 of the IEEE-SA Standards Board Bylaws; Early identification of patent claims which may be essential for the use of standards under development is strongly encouraged; There may be Essential Patent Claims of which IEEE is not aware. Additionally, neither IEEE, the WG, nor the WG Chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development. Instruct the WG Secretary to record in the minutes of the relevant WG meeting: That the foregoing information was provided and that slides 1 through 4 (and this slide 0, if applicable) were shown; That the chair or designee provided an opportunity for participants to identify patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) of which the participant is personally aware and that may be essential for the use of that standard Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom. The WG Chair shall ensure that a request is made to any identified holders of potential essential patent claim(s) to complete and submit a Letter of Assurance. It is recommended that the WG Chair review the guidance in IEEE-SA Standards Board Operations Manual 6.3.5 and in FAQs 14 and 15 on inclusion of potential Essential Patent Claims by incorporation or by reference. Note: WG includes Working Groups, Task Groups, and other standards-developing committees with a PAR approved by the IEEE-SA Standards Board. Submission Slide 16 Minyoung Park (Samsung) (Optional to be shown)
doc.: IEEE 802.11-18/1042r5 July 2018 Participants have a duty to inform the IEEE Participants shall inform the IEEE (or cause the IEEE to be informed) of the identity of each holder of any potential Essential Patent Claims of which they are personally aware if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents Participants should inform the IEEE (or cause the IEEE to be informed) of the identity of any other holders of potential Essential Patent Claims Early identification of holders of potential Essential Patent Claims is encouraged Slide #1 Submission Slide 17 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Ways to inform IEEE Cause an LOA to be submitted to the IEEE-SA (patcom@ieee.org); or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible; or Speak up now and respond to this Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance, please respond at this time by providing relevant information to the WG Chair Slide #2 Submission Slide 18 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Other guidelines for IEEE WG meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don t discuss the interpretation, validity, or essentiality of patents/patent claims. Don t discuss specific license rates, terms, or conditions. Relative costs of different technical approaches that include relative costs of patent licensing terms may be discussed in standards development meetings. Technical considerations remain the primary focus Don t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don t discuss the status or substance of ongoing or threatened litigation. Don t be silent if inappropriate topics are discussed do formally object. --------------------------------------------------------------- For more details, see IEEE-SA Standards Board Operations Manual, clause 5.3.10 and Antitrust and Competition Policy: What You Need to Know at http://standards.ieee.org/develop/policies/antitrust.pdf Slide 19 Slide #3 Submission Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Patent-related information The patent policy and the procedures used to execute that policy are documented in the: IEEE-SA Standards Board Bylaws (http://standards.ieee.org/develop/policies/bylaws/sect6-7.html#6) IEEE-SA Standards Board Operations Manual (http://standards.ieee.org/develop/policies/opman/sect6.html#6.3) http://standards.ieee.org/about/sasb/patcom/materials.html Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at patcom@ieee.org Slide #4 Submission Slide 20 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Participation in IEEE 802 Meetings Participation in any IEEE 802 meeting (Sponsor, Sponsor Subgroup, Working Group, Working Group Subgroup, etc.) is on an individual basis Participants in the IEEE standards development individual process shall act based on their qualifications and experience. (https://standards.ieee.org/develop/policies/bylaws/sb_bylaws.pdfsection 5.2.1) participate in the consensus process in a manner consistent with their professional expert opinion as individuals, and not as organizational representatives . (subclause 4.2.1 Establishment , of the IEEE 802 LMSC Working Group Policies and Procedures) Participants have an obligation to act and vote as an individual and not under the direction of any other individual or group. A Participant s obligation to act and vote as an individual applies in all cases, regardless of any external commitments, agreements, contracts, or orders. Participants shall not direct the actions or votes of any other member of an IEEE 802 Working Group or retaliate against any other member for their actions or votes within IEEE 802 Working Group meetings, see https://standards.ieee.org/develop/policies/bylaws/sb_bylaws.pdf section 5.2.1.3 and the IEEE 802 LMSC Working Group Policies and Procedures, subclause 3.4.1 Chair , list item x. By participating in IEEE 802 meetings, you accept these requirements. If you do not agree to these policies then you shall not participate. IEEE 802 Working Group membership is by individual; Working Group members shall (Latest revision of IEEE 802 LMSC Working Group Policies and Procedures: http://www.ieee802.org/devdocs.shtml) Slide 21 Submission Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 IEEE-SA policy documents IEEE Code of Ethics http://www.ieee.org/about/corporate/governance/p7-8.html IEEE Standards Association (IEEE-SA) Affiliation FAQ http://standards.ieee.org/faqs/affiliation.html Antitrust and Competition