IEEE 802.3 Ad Hoc Meeting Highlights

Download Presenatation
IEEE 802.3 Ad Hoc Meeting Highlights
Slide Note
Embed
Share

In the July 2023 IEEE 802.3 ad hoc meeting, various amendments were reviewed and discussed, including projects related to Ultra High Reliability in WLANs. Feedback on project clarity and scope was provided for further refinement. The meeting aimed to gather input from different working groups and ensure the relevance and accuracy of ongoing initiatives within the IEEE 802.3 framework.

  • IEEE
  • 802.3
  • Ad Hoc Meeting
  • Ultra High Reliability
  • WLAN

Uploaded on Oct 05, 2024 | 5 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. 802.3 PARs ad hoc IEEE 802.3 ad hoc on PARs from other WGs Robert M. Grow, ad hoc chair RMG Consulting July 2023 Hybrid Plenary 26 June 2023 (held pre-plenary) IEEE 802.3 WG PAR ad hoc, July 2023, Hybrid Plenary 1

  2. Agenda and notes Agenda Welcome PAR review Note: Comments reflect a consensus of ad hoc meeting attendees. Ad Hoc Chair tasked to post comments to EC reflector prior to deadline. Ad Hoc Chair tasked to report on responses from other WGs to 802.3. IEEE 802.3 WG PAR ad hoc, July 2023, Hybrid Plenary 2

  3. IEEE P802.1Qdy YANG for the Multiple Spanning Tree Protocol Amendment project PAR: PAR No comments. CSD 1.2.1 The first use of MSTP is not accompanied by an unexpanded name next to the acronym Multiple Spanning Tree Protocol (MSTP) . Optionally, add (MSTP) to title on PAR and CSD (this might produce better search results). IEEE 802.3 WG PAR ad hoc, July 2023, Hybrid Plenary 3

  4. IEEE P802.11bn - Amendment: Enhancements for Ultra High Reliability Amendment project PAR PAR 2.1 It isn t clear if the project is addressing hardware reliability or transmission reliability. These are very different things and this should be significantly more clear. 5.2,b While the project scope may be technically accurate, it is very difficult to actually figure out what the goals of the project are. Please consider this in any rewrite. IEEE 802.3 WG PAR ad hoc, July 2023, Hybrid Plenary 4

  5. IEEE P802.11bn - Amendment: Enhancements for Ultra High Reliability (2) 5.2.b The project scope begins with an extremely difficult to parse run-on sentence. It would be helpful to know if these enhancements will apply to all 802.11 PHY types, or only selected PHY types (all PHY types is assumed in the following proposed revision of the project scope because of the listing of frequencies). Would the following better introduce the bulleted list: This amendment defines modifications to both IEEE Std 802.11 physical layers (PHYs) and the IEEE Std 802.11 Medium Access Control (MAC). The modifications will add Ultra High Reliability capability to Wireless Local Area Network (WLAN) Basic Service Sets (BSSs) or overlapping BSSs by providing: IEEE 802.3 WG PAR ad hoc, July 2023, Hybrid Plenary 5

  6. IEEE P802.11bn - Amendment: Enhancements for Ultra High Reliability (3) 5.2.b It isn t clear what the box after the list bullets was supposed to be (see posted PDF). 8.1, 2.1 explanation This is the only hyphenated usage of ultra high, be consistent. (It appears that Ultra High is chosen to agree with the previously used Extremely High (including capitalization within a sentence.) 8.1, 5.5 explanation, 3rdparagraph Typo? (Basis Service Set) . CSD 1.2.1 The answer is not responsive for this particular project. The Broad Market Potential response addresses wireless LAN in general, not the broad market for Ultra High Reliability. IEEE 802.3 WG PAR ad hoc, July 2023, Hybrid Plenary 6

  7. IEEE P60802 Time-Sensitive Networking Profile for Industrial Automation PAR modification request PAR No comments on the addition to the Scope. CSD No comments (no changes to CSD indicated). IEEE 802.3 WG PAR ad hoc, July 2023, Hybrid Plenary 7

  8. IEEE P802.1DG Time-Sensitive Networking Profile for Automotive In-Vehicle Ethernet PAR extension request PAR 3.5 The fact that this project is still in TG ballot after more than 4 years with the third TG ballot producing 540 comments and the most recent producing 189 comments. Its TG ballot status though raises concern if the project will be completed in two more years. That said, we trust 802.1 to have evaluated if consensus is moving forward now raising the probability of timely completion, and therefore support the extension. CSD No comments, no changes indicated. IEEE 802.3 WG PAR ad hoc, July 2023, Hybrid Plenary 8

  9. IEEE P802.1Qdj Configuration Enhancements for Time- Sensitive Networking PAR extension request: PAR No comments. CSD No comments, no changes indicated. IEEE 802.3 WG PAR ad hoc, July 2023, Hybrid Plenary 9

  10. IEEE 802 'Network Enhancements for the Next Decade' Industry Connections Activity (Nendica) ICAID renewal ICAID No comments. IEEE 802.3 WG PAR ad hoc, July 2023, Hybrid Plenary 10

Related


More Related Content