In this enlightening lesson, Todd Johnson emphasizes the significance of apostrophes. Issues in power regulation at the Kautz Road substation are causing delays, impacting the site's operations. Focus is on resolving these issues and achieving the desired power output by Christmas. Various technical challenges, such as system leaks and connector fixes, are being addressed, aiming to improve the overall functionality of the facility. Contamination and resistivity issues have also been identified and are being investigated further. Access days are scheduled for maintenance and troubleshooting, with plans for future upgrades and enhancements in place.

  • Apostrophes
  • Grammar Lesson
  • Power Regulation
  • Technical Challenges
  • Facility Operations

Uploaded on Feb 21, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. f f f Main Injector / Recycler Phil Adamson November 12th2014 This delightful lesson in the importance of apostrophes courtesy of Todd Johnson

  2. f f f NuMI Beam

  3. f f f Downtime MI30U filter choke overcurrent MI60U VCB opened on transformer oil temp MIRF20 replace modulator RRRF02 turns itself off a few times per day

  4. f For the last week, the whole site has been running from the Kautz Road substation In preparation for Master Substation upgrade next year Linac & Booster have significant issues with power regulation We are basically stalled until these issues are resolved or we switch back to the normal configuration Our goal is to achieve 400kW (2+6 slip-stacking) by Christmas f f Kautz Road

  5. f f f $23: Left: Just MI. Right: MI + NuMI

  6. f f f $21

  7. f f f Beamline, but no MI ramp MIRF on MIRF off

  8. f Major Cavity system LCW leak found on booster cavity in test cave Two minor leaks found and fixed in tunnel Two broken Recycler BPM connectors fixed MI Collimator problems Cabling problem with H motion for 303 collimator Questions about some limit switches Will spend next access day working on these Collimators now in 0 position (out of beam) f f Access on Tuesday Morning

  9. f Resistivity of MI LCW crashed during fill Thursday morning f f Contamination of MI LCW Slazyk says he knows what happened, and will address at CUB in the next MI access

  10. f Running beam through recycler to NuMI to scrub new beam pipe (and kickers, Lambertson, ) at RR52. f f Recycler Scrubbing

  11. f Before shutdown, fast horizontal instability blew up beam at about 3.8E12 for the first batch, with only RRRF02 on Threshold lower with either just RRRF01 or with both RF stations f f Status of recycler instability Now, we can still see instability, but: Blowup seems less dramatic To see blowup, require intensities above 4E12, both RF stations on, plus some tweaks Perhaps a suggestion that with RF feedback off, RRRF01 is still worse, but it s a mild suggestion At present, it doesn t look like this will be an impediment for slip-stacking

  12. f Address MI30U PS issues Fix MI collimators Fix resitivity issue at CUB Debug / fix RRRF02 turn- off problem f f To Do RR Scrubbing Establish 6 batch $2A normal operation RR Lattice measurement study Xiao, Yang Parasitic measurement of Q of higher-order modes in RRRF cavities Madrak, Lebedev 2+6 slip-stacking is coming