Policy http://standards.ieee.org/resources/antitrust-guidelines.pdf Letter of Assurance Form http://standards.ieee.org/develop/policies/bylaws/sect6-7.html#loa https://development.standards.ieee.org/myproject/Public//mytools/mob/loa.pdf IEEE-SA Patent Committee FAQ & Patent slides http://standards.ieee.org/board/pat/faq.pdf and http://standards.ieee.org/board/pat/pat-slideset.ppt Submission Slide 22 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Current IEEE-SA Rule documents The current version of the IEEE-SA Standards Board Bylaws is available at: http://standards.ieee.org/develop/policies/bylaws/index.html (HTML version) http://standards.ieee.org/develop/policies/bylaws/sb_bylaws.pdf (PDF version) The current version of the IEEE-SA Standards Board Operations Manual is available at: http://standards.ieee.org/develop/policies/opman/index.html (HTML version) http://standards.ieee.org/develop/policies/opman/sb_om.pdf (PDF version) Submission Slide 23 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Current IEEE 802, 802.11 rules documents IEEE 802 Policies & Procedures (link to AudCom, approved by IEEE-SA Standards Board June 2014) http://standards.ieee.org/board/aud/LMSC.pdf IEEE 802 Operations Manual (13 Nov 2015) http://www.ieee802.org/PNP/approved/IEEE_802_OM_v18.pdf IEEE 802 Working Group Policies &Procedures (13 Nov 2015) http://www.ieee802.org/PNP/approved/IEEE_802_WG_PandP_v18.1.pdf (editor update) IEEE 802 LMSC Chair's Guidelines (18 Mar 2016) http://www.ieee802.org/PNP/approved/IEEE_802_Chairs_guidelines_v23.pdf IEEE 802.11 WG OM: (13 Nov 2015) https://mentor.ieee.org/802.11/dcn/14/11-14-0629-14-0000-802-11-operations- manual.docx Policies and Procedures hierarchy http://www.ieee802.org/11/Rules/rules.shtml IEEE 802 Procedural document website: http://www.ieee802.org/devdocs.shtml Submission Slide 24 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Monday AM1 (MAC Ad-hoc group) Room Harbor G - 2th floor Call meeting to order IEEE 802 and 802.11 IPR Policy and procedure Presentations (from the submission slides - MAC list): 11-18-1105r0 11-18-1082r1 11-18-1157r1 11-18-1121r0 11-18-1082r2 (with SP) 11-18-1168r0 (Q&A unfinished) Adjourn Submission Slide 25 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Tuesday PM1 (MAC Ad-hoc group) Room Harbor H/I - 2th floor Call meeting to order IEEE 802 and 802.11 IPR Policy and procedure Presentations (from the submission slides - MAC list): Recess Submission Slide 26 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Wednesday PM2 (MAC Ad-hoc group) Room Harbor G - 2th floor Call meeting to order IEEE 802 and 802.11 IPR Policy and procedure Presentations (from the submission slides - MAC list): Adjourn Submission Slide 27 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Summary from May 2018 Meeting and Teleconference Calls Approved TGba SFD and TGba D0.2 Closed TGba SFD (Final document is 11-18/575r11) Reviewed and approved spec text documents for TGba D0.3 Reviewed technical presentations TGba/ARC joint session TGba architecture discussion Reviewed TG timeline Agenda: doc:11-18/647r12 Submission Slide 28 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Motion - Minutes Approve TGba minutes of May 2018 meeting [doc: IEEE 802.11-18/999r0 and IEEE 802.11-18/1006r0] and teleconference calls [doc: IEEE 802.11-18/1011r1] Move: Po-kai Huang Second: Xiaofei Wang Result: approved by unanimous consensus Submission Slide 29 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Motion TGba Draft Spec Move to approve P802.11ba D0.3 in IEEE 802.11 WG Members Area as the latest revised draft of TGba. Move: Po-kai Huang Second: Lei Huang Result: Y/N/A = 29/0/1. Motion passes. Submission Slide 30 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Presentations From the submission slides Monday PM1 (TGba) 11-18-1122, 11-18-1130, 11-18-1085 withdrawn. 11-18-1074r0 (to be updated as r1) 11-18-1201r0 (more offline discussions) 11-18-1131r0 (with SP) 11-18-1132r0 (with SP) Monday PM2 (TGba) 11-18-1205r4 (Q&A) 11-18-1069r0 (need approval if going for WG LB) 11-18-1162r0 (update expected) 11-18-1163r0 (with SP) 11-18-1167r2 (update expected) 11-18-1194r0, 1195r0, 1196r0, 1197r0, 1198r0, 1199r0 (minus Q&A) Submission Slide 31 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Presentations (cont d) From the submission slides Tuesday AM1 (TGba) 11-18-1199r0 (Q&A) 11-18-1200r0 11-18-1068r2 11-18-1168r0 (Q&A) Continue with the MAC list Submission Slide 32 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Motions (Thursday AM2) PHY: MAC: Submission Slide 33 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 TGba Draft Spec Status Review Are we ready for D1.0? Discussion Submission Slide 34 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 TGba Timeline 2017 January: TGba formation meeting 2018 January: TGba Draft 0.1 July: TGba Draft 1.0 November: TGba Draft 2.0 2019: March: MDR (mandatory document review) July: formation of sponsor ballot pool September: Sponsor ballot 2020 July: RevCom We are here Submission Slide 35 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Goal for September 2018 TBD TBD TBD Review TG timeline Submission Slide 36 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Teleconference Call Schedule Proposed schedule (Mondays, 1 hour each) July 23 (10:00 ET) August 6 (17:00ET) August 20 (23:00ET) Submission Slide 37 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Backup Slides Submission Slide 38 Minyoung Park (Samsung)
doc.: IEEE 802.11-18/1042r5 July 2018 Proposed TGba Spec Development Process Technical proposal proposalTechnical proposal Technical Technical proposal Consensus? No Yes (TG approval) TGba Spec Draft 1.0 Comment collection/ Resolution TGba Spec Draft 0.1 Spec Framework Document (SFD) SFD has enough details for TGba Spec D0.1? Yes No Submission Slide 39 Minyoung Park (Samsung)