IEEE P802.15 Working Group Timeline Comparison

april 2021 n.w
1 / 4
Embed
Share

Explore the timeline differences between standard development processes for IEEE P802.15.4z and the proposed accelerated schedule for IEEE 15-21-0xxx-00-nuwb, highlighting key milestones and anticipated publication dates. Stay updated on the evolving landscape of wireless personal area networks.

  • IEEE
  • Wireless Networks
  • Timeline
  • Standard Development
  • WPANs

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. April 2021 doc.: IEEE 15-21-0xxx-00-nuwb Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SG4ab Timeline Source: Benjamin A. Rolfe (Blind Creek Associates) Contact: Voice: +1 408 395 7207, E-Mail: ben.rolfe @ ieee.org Re: Study Group 4ab: UWB Next Generation Abstract: The case of two possible timelines Purpose: To pretend it s not wibbly wobbly Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. B. Rolfe (BCA)

  2. April 2021 doc.: IEEE 15-21-0xxx-00-nuwb Timeline Based on .4z 802.15.4z started in Feb 2018 and ended with approved draft in June 2020 (28 months) Features added in 802.15.4z Enhanced ranging with SS-TWR One-to-many multi-node ranging Ciphered Sequences Higher PRFs Ranging for LPR UWB PHY Increased security for both PHYs The scope of 802.15.4ab is broader than 802.15.4z (see PAR and CSD) Roughly ~2x more scope than 15.4z Therefore, twice as long, or ~4.5 years for a published draft in ~12/25 B. Rolfe (BCA) Slide 2

  3. April 2021 doc.: IEEE 15-21-0xxx-00-nuwb Accelerated Timeline (pulling out all the stops) 2021 2022 2024 2023 2025 Task Group Launch (9/21) Study Group Launch (3/21) TGD DRAFT DEV Finish Work 3/24 TGD TGD (7/21 - 3/22) (3/21 - 7/21) .4ab Publish (~June 24) .4ab .4ab 1st LB (5/22) .4ab LB Rcrc1 (9/22) .4ab LB Rcrc2* (1/23) .4ab 1st SB (5/23) .4ab SB Rcrc1 (9/23) .4ab SB Rcrc2* (1/24) Pre Draft (1/22) * 3rd recirc might be needed (TBD) B. Rolfe (BCA) Slide 3

  4. April 2021 doc.: IEEE 15-21-0xxx-00-nuwb Questions? B. Rolfe (BCA) Slide 4