IHO Lab ENC Conversion Project Update Edition 1.0.0
This project involves building, executing, and reporting on a conversion pipeline using data and software tools. Test conversions will be conducted to analyze the ENC conversion document and provide feedback. Recommendations for edition 2.0.0 of the conversion guidance document will be made after analyzing the data and performing root cause analysis. The project steps include data and tool assembly, assessment, and validation of S-57 conversion to S-101, analysis, cross-checking, and reporting, as well as delivering proposals for conversion guidance and co-production of data to support Dual Fuel operations.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
IHO Lab ENC conversion project update Edition 1.0.0 of the conversion guidance has been published Will need updating as the DCEG/S-101PS is updated The concept of the project is to build, execute and report on a conversion pipeline comprising data and software tools. A programme of test conversions will be executed which will analyse the ENC conversion document and provide feedback on its content. The project should make recommendations for edition 2.0.0 of the conversion guidance document
Project Execution The project contains the following steps: Data and Tool Assembly (industry and HO partners) For each dataset identified: Assessment and Validation of S-57 Conversion to S-101 Any post-conversion editing required + S-101 validation Analysis, cross-checking and reporting. Once all datasets identified have been processed, root cause analysis of the conversion document contents, and common areas for update will be identified.
Project deliverables in two phases: - Analysis and Proposals for the conversion guidance - Proposals and guidance for co-production of data to support Dual Fuel operations.
Resourcing and Timelines Project Timeline will be dependent on available resources Necessary resourcing Hardware and Operations Resources to run tests against data Input data (S-57) representative ENC cells and existing test datasets (S-64) Data should be accessible from member state participants and software tools from industry partners. Resources to perform analysis and cross-reference with conversion guidance document required. This will produce the overall conclusions of the project and the inputs to Conversion Guidance document Dual Fuel co-production guidance